International Journal of Production Economics
Raw citation data, Impact Factor, Immediacy Index, Published documents, Citations received, , Most cited papers , Latest citations and documents published in this series in EconPapers.
Raw data: | |
|
IF |
AIF |
DOC |
CIT |
D2Y |
C2Y |
SC(%) |
CiY |
II |
AII |
1996 | | 0.17 | 176 | 13 | 303 | | 0 | | | 0.08 |
1997 | | 0.2 | 150 | 9 | 313 | | 0 | | | 0.08 |
1998 | | 0.23 | 114 | 13 | 326 | | 0 | | | 0.1 |
1999 | | 0.32 | 182 | 19 | 264 | | 0 | 1 | 0.01 | 0.16 |
2000 | 0.02 | 0.43 | 155 | 14 | 296 | 7 | 0 | | | 0.19 |
2001 | 0 | 0.39 | 175 | 19 | 337 | 1 | 0 | 2 | 0.01 | 0.17 |
2002 | 0.01 | 0.42 | 147 | 32 | 330 | 3 | 0 | 3 | 0.02 | 0.2 |
2003 | 0.03 | 0.47 | 153 | 12 | 322 | 10 | 0 | 2 | 0.01 | 0.22 |
2004 | 0.03 | 0.51 | 159 | 16 | 300 | 8 | 0 | 3 | 0.02 | 0.23 |
|   |
  |
Impact Factor:
|   |
Immediacy Index:
|   |
Documents published:
|   |
Citations received:
|   |
  Most cited documents in this series: (1) RePEc:eee:proeco:v:76:y:2002:i:1:p:61-85 Knowledge capital and performance heterogeneity: : A firm-level innovation study (2002). Cited: 16 times. (2) RePEc:eee:proeco:v:93-94:y:2005:i:1:p:75-86 Inventory investment and output volatility (2005). Cited: 6 times. (3) RePEc:eee:proeco:v:39:y:1995:i:1-2:p:137-144 Productivity and quality changes in Swedish pharmacies (1995). Cited: 5 times. (4) RePEc:eee:proeco:v:40:y:1995:i:2-3:p:173-184 Travel time models in automated storage/retrieval systems: A critical review (1995). Cited: 4 times. (5) RePEc:eee:proeco:v:69:y:2001:i:3:p:277-285 The calculation of shadow prices for industrial wastes using distance functions: An analysis for Spanish ceramic pavements firms (2001). Cited: 3 times. (6) RePEc:eee:proeco:v:72:y:2001:i:1:p:73-87 An inventory model with dependent product demands and returns (2001). Cited: 3 times. (7) RePEc:eee:proeco:v:69:y:2001:i:1:p:1-14 A caveat on the measurement of productive efficiency (2001). Cited: 3 times. (8) RePEc:eee:proeco:v:39:y:1995:i:1-2:p:117-135 Incorporating quality into data envelopment analysis: a stochastic dominance approach (1995). Cited: 3 times. (9) RePEc:eee:proeco:v:76:y:2002:i:1:p:87-98 Managing for variety in the order acquisition and fulfilment process: The contribution of product configuration systems (2002). Cited: 3 times. (10) repec:eee:proeco:v:79:y:2002:i:3:p:261-278 (). Cited: 3 times. (11) RePEc:eee:proeco:v:62:y:1999:i:3:p:209-218 A dynamic efficiency model using data envelopment analysis (1999). Cited: 3 times. (12) RePEc:eee:proeco:v:96:y:2005:i:3:p:289-300 Higher supply chain security with lower cost: Lessons from total quality management (2005). Cited: 3 times. (13) RePEc:eee:proeco:v:54:y:1998:i:2:p:193-206 Investments in modern production technology and the cash flow-oriented EPQ-model (1998). Cited: 3 times. (14) RePEc:eee:proeco:v:29:y:1993:i:1:p:111-122 Horizon extension for rolling production schedules: Length and accuracy requirements (1993). Cited: 2 times. (15) RePEc:eee:proeco:v:45:y:1996:i:1-3:p:449-461 A capacity-constrained multi-level inventory and production control problem (1996). Cited: 2 times. (16) RePEc:eee:proeco:v:75:y:2002:i:1-2:p:33-45 The use of the Internet in Hong Kong: Manufacturing vs. service (2002). Cited: 2 times. (17) RePEc:eee:proeco:v:35:y:1994:i:1-3:p:15-22 Classical and variance bounds tests of the production smoothing hypothesis (1994). Cited: 2 times. (18) RePEc:eee:proeco:v:46-47:y:1996:i:1:p:65-87 Periodic production scheduling at a fastener manufacturer (1996). Cited: 2 times. (19) repec:eee:proeco:v:56-57:y:1998:i:1:p:61-68 (). Cited: 2 times. (20) RePEc:eee:proeco:v:39:y:1995:i:1-2:p:165-178 Measuring the macroeconomic performance of the Taiwanese economy (1995). Cited: 2 times. (21) RePEc:eee:proeco:v:52:y:1997:i:1-2:p:147-160 Strategic alliances, trick or treat? the case of Scania (1997). Cited: 2 times. (22) RePEc:eee:proeco:v:64:y:2000:i:1-3:p:187-195 An exact method for cost-oriented assembly line balancing (2000). Cited: 2 times. (23) RePEc:eee:proeco:v:56-57:y:1998:i:1:p:213-229 A net present value approach to safety stocks in planned production (1998). Cited: 2 times. (24) RePEc:eee:proeco:v:37:y:1994:i:1:p:27-40 Improving interface congruence between manufacturing and marketing in industrial-product manufacturers (1994). Cited: 2 times. (25) RePEc:eee:proeco:v:41:y:1995:i:1-3:p:257-266 Design and operational control of an AGV system (1995). Cited: 2 times. (26) RePEc:eee:proeco:v:59:y:1999:i:1-3:p:271-279 Inventory allocation and customer travelling problem in spatial duopoly (1999). Cited: 2 times. (27) RePEc:eee:proeco:v:71:y:2001:i:1-3:p:381-390 Leadtime effects and policy improvement for stochastic inventory control with remanufacturing (2001). Cited: 2 times. (28) RePEc:eee:proeco:v:98:y:2005:i:2:p:172-178 Optimal design of rack structure with modular cell in AS/RS (2005). Cited: 2 times. (29) RePEc:eee:proeco:v:45:y:1996:i:1-3:p:489-498 Product remanufacturing and disposal: A numerical comparison of alternative control strategies (1996). Cited: 2 times. (30) RePEc:eee:proeco:v:54:y:1998:i:2:p:173-192 Effects of discounting and demand rate variability on the EOQ (1998). Cited: 2 times. (31) RePEc:eee:proeco:v:66:y:2000:i:2:p:185-195 Optimising product recycling chains by control theory (2000). Cited: 2 times. (32) RePEc:eee:proeco:v:85:y:2003:i:1:p:97-111 MIP-based heuristics for capacitated lotsizing problems (2003). Cited: 2 times. (33) RePEc:eee:proeco:v:58:y:1999:i:2:p:147-158 The performance of two popular service measures on management effectiveness in inventory control (1999). Cited: 2 times. (34) RePEc:eee:proeco:v:70:y:2001:i:2:p:163-174 Forecasting practices of Canadian firms: Survey results and comparisons (2001). Cited: 2 times. (35) RePEc:eee:proeco:v:27:y:1992:i:2:p:175-181 Just-In-Time purchasing: Single or multiple sourcing? (1992). Cited: 2 times. (36) RePEc:eee:proeco:v:39:y:1995:i:1-2:p:37-54 A simulation study of hypothesis tests for differences in efficiencies (1995). Cited: 2 times. (37) repec:eee:proeco:v:54:y:1998:i:1:p:101-109 (). Cited: 2 times. (38) RePEc:eee:proeco:v:81-82:y:2003:i:1:p:51-58 Operations manager turnover and inventory fluctuations (2003). Cited: 2 times. (39) RePEc:eee:proeco:v:77:y:2002:i:3:p:231-245 Performance simulation of supply chain designs (2002). Cited: 2 times. (40) RePEc:eee:proeco:v:51:y:1997:i:1-2:p:109-113 Real-time operational control of an FMS with full routing flexibility (1997). Cited: 2 times. (41) RePEc:eee:proeco:v:72:y:2001:i:1:p:1-13 Mass customization: Literature review and research directions (2001). Cited: 2 times. (42) RePEc:eee:proeco:v:68:y:2000:i:1:p:1-14 Heuristic methods for cost-oriented assembly line balancing: A survey (2000). Cited: 2 times. (43) repec:eee:proeco:v:81-82:y:2003:i:1:p:225-241 (). Cited: 2 times. (44) repec:eee:proeco:v:39:y:1995:i:1-2:p:83-97 (). Cited: 2 times. (45) RePEc:eee:proeco:v:24:y:1991:i:1-2:p:147-156 Simulation analysis of a JIT production line (1991). Cited: 1 times. (46) RePEc:eee:proeco:v:36:y:1994:i:1:p:39-52 Barriers to successful implementation of ABC for continuous improvement: A case study (1994). Cited: 1 times. (47) RePEc:eee:proeco:v:41:y:1995:i:1-3:p:23-35 Performance measurement and performance management (1995). Cited: 1 times. (48) RePEc:eee:proeco:v:48:y:1997:i:1:p:73-86 The scheduling of economic lot sizes on volume flexible production systems (1997). Cited: 1 times. (49) RePEc:eee:proeco:v:59:y:1999:i:1-3:p:129-134 Inventory theory: New perspectives for corporate management (1999). Cited: 1 times. (50) RePEc:eee:proeco:v:63:y:2000:i:1:p:59-67 The efficiency of conventional fuel power plants in South Korea: A comparison of parametric and non-parametric approaches (2000). Cited: 1 times. Latest citations received in: | 2004 | 2003 | 2002 | 2001 Latest citations received in: 2004 (1) RePEc:dgr:eureri:30001944 Genetic Algorithms in Supply Chain Scheduling of Ready-Mixed Concrete (2004). Erasmus Research Institute of Management (ERIM), RSM Erasmus University / Research Paper (2) RePEc:pra:mprapa:4328 Giga-Investments: Modelling the Valuation of Very Large Industrial Real Investments (2004). University Library of Munich, Germany / MPRA Paper (3) RePEc:wpa:wuwpem:0409002 Econometric Estimation of Parameters of Preservation of Perishable Goods in Cold Logistic Chains (2004). EconWPA / Econometrics Latest citations received in: 2003 (1) RePEc:dgr:eureri:3000317 Managing Product Returns: The Role of Forecasting (2003). Erasmus Research Institute of Management (ERIM), RSM Erasmus University / Research Paper (2) RePEc:una:unccee:wp1103 Monitoring, Operational Manager Efforts and Inventory Policy (2003). School of Economics and Business Administration, University of Navarra / Faculty Working Papers Latest citations received in: 2002 (1) RePEc:dgr:eureri:2002185 Periodic Review, Push Inventory Policies for Remanufacturing (2002). Erasmus Research Institute of Management (ERIM), RSM Erasmus University / Research Paper (2) RePEc:iae:iaewps:wp2002n20 Business Use of the Internet in Australia (2002). Melbourne Institute of Applied Economic and Social Research, The University of Melbourne / Melbourne Institute Working Paper Series (3) RePEc:iae:iaewps:wp2002n29 Cost Focussed Firms and Internet Usage (2002). Melbourne Institute of Applied Economic and Social Research, The University of Melbourne / Melbourne Institute Working Paper Series Latest citations received in: 2001 (1) RePEc:dgr:eureir:2001232 Modelling product returns in inventory control - exploring the validity of general assumptions (2001). Erasmus University Rotterdam, Econometric Institute / Econometric Institute Report (2) RePEc:ivs:iivswp:03-01 Consumers as Co-Developers
Learning and innovation outside the firm (2001). Department of Industrial Economics and Strategy, Copenhagen Business School / IVS/CBS Working Papers Warning!! This is still an experimental service. The results of this service should be interpreted with care, especially in research assessment exercises. The processing of documents is automatic. There still are errors and omissions in the identification of references. We are working to improve the software to increase the accuracy of the results. Source data used to compute the impact factor of RePEc series.
|