CitEc
home      Information for:  researchers | archive maintainers        warning | faq
 Updated January, 4 2010 234.510 documents processed, 5.249.629 references and 2.248.145 citations

 

 
 

The Electricity Journal

Raw citation data, Impact Factor, Immediacy Index, Published documents, Citations received, , Most cited papers , Recent citations and documents published in this series in EconPapers.

Create citation feed for this series

Raw data:
IF AIF DOC CIT D2Y C2Y SC(%) CiY II AII
19960.010.1811311189100.09
199700.21128192091030.020.08
19980.010.25140241200.1
19990.010.3282221421020.020.15
20000.020.439716962010.010.19
20010.010.419723179200.17
20020.030.449243194500.2
20030.030.479320189500.22
20040.050.528871859010.010.23
20050.040.5683141818020.020.25
20060.020.579581714030.030.24
20070.020.488531784010.010.22
 
 
IF: Impact Factor: C2Y / D2Y
AIF: Average Impact Factor for series in RePEc in year y
DOC: Number of documents published in year y
CIT: Number of citations to the series in year y
D2Y: Number of articles published in y-1 plus y-2
C2Y: Cites in y to articles published in y-1 plus y-2
SC(%): Percentage of selft citations in y to articles published in y-1 plus y-2
CiY: Cites in year y to documents published in year y
IdI: Immediacy Index: CiY / Documents.
 
AII: Average Immediacy Index for series in RePEc in year y
Impact Factor:
Immediacy Index:
Documents published:
Citations received:

 

Most cited documents in this series:

(1) RePEc:eee:jelect:v:15:y:2002:i:5:p:51-62 The Effect on Asset Values of the Allocation of Carbon Dioxide Emission Allowances (2002).
Cited: 19 times.

(2) RePEc:eee:jelect:v:12:y:1999:i:8:p:77-85 Transmission Rights and Market Power (1999).
Cited: 14 times.

(3) RePEc:eee:jelect:v:8:y:1995:i:3:p:24-35 Nodal prices and transmission rights: A critical appraisal (1995).
Cited: 10 times.

(4) RePEc:eee:jelect:v:10:y:1997:i:7:p:67-75 SO2 allowance trading: How do expectations and experience measure up? (1997).
Cited: 8 times.

(5) RePEc:eee:jelect:v:19:y:2006:i:2:p:79-90 CO2 Allowance Allocation in the Regional Greenhouse Gas Initiative and the Effect on Electricity Investors (2006).
Cited: 6 times.

(6) RePEc:eee:jelect:v:7:y:1994:i:2:p:28-37 The behavior of the allowance market: Theory and evidence (1994).
Cited: 6 times.

(7) RePEc:eee:jelect:v:14:y:2001:i:6:p:70-79 Uniform Pricing or Pay-as-Bid Pricing: A Dilemma for California and Beyond (2001).
Cited: 5 times.

(8) RePEc:eee:jelect:v:7:y:1994:i:2:p:20-27 Utilities and state regulators are failing to take advantage of emission allowance trading (1994).
Cited: 5 times.

(9) RePEc:eee:jelect:v:16:y:2003:i:10:p:68-80 Gaming the Regulator: A Survey (2003).
Cited: 5 times.

(10) RePEc:eee:jelect:v:14:y:2001:i:2:p:13-24 Interregional Coordination versus RTO Mergers: A Cost-Benefit Perspective (2001).
Cited: 5 times.

(11) RePEc:eee:jelect:v:13:y:2000:i:8:p:38-58 Flow-Based Transmission Rights and Congestion Management (2000).
Cited: 5 times.

(12) RePEc:eee:jelect:v:7:y:1994:i:2:p:60-65 Valuing flexibility in utility planning (1994).
Cited: 4 times.

(13) RePEc:eee:jelect:v:18:y:2005:i:7:p:43-54 A Capacity Market that Makes Sense (2005).
Cited: 4 times.

(14) RePEc:eee:jelect:v:15:y:2002:i:7:p:53-62 The Political Economy of Long-Term Generation Adequacy: Why an ICAP Mechanism is Needed as Part of Standard Market Design (2002).
Cited: 4 times.

(15) RePEc:eee:jelect:v:16:y:2003:i:7:p:11-37 Diagnosing the California Electricity Crisis (2003).
Cited: 4 times.

(16) RePEc:eee:jelect:v:10:y:1997:i:3:p:2-2 Getting markets to clear (1997).
Cited: 3 times.

(17) RePEc:eee:jelect:v:13:y:2000:i:6:p:49-57 Understanding Competitive Pricing and Market Power in Wholesale Electricity Markets (2000).
Cited: 3 times.

(18) RePEc:eee:jelect:v:18:y:2005:i:4:p:53-63 Quantifying Customer Response to Dynamic Pricing (2005).
Cited: 3 times.

(19) RePEc:eee:jelect:v:15:y:2002:i:6:p:45-55 The Value of Dynamic Pricing in Mass Markets (2002).
Cited: 3 times.

(20) RePEc:eee:jelect:v:9:y:1996:i:10:p:10-15 Electricity restructuring and the environment (1996).
Cited: 3 times.

(21) RePEc:eee:jelect:v:15:y:2002:i:9:p:72-80 Simultaneous Optimal Auction and Unit Commitment for Deregulated Electricity Markets (2002).
Cited: 3 times.

(22) RePEc:eee:jelect:v:14:y:2001:i:4:p:19-24 Heresy? The Case Against Deregulation of Electricity Generation (2001).
Cited: 3 times.

(23) RePEc:eee:jelect:v:15:y:2002:i:7:p:72-81 Modeling Electricity Auctions (2002).
Cited: 3 times.

(24) RePEc:eee:jelect:v:6:y:1994:i:10:p:73-73 A study of the privatisation of the electricity supply industry in England and Wales (1994).
Cited: 3 times.

(25) RePEc:eee:jelect:v:8:y:1995:i:3:p:50-67 Market-based IRP: Its easy!!! (1995).
Cited: 3 times.

(26) RePEc:eee:jelect:v:15:y:2002:i:6:p:69-77 Deregulation of the Swiss Electricity Industry: Short-Run Implications for the Hydropower Sector (2002).
Cited: 3 times.

(27) RePEc:eee:jelect:v:16:y:2003:i:10:p:30-38 Benchmarking for Distribution Utilities: A Problematic Approach to Defining Efficiency (2003).
Cited: 3 times.

(28) RePEc:eee:jelect:v:17:y:2004:i:1:p:26-36 The State of Retail Electricity Markets in the U.S. (2004).
Cited: 2 times.

(29) RePEc:eee:jelect:v:9:y:1996:i:9:p:42-55 Transmission capacity reservations implemented through a spot market with transmission congestion contracts (1996).
Cited: 2 times.

(30) RePEc:eee:jelect:v:18:y:2005:i:10:p:62-69 Better Power Contracts: Using Flexibility to Increase Value (2005).
Cited: 2 times.

(31) RePEc:eee:jelect:v:8:y:1995:i:4:p:39-49 Seeing the forest from the trees: Emergence of the competitive franchise (1995).
Cited: 2 times.

(32) RePEc:eee:jelect:v:16:y:2003:i:8:p:47-60 Improving Market Power Mitigation Rules for Peaking Units (2003).
Cited: 2 times.

(33) RePEc:eee:jelect:v:6:y:1993:i:7:p:76-77 A survey of current real-time pricing programs (1993).
Cited: 2 times.

(34) RePEc:eee:jelect:v:10:y:1997:i:9:p:13-21 Local government: the sleeping giant in electric industry restructuring (1997).
Cited: 2 times.

(35) RePEc:eee:jelect:v:5:y:1992:i:4:p:53-67 Weighing environmental externalities: Lets do it right! (1992).
Cited: 2 times.

(36) RePEc:eee:jelect:v:10:y:1997:i:7:p:61-66 SO2 emissions trading: does it work? (1997).
Cited: 2 times.

(37) RePEc:eee:jelect:v:14:y:2001:i:8:p:40-51 What Is It Worth? Application of Real Options Theory to the Valuation of Generation Assets (2001).
Cited: 2 times.

(38) RePEc:eee:jelect:v:4:y:1991:i:2:p:20-33 Full-cost dispatch: Incorporating environmental externalities in electric system operation (1991).
Cited: 2 times.

(39) RePEc:eee:jelect:v:18:y:2005:i:8:p:11-21 Electricity Resource Adequacy: Matching Policies and Goals (2005).
Cited: 2 times.

(40) RePEc:eee:jelect:v:9:y:1996:i:6:p:37-49 Efficiency and sustainability in restructured electricity markets: the renewables portfolio standard (1996).
Cited: 2 times.

(41) RePEc:eee:jelect:v:15:y:2002:i:3:p:60-69 What We Can Learn from a Statistical Analysis of Electricity Prices in New South Wales (2002).
Cited: 2 times.

(42) RePEc:eee:jelect:v:8:y:1995:i:4:p:50-54 Estimating the impacts of restrictions on utility participation in the SO2 allowance market (1995).
Cited: 2 times.

(43) RePEc:eee:jelect:v:13:y:2000:i:2:p:41-54 The Big Retail Bust: What Will It Take to Get True Competition? (2000).
Cited: 2 times.

(44) RePEc:eee:jelect:v:10:y:1997:i:5:p:34-45 What should a power marketer want? (1997).
Cited: 1 times.

(45) RePEc:eee:jelect:v:13:y:2000:i:10:p:69-74 Load Profiling for Retail Choice: Examining a Complex and Crucial Component of Settlement (2000).
Cited: 1 times.

(46) RePEc:eee:jelect:v:15:y:2002:i:9:p:11-24 Market Power in Deregulated Wholesale Electricity Markets: Issues in Measurement and the Cost of Mitigation (2002).
Cited: 1 times.

(47) RePEc:eee:jelect:v:18:y:2005:i:9:p:28-42 Generation Adequacy via Call Options Obligations: Safe Passage to the Promised Land (2005).
Cited: 1 times.

(48) RePEc:eee:jelect:v:12:y:1999:i:3:p:20-30 Where Function Follows Form: International Comparisons of Restructured Electricity Markets (1999).
Cited: 1 times.

(49) RePEc:eee:jelect:v:13:y:2000:i:9:p:78-89 Do We Need More Transmission Capacity? (2000).
Cited: 1 times.

(50) RePEc:eee:jelect:v:15:y:2002:i:3:p:76-80 Stimulating New Transmission Investments (2002).
Cited: 1 times.

Recent citations received in: | 2007 | 2006 | 2005 | 2004

Recent citations received in: 2007

(1) RePEc:rne:rneart:v:6:y:2007:i:3:p:397-424 International Perspectives on Electricity Market Monitoring and Market Power Mitigation (2007). Review of Network Economics

Recent citations received in: 2006

(1) RePEc:nwu:cmsems:1429 Trading for the Future: Signaling in Permit Markets (2006). Northwestern University, Center for Mathematical Studies in Economics and Management Science / Discussion Papers

(2) RePEc:rff:dpaper:dp-06-28 Simple Rules for Targeting CO2 Allowance Allocations to Compensate Firms (2006). Resources For the Future / Discussion Papers

(3) RePEc:rff:dpaper:dp-06-49 Output and Abatement Effects of Allocation Readjustment in Permit Trade (2006). Resources For the Future / Discussion Papers

Recent citations received in: 2005

(1) RePEc:cla:levrem:784828000000000222 Interface between Engineering and Market Operations in Restructured Electricity Markets (2005). UCLA Department of Economics / Levine's Bibliography

(2) RePEc:rff:dpaper:dp-05-50 Alleged Transmission Undersupply: Is Restructuring the Cure or the Cause? (2005). Resources For the Future / Discussion Papers

Recent citations received in: 2004

(1) RePEc:mop:credwp:04.11.52 Consequences of Electricity Restructuring on the Environment: a Survey (2004). CREDEN (Centre de Recherche en Economie et Droit de l'Energie), Faculty of Economics, University of Montpellier 1 / Cahiers du CREDEN (CREDEN Working

Warning!! This is still an experimental service. The results of this service should be interpreted with care, especially in research assessment exercises. The processing of documents is automatic. There still are errors and omissions in the identification of references. We are working to improve the software to increase the accuracy of the results.

Source data used to compute the impact factor of RePEc series.

Hosted by Valencian Economic Research Institute ©2010 Jose Manuel Barrueco | mail: barrueco@uv.es