Mario Vanhoucke : Citation Profile


Are you Mario Vanhoucke?

Vlerick Business School

14

H index

22

i10 index

595

Citations

RESEARCH PRODUCTION:

61

Articles

56

Papers

6

Books

53

Chapters

RESEARCH ACTIVITY:

   22 years (2001 - 2023). See details.
   Cites by year: 27
   Journals where Mario Vanhoucke has often published
   Relations with other researchers
   Recent citing documents: 59.    Total self citations: 61 (9.3 %)

MORE DETAILS IN:
ABOUT THIS REPORT:

   Permalink: http://citec.repec.org/pva66
   Updated: 2024-12-03    RAS profile: 2023-03-12    
   Missing citations? Add them    Incorrect content? Let us know

Relations with other researchers


Works with:

Authors registered in RePEc who have co-authored more than one work in the last five years with Mario Vanhoucke.

Is cited by:

Geuens, Maggie (12)

Van den Poel, Dirk (10)

Musshoff, Oliver (5)

Verbeke, Tom (5)

Poels, Geert (5)

Everaert, Gerdie (5)

Dossche, Maarten (5)

Ooghe, Hubert (5)

Spaenjers, Christophe (5)

Lepoutre, Jan (5)

Albrecht, Johan (5)

Cites to:

Padman, Rema (29)

Schoors, Koen (21)

Poels, Geert (12)

Geuens, Maggie (10)

Clarysse, Bart (9)

Merlevede, Bruno (6)

Claeys, Sophie (6)

Van den Poel, Dirk (6)

Vermeir, Iris (4)

Flyvbjerg, Bent (4)

Van de gaer, Dirk (4)

Main data


Where Mario Vanhoucke has published?


Journals with more than one article published# docs
European Journal of Operational Research32
Omega7
International Journal of Production Research4
Annals of Operations Research4
Journal of the Operational Research Society3

Working Papers Series with more than one paper published# docs
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium / Ghent University, Faculty of Economics and Business Administration56

Recent works citing Mario Vanhoucke (2024 and 2023)


YearTitle of citing document
2023Dynamic assignment of a multi-skilled workforce in job shops: An approximate dynamic programming approach. (2023). Schmid, Verena ; Akhavan-Tabatabaei, Raha ; Annear, Luis Mauricio. In: European Journal of Operational Research. RePEc:eee:ejores:v:306:y:2023:i:3:p:1109-1125.

Full description at Econpapers || Download paper

2023Tabu search exploiting local optimality in binary optimization. (2023). Hennig, Rick ; Yang, Wei ; Glover, Fred ; Wang, Yang ; Hanafi, Said. In: European Journal of Operational Research. RePEc:eee:ejores:v:308:y:2023:i:3:p:1037-1055.

Full description at Econpapers || Download paper

2023Project scheduling under the threat of catastrophic disruption. (2023). Simonson, Peter D ; Venkateshan, Prahalad ; Szmerekovsky, Joseph G. In: European Journal of Operational Research. RePEc:eee:ejores:v:309:y:2023:i:2:p:784-794.

Full description at Econpapers || Download paper

2023Resource-constrained multi-project scheduling problem: A survey. (2023). Voss, Stefan ; Castro, Carlos ; Gil, Alejandro Fernandez ; Lalla-Ruiz, Eduardo ; Sanchez, Mariam Gomez. In: European Journal of Operational Research. RePEc:eee:ejores:v:309:y:2023:i:3:p:958-976.

Full description at Econpapers || Download paper

2023Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty. (2023). Jia, Tao ; He, Yukang ; Zheng, Weibo. In: European Journal of Operational Research. RePEc:eee:ejores:v:310:y:2023:i:1:p:34-52.

Full description at Econpapers || Download paper

2023A shift-based model to solve the integrated staff rostering and task assignment problem with real-world requirements. (2023). Xie, Kexin ; Wang, Wenshu ; Liang, Zhe ; Xiao, Fan ; Guo, Siqi. In: European Journal of Operational Research. RePEc:eee:ejores:v:310:y:2023:i:1:p:360-378.

Full description at Econpapers || Download paper

2024Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources. (2024). van Essen, J T ; Souravlias, D ; van der Beek, T ; Aardal, K ; Pruyn, J. In: European Journal of Operational Research. RePEc:eee:ejores:v:313:y:2024:i:1:p:92-111.

Full description at Econpapers || Download paper

2024A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem. (2024). Vanhoucke, Mario ; Bredael, Dries. In: European Journal of Operational Research. RePEc:eee:ejores:v:315:y:2024:i:1:p:19-34.

Full description at Econpapers || Download paper

2024A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks. (2024). Vanhoucke, Mario ; Unsal-Altuncan, Izel. In: European Journal of Operational Research. RePEc:eee:ejores:v:315:y:2024:i:2:p:511-527.

Full description at Econpapers || Download paper

2024Analysis of the impact of corrective actions for stochastic project networks. (2024). Vanhoucke, Mario ; Martens, Annelies ; Vaseghi, Forough. In: European Journal of Operational Research. RePEc:eee:ejores:v:316:y:2024:i:2:p:503-518.

Full description at Econpapers || Download paper

2024A genetic algorithm for the Resource-Constrained Project Scheduling Problem with Alternative Subgraphs using a boolean satisfiability solver. (2024). Vanhoucke, Mario ; Coelho, Jose ; Servranckx, Tom. In: European Journal of Operational Research. RePEc:eee:ejores:v:316:y:2024:i:3:p:815-827.

Full description at Econpapers || Download paper

2023An ex-ante method to verify commercial U.S. nuclear power plant decommissioning cost estimates. (2023). Barenbold, Rebekka ; Lordan-Perret, Rebecca ; Rosner, Robert ; Weigt, Hannes. In: Energy Economics. RePEc:eee:eneeco:v:127:y:2023:i:pb:s0140988323005212.

Full description at Econpapers || Download paper

2023An authority-enterprise equilibrium differentiated subsidy mechanism for promoting coalbed methane extraction in multiple coal seams. (2023). Song, Xiaoling ; Wang, Binyu ; Fan, Lurong. In: Energy. RePEc:eee:energy:v:263:y:2023:i:pa:s0360544222024276.

Full description at Econpapers || Download paper

2023Multi-stakeholder equilibrium-based subsidy allocation mechanism for promoting coalbed methane scale extraction-utilization. (2023). Zhang, Wen ; Ma, Ning ; Fan, Lurong. In: Energy. RePEc:eee:energy:v:277:y:2023:i:c:s036054422300974x.

Full description at Econpapers || Download paper

2023Strategic workforce planning in health and social care – an international perspective: A scoping review. (2023). Prowse, Julie ; Randell, Rebecca ; Sutton, Claire ; Faisal, Muhammad ; Eyers, Emma ; O'Connell, Kate ; Tissiman, Chris ; Alvarado, Natasha ; Montague, Jane ; Neagu, Daniel ; Elshehaly, Mai ; McVey, Lynn. In: Health Policy. RePEc:eee:hepoli:v:132:y:2023:i:c:s0168851023001124.

Full description at Econpapers || Download paper

2023Deciding on scheduling, secrecy, and patenting during the new product development process: The relevance of project planning models. (2023). van Looy, Bart ; Leus, Roel ; Hermans, Ben. In: Omega. RePEc:eee:jomega:v:116:y:2023:i:c:s0305048322002201.

Full description at Econpapers || Download paper

2024A study on policy decisions to embed flexibility for reactive recovery in the planning and scheduling process in operating rooms. (2024). Maenhout, Broos ; Akbarzadeh, Babak. In: Omega. RePEc:eee:jomega:v:126:y:2024:i:c:s0305048324000288.

Full description at Econpapers || Download paper

2023Uncertainty in the Planning Phase of Public Projects—Its Scope, Consequences, and Possible Remedies. (2023). Capaldo, Guido ; Capone, Vincenza ; Canonico, Paolo ; Kuchta, Dorota. In: Administrative Sciences. RePEc:gam:jadmsc:v:13:y:2023:i:6:p:145-:d:1161848.

Full description at Econpapers || Download paper

2023The Linkage between Renewable Energy and Project Management: What Do We Already Know, and What Are the Future Directions of Research?. (2023). Pukaa, Ryszard ; Jarosz, Szymon ; Sotysik, Mariusz ; Piwowar-Sulej, Katarzyna. In: Energies. RePEc:gam:jeners:v:16:y:2023:i:12:p:4609-:d:1167551.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

2023Optimization of Ecological and Economic Aspects of the Construction Schedule with the Use of Metaheuristic Algorithms and Artificial Intelligence. (2023). Roson, Jerzy ; Kulejewski, Janusz. In: Sustainability. RePEc:gam:jsusta:v:15:y:2023:i:1:p:890-:d:1024291.

Full description at Econpapers || Download paper

2023Forming Student Teams to Incorporate Soft Skills and Commonality of Schedule. (2023). Murphy, Spencer ; Letizia, Paolo ; Bryan, Nana ; Bowers, Melissa R. In: Interfaces. RePEc:inm:orinte:v:53:y:2023:i:2:p:111-127.

Full description at Econpapers || Download paper

2023Case Article—Pediatrician Scheduling at British Columbia Women’s Hospital. (2023). Shechter, Steven. In: INFORMS Transactions on Education. RePEc:inm:orited:v:24:y:2023:i:1:p:35-39.

Full description at Econpapers || Download paper

2023Resource leveling in projects with flexible structures. (2023). Zhu, Hanyu ; Zheng, Linwen ; Li, Hongbo. In: Annals of Operations Research. RePEc:spr:annopr:v:321:y:2023:i:1:d:10.1007_s10479-022-04797-y.

Full description at Econpapers || Download paper

2023Development of a new personalized staff-scheduling method with a work-life balance perspective: case of a hospital. (2023). Gulmez, Esra ; Emek, Murat Serdar ; Koruca, Halil Brahim. In: Annals of Operations Research. RePEc:spr:annopr:v:328:y:2023:i:1:d:10.1007_s10479-023-05244-2.

Full description at Econpapers || Download paper

2023Dangers in using earned duration and other earned value metrics to measure a project’s schedule performance. (2023). Gordon, Mike M ; Lowe, Timothy J ; Wendell, Richard E. In: Central European Journal of Operations Research. RePEc:spr:cejnor:v:31:y:2023:i:2:d:10.1007_s10100-022-00830-4.

Full description at Econpapers || Download paper

2023Effects of Prioritized Input on Human Resource Control in Departmentalized Markov Manpower Framework. (2023). Ugah, T E ; Nduka, U C ; Udom, A U ; Madukaife, M S ; Ossai, E O. In: Methodology and Computing in Applied Probability. RePEc:spr:metcap:v:25:y:2023:i:1:d:10.1007_s11009-023-10011-8.

Full description at Econpapers || Download paper

2023A two-phase resource-constrained project scheduling approach for design and development of complex product systems. (2023). Nouri, Mojtaba ; Ghodsypour, Seyyed Hassan ; Shahabadi, Sheida ; Gheidar-Kheljani, Jafar ; Peykani, Pejman. In: Operational Research. RePEc:spr:operea:v:23:y:2023:i:1:d:10.1007_s12351-023-00750-4.

Full description at Econpapers || Download paper

2023Multi-project scheduling problem under shared multi-skill resource constraints. (2023). Nanne, Mohamedade Farouk ; Babou, Hafed Mohamed ; Soukhal, Ameur ; Neron, Emmanuel ; Dhib, Cheikh ; Haroune, Meya. In: TOP: An Official Journal of the Spanish Society of Statistics and Operations Research. RePEc:spr:topjnl:v:31:y:2023:i:1:d:10.1007_s11750-022-00633-5.

Full description at Econpapers || Download paper

Works by Mario Vanhoucke:


YearTitleTypeCited
2003Progress payments in project scheduling problems In: European Journal of Operational Research.
[Full Text][Citation analysis]
article6
2005New computational results for the discrete time/cost trade-off problem with time-switch constraints In: European Journal of Operational Research.
[Full Text][Citation analysis]
article7
2003NEW COMPUTATIONAL RESULTS FOR THE DISCRETE TIME/COST TRADE-OFF PROBLEM WITH TIME-SWITCH CONSTRAINTS.(2003) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 7
paper
2006A hybrid scatter search/electromagnetism meta-heuristic for project scheduling In: European Journal of Operational Research.
[Full Text][Citation analysis]
article20
2004A Hybrid Scatter Search / Electromagnetism Meta-Heuristic for Project Scheduling.(2004) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 20
paper
2008An evaluation of the adequacy of project network generators with systematically sampled networks In: European Journal of Operational Research.
[Full Text][Citation analysis]
article14
2009On the characterization and generation of nurse scheduling problem instances In: European Journal of Operational Research.
[Full Text][Citation analysis]
article9
2010A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem In: European Journal of Operational Research.
[Full Text][Citation analysis]
article33
2010A hybrid scatter search heuristic for personalized crew rostering in the airline industry In: European Journal of Operational Research.
[Full Text][Citation analysis]
article22
2007A Hybrid Scatter Search Heuristic for Personalized Crew Rostering in the Airline Industry.(2007) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 22
paper
2011Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers In: European Journal of Operational Research.
[Full Text][Citation analysis]
article18
2009Multi-mode resource constrained pro ject scheduling using RCPSP and SAT solvers.(2009) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 18
paper
2011A hybrid single and dual population search procedure for the job shop scheduling problem In: European Journal of Operational Research.
[Full Text][Citation analysis]
article5
2010A hybrid single and dual population search procedure for the job shop scheduling problem.(2010) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 5
paper
2014An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances In: European Journal of Operational Research.
[Full Text][Citation analysis]
article25
2011An Experimental Investigation of Metaheuristics for the Multi-Mode Resource-Constrained Project Scheduling Problem on New Dataset Instances.(2011) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 25
paper
2016An approach using SAT solvers for the RCPSP with logical constraints In: European Journal of Operational Research.
[Full Text][Citation analysis]
article6
2017Capital- and resource-constrained project scheduling with net present value optimization In: European Journal of Operational Research.
[Full Text][Citation analysis]
article10
2017A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence In: European Journal of Operational Research.
[Full Text][Citation analysis]
article4
2017A parallel multi-objective scatter search for optimising incentive contract design in projects In: European Journal of Operational Research.
[Full Text][Citation analysis]
article5
2017A buffer control method for top-down project control In: European Journal of Operational Research.
[Full Text][Citation analysis]
article0
2018A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem In: European Journal of Operational Research.
[Full Text][Citation analysis]
article4
2018Maximising the weighted number of activity execution modes in project planning In: European Journal of Operational Research.
[Full Text][Citation analysis]
article1
2019A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs In: European Journal of Operational Research.
[Full Text][Citation analysis]
article12
2019The impact of applying effort to reduce activity variability on the project time and cost performance In: European Journal of Operational Research.
[Full Text][Citation analysis]
article2
2019Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules In: European Journal of Operational Research.
[Full Text][Citation analysis]
article5
2020Project schedule performance under general mode implementation disruptions In: European Journal of Operational Research.
[Full Text][Citation analysis]
article0
2020A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems In: European Journal of Operational Research.
[Full Text][Citation analysis]
article1
2020The impact of a limited budget on the corrective action taking process In: European Journal of Operational Research.
[Full Text][Citation analysis]
article1
2021Using Schedule Risk Analysis with resource constraints for project control In: European Journal of Operational Research.
[Full Text][Citation analysis]
article2
2021A new algorithm for resource-constrained project scheduling with breadth and depth of skills In: European Journal of Operational Research.
[Full Text][Citation analysis]
article2
2021Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity In: European Journal of Operational Research.
[Full Text][Citation analysis]
article4
2022The bilevel optimisation of a multi-agent project scheduling and staffing problem In: European Journal of Operational Research.
[Full Text][Citation analysis]
article0
2022Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control In: European Journal of Operational Research.
[Full Text][Citation analysis]
article1
2022New summary measures and datasets for the multi-project scheduling problem In: European Journal of Operational Research.
[Full Text][Citation analysis]
article2
2023A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem In: European Journal of Operational Research.
[Full Text][Citation analysis]
article0
2023A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem In: European Journal of Operational Research.
[Full Text][Citation analysis]
article2
2023Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates In: European Journal of Operational Research.
[Full Text][Citation analysis]
article1
2010Using activity sensitivity and network topology information to monitor project time performance In: Omega.
[Full Text][Citation analysis]
article13
2011On the dynamic use of project performance and schedule risk information during projecttracking In: Omega.
[Full Text][Citation analysis]
article17
2013An integrated nurse staffing and scheduling analysis for longer-term nursing staff allocation problems In: Omega.
[Full Text][Citation analysis]
article29
2013Reconstructing nurse schedules: Computational insights in the problem size parameters In: Omega.
[Full Text][Citation analysis]
article5
2014Setting tolerance limits for statistical project control using earned value management In: Omega.
[Full Text][Citation analysis]
article6
2016On the use of multivariate regression methods for longest path calculations from earned value management observations In: Omega.
[Full Text][Citation analysis]
article1
2017Optimised scheduling for weather sensitive offshore construction projects In: Omega.
[Full Text][Citation analysis]
article10
2007Work Continuity Optimization for the Westerscheldetunnel Project in the Netherlands In: Review of Business and Economic Literature.
[Full Text][Citation analysis]
article0
2010Introducing Optimization Techniques to Students: An Exam Case Distribution Model In: INFORMS Transactions on Education.
[Full Text][Citation analysis]
article4
2001On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints In: Management Science.
[Full Text][Citation analysis]
article24
2008Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors In: Management Science.
[Full Text][Citation analysis]
article10
2007A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem In: Operations Research.
[Full Text][Citation analysis]
article21
2013Analyzing the nursing organizational structure and process from a scheduling perspective In: Health Care Management Science.
[Full Text][Citation analysis]
article3
2009Analyzing the Nursing Organizational Structure and Process from a Scheduling Perspective.(2009) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 3
paper
2002Discrete time/cost trade-offs in project scheduling with time-switch constraints In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article3
2007A simulation and evaluation of earned value metrics to forecast the project duration In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article29
2005A simulation and evaluation of earned value metrics to forecast the project duration.(2005) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 29
paper
2009The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article4
2008The Impact of Incorporating Nurse-Specific Characteristics in a Cyclical Scheduling Approach.(2008) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 4
paper
2002OPTIMAL DUE DATE ASSIGNMENT IN PROJECT SCHEDULING In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper3
2004AN ELECTROMAGNETISM META-HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2004WORK CONTINUITY CONSTRAINTS IN PROJECT SCHEDULING In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper3
2004WORK CONTINUITY IN A REAL-LIFE SCHEDULE: THE WESTERSCHELDE TUNNEL In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2004ON THE MORPHOLOGICAL STRUCTURE OF A NETWORK In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2005A DECOMPOSITION-BASED HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper14
2005A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper1
2005A Comparison of Different Project Duration Forecasting Methods using Earned Value Metrics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper22
2005THE DISCRETE TIME/COST TRADE-OFF PROBLEM UNDER VARIOUS ASSUMPTIONS EXACT AND HEURISTIC PROCEDURES In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper20
2005An Electromagnetic Meta-Heuristic for the Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper25
2005A simulation analysis of interactions between errors in costing system design In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper24
2005Characterisation and Generation of Nurse Scheduling Problem Instances In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2005New Computational Results for the Nurse Scheduling Problem: A Scatter Search Algorithm In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper3
2006An efficient hybrid search algorithm for various optimization problems In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper1
2006A Comparison and Hybridization of Crossover Operators for the Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper7
2008Comparison and hybridization of crossover operators for the nurse scheduling problem.(2008) In: Annals of Operations Research.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 7
article
2006The impact of various activity assumptions on the lead-time and resource utilization of resource-constrained projects In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper6
2006Meta-heuristic resource-constrained project scheduling:solution space restrictions and neighbourhood extensions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2006Pre-emptive resource-constrained project scheduling with setup times In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2006A scatter search procedure for maximizing the net present value of a project under renewable resource constraints In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2006A finite capacity production scheduling procedure for a Belgian steel company In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2007A genetic algorithm to investigate the trade-off between project lead time and net present value In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2007An electromagnetic time/cost trade-off optimization in project scheduling In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper1
2008A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper2
2008Branching Strategies in a Branch-and-Price Approach for a Multiple Objective Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper6
2008Integrating the Nurse Staffing Decision and the Shift Scheduling Decision: Case Study and Policy Analysis In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2008The effect of project schedule adherence and rework on the duration forecast accuracy of earned value metrics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2008Automatic Personalized Crew Rostering at Brussels Airlines In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2008Improved project time performance using activity sensitivity and network topology information In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2009An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper2
2009A Genetic Algorithm for the Nurse Rerostering Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2009Reconstructing Nurse Schedules: Managerial Insights and Policy Decisions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2009Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper2
2009Introducing optimisation techniques to students: an exam case distribution model In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2009A Genetic Algorithm for the Single Machine Maximum Lateness Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2010Introducing Learning Effects in Resource-constrained Project Scheduling In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2010Comparing the accuracy of ABC and time-driven ABC in complex and dynamic environments: a simulation analysis In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2010A hybrid job shop procedure for a Belgian manufacturing company producing industrial wheels and castors in rubber In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper1
2010A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011An Invasive Weed Optimization Algorithm for the Resource Availability Cost Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011A hybrid electromagnetism-like/tabu search procedure for the single machine scheduling problem with a maximum lateness objective In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011On the design of custom packs: Grouping of medical disposable items for surgical procedures In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011Truncated branch-and-bound guided meta-heuristics for the unrelated parallel machine scheduling problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011An Artificial Immune System based approach for solving the Nurse Re-rostering Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011Days on and days off scheduling of pilots under a variable workload In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011Solution representation, diversity and space reduction: A computational experiment with meta-heuristics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper0
2011An Artificial Immune System Algorithm for the Resource Availability Cost Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium.
[Full Text][Citation analysis]
paper1
2001An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem In: Annals of Operations Research.
[Full Text][Citation analysis]
article7
2017A resource type analysis of the integrated project scheduling and personnel staffing problem In: Annals of Operations Research.
[Full Text][Citation analysis]
article1
2020Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs In: Annals of Operations Research.
[Full Text][Citation analysis]
article0
2015Heuristic Methods for the Resource Availability Cost Problem In: International Handbooks on Information Systems.
[Citation analysis]
chapter2
2015The Multi-Mode Resource-Constrained Project Scheduling Problem In: International Handbooks on Information Systems.
[Citation analysis]
chapter1
2015Generalized Discrete Time-Cost Tradeoff Problems In: International Handbooks on Information Systems.
[Citation analysis]
chapter0
2009The EVM Fundamentals In: International Series in Operations Research & Management Science.
[Citation analysis]
chapter0
2009Beyond the EVM Fundamentals In: International Series in Operations Research & Management Science.
[Citation analysis]
chapter0
2009A Case Study In: International Series in Operations Research & Management Science.
[Citation analysis]
chapter0
2009A Simulation Study In: International Series in Operations Research & Management Science.
[Citation analysis]
chapter0
2009Time Sensitivity In: International Series in Operations Research & Management Science.
[Citation analysis]
chapter0
2009Top-down or Bottom-up Project Tracking In: International Series in Operations Research & Management Science.
[Citation analysis]
chapter0
2009ProTrack: A Software Tutorial In: International Series in Operations Research & Management Science.
[Citation analysis]
chapter0
2009Conclusions In: International Series in Operations Research & Management Science.
[Citation analysis]
chapter0
2014Conclusions.(2014) In: Management for Professionals.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012Conclusions.(2012) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2013Conclusions.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2009Measuring Time In: International Series in Operations Research and Management Science.
[Citation analysis]
book0
2022Multimode time-cost-robustness trade-off project scheduling problem under uncertainty In: Journal of Combinatorial Optimization.
[Full Text][Citation analysis]
article0
2020Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling In: Journal of Scheduling.
[Full Text][Citation analysis]
article6
2014Project Data In: Management for Professionals.
[Citation analysis]
chapter0
2014Earned Value Management In: Management for Professionals.
[Citation analysis]
chapter5
2012Earned Value Management.(2012) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 5
chapter
2013Earned Value Management.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 5
chapter
2014Earned Schedule In: Management for Professionals.
[Citation analysis]
chapter0
2014Schedule Adherence In: Management for Professionals.
[Citation analysis]
chapter0
2014Forecasting In: Management for Professionals.
[Citation analysis]
chapter0
2014Schedule Risk In: Management for Professionals.
[Citation analysis]
chapter0
2014Schedule Control In: Management for Professionals.
[Citation analysis]
chapter0
2014ProTrack In: Management for Professionals.
[Citation analysis]
chapter0
2014P2 Engine In: Management for Professionals.
[Citation analysis]
chapter0
2014Integrated Project Management and Control In: Management for Professionals.
[Citation analysis]
book3
2017A metaheuristic solution approach for the time-constrained project scheduling problem In: OR Spectrum: Quantitative Approaches in Management.
[Full Text][Citation analysis]
article3
2018The Data-Driven Project Manager In: Springer Books.
[Citation analysis]
book1
2016Integrated Project Management Sourcebook In: Springer Books.
[Citation analysis]
book1
2012Project Management with Dynamic Scheduling In: Springer Books.
[Citation analysis]
book11
2013Project Management with Dynamic Scheduling.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 11
book
2012Introduction In: Springer Books.
[Citation analysis]
chapter0
2012Critical Chain/Buffer Management In: Springer Books.
[Citation analysis]
chapter0
2013Critical Chain/Buffer Management.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012The Mutum-Paraná II Bridge Project (B) In: Springer Books.
[Citation analysis]
chapter0
2012The Mutum-Paraná II Bridge Project (C).(2012) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012The Mutum-Paraná II Bridge Project (A).(2012) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2013The Mutum-Paraná II Bridge Project (B).(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2013The Mutum-Paraná II Bridge Project (C).(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2013The Mutum-Paraná II Bridge Project (A).(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012Advanced Topics In: Springer Books.
[Citation analysis]
chapter0
2013Advanced Topics.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012Dynamic Scheduling with ProTrack In: Springer Books.
[Citation analysis]
chapter0
2013Dynamic Scheduling with ProTrack.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012The PERT/CPM Technique In: Springer Books.
[Citation analysis]
chapter0
2013The PERT/CPM Technique.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012The Critical Path Method In: Springer Books.
[Citation analysis]
chapter0
2013The Critical Path Method.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012The VMW Project In: Springer Books.
[Citation analysis]
chapter0
2013The VMW Project.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012Schedule Risk Analysis In: Springer Books.
[Citation analysis]
chapter0
2013Schedule Risk Analysis.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012Resource-Constrained Project Scheduling In: Springer Books.
[Citation analysis]
chapter0
2013Resource-Constrained Project Scheduling.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012Resource-Constrained Scheduling Extensions In: Springer Books.
[Citation analysis]
chapter0
2013Resource-Constrained Scheduling Extensions.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2012The Westerschelde Tunnel Project In: Springer Books.
[Citation analysis]
chapter0
2013The Westerschelde Tunnel Project.(2013) In: Springer Books.
[Citation analysis]
This paper has nother version. Agregated cites: 0
chapter
2013Introduction In: Springer Books.
[Citation analysis]
chapter0
2015Decomposition-based heuristics for the integrated physician rostering and surgery scheduling problem In: Health Systems.
[Full Text][Citation analysis]
article0
2015Operating theatre modelling: integrating social measures In: Journal of Simulation.
[Full Text][Citation analysis]
article0
2015On the design of custom packs: grouping of medical disposable items for surgeries In: International Journal of Production Research.
[Full Text][Citation analysis]
article2
2015A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows In: International Journal of Production Research.
[Full Text][Citation analysis]
article4
2016A scatter search for the extended resource renting problem In: International Journal of Production Research.
[Full Text][Citation analysis]
article1
2022Various extensions in resource-constrained project scheduling with alternative subgraphs In: International Journal of Production Research.
[Full Text][Citation analysis]
article0

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated November, 3 2024. Contact: CitEc Team