1999 | Balancing and sequencing of assembly lines RePEc:dar:wpaper:10881 [Citation Analysis] | 19 |
2000 | Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem RePEc:dar:wpaper:11180 [Citation Analysis] | 16 |
2001 | An integrated survey of deterministic project scheduling RePEc:dar:wpaper:8114 [Citation Analysis] | 16 |
1999 | Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis RePEc:dar:wpaper:10966 [Citation Analysis] | 13 |
2003 | The Capacitated lot-sizing problem with linked lot sizes RePEc:dar:wpaper:20206 [Citation Analysis] | 9 |
1997 | SALOME. a bidirectional branch and bound procedure for assembly line balancing RePEc:dar:wpaper:7890 [Citation Analysis] | 9 |
1999 | Contrarian and Momentum Strategies in Germany RePEc:dar:wpaper:35306 [Citation Analysis] | 8 |
2001 | Knowing Me, Knowing You: Trader Anonymity and Informed Trading in Parallel Markets RePEc:dar:wpaper:35288 [Citation Analysis] | 8 |
2006 | Systematik und Abgrenzung von PPP-Modellen und Begriffen RePEc:dar:wpaper:35578 [Citation Analysis] | 7 |
2003 | Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows RePEc:dar:wpaper:20204 [Citation Analysis] | 6 |
1997 | The General Lotsizing and Scheduling Problem RePEc:dar:wpaper:36068 [Citation Analysis] | 6 |
2000 | Simultaneous Lotsizing and Scheduling by combining Local Search with Dual Reoptimization. RePEc:dar:wpaper:39380 [Citation Analysis] | 6 |
2005 | Exploring the Conditions Under Which Salesperson Work Satisfaction Can Lead to Customer Satisfaction RePEc:dar:wpaper:35543 [Citation Analysis] | 6 |
2004 | Supply chain planning in the German automotive industry RePEc:dar:wpaper:36062 [Citation Analysis] | 6 |
2005 | Long-run IPO Performance Analysis of German and Spanish Family-Owned Business RePEc:dar:wpaper:35079 [Citation Analysis] | 6 |
2000 | Scheduling of resource constrained projects RePEc:dar:wpaper:1592 [Citation Analysis] | 5 |
2007 | Private Equity in Deutschland RePEc:dar:wpaper:34979 [Citation Analysis] | 5 |
1995 | Zyklische und antizyklische Handelsstrategien am deutschen Aktienmarkt RePEc:dar:wpaper:35478 [Citation Analysis] | 4 |
1998 | Pattern based vocabulary building for effectively sequencing mixed model assembly lines RePEc:dar:wpaper:9365 [Citation Analysis] | 4 |
2006 | Risiken immobilienwirtschaftlicher PPPs aus Sicht der beteiligten Akteure. Ein Beitrag des Arbeitskreises PPP im Management öffentlicher Immobilien im Bundesverband Public Private Partnership e.V. (B RePEc:dar:wpaper:34936 [Citation Analysis] | 4 |
2009 | Empirische Untersuchung der Nutzenwirkungen von PPP Projekten auf den Schulbetrieb am Beispiel der Schulen im Kreis Offenbach RePEc:dar:wpaper:35572 [Citation Analysis] | 4 |
2004 | Drivers of Team Performance: What Do We Know and What Have We Still to Learn? RePEc:dar:wpaper:35551 [Citation Analysis] | 3 |
2000 | Ãbungen und Fallbeispiele zum Operations Research RePEc:dar:wpaper:5962 [Citation Analysis] | 3 |
2000 | Integration of assembly and fabrication for make-to-order production RePEc:dar:wpaper:335 [Citation Analysis] | 3 |
2002 | Simultaneous Lotsizing and Scheduling on Parallel Machines RePEc:dar:wpaper:36065 [Citation Analysis] | 3 |
2000 | Improved rolling schedules for the dynamic single level lot sizing problem RePEc:dar:wpaper:14079 [Citation Analysis] | 3 |
1998 | PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem RePEc:dar:wpaper:14077 [Citation Analysis] | 3 |
1997 | BISON: a fast hybrid procedure for exactly solving the one-dimensional bin packing problem RePEc:dar:wpaper:644 [Citation Analysis] | 3 |
2007 | Reliability of Public Private Partnership Projects under Assumptions of Cash Flow Volatility RePEc:dar:wpaper:34940 [Citation Analysis] | 3 |
1997 | Produktionsplanung: ablauforganisatorische Aspekte. 2. Aufl RePEc:dar:wpaper:619 [Citation Analysis] | 3 |
1997 | Location and layout planning: a survey RePEc:dar:wpaper:8164 [Citation Analysis] | 2 |
1997 | Empirische Ergebnisse zum Einsatz der betrieblichen Standardsoftware SAP R/3 RePEc:dar:wpaper:36522 [Citation Analysis] | 2 |
| repec:dar:wpaper:7468 [Citation Analysis] | 2 |
2009 | Auditor Independence and the Provision of Non-Audit Services: Perceptions by German Investors RePEc:dar:wpaper:39453 [Citation Analysis] | 2 |
2000 | Robuste Planung und Optimierung: Grundlagen, Konzepte und Methoden; experimentelle Untersuchungen RePEc:dar:wpaper:9373 [Citation Analysis] | 2 |
1997 | Internationalisierung von Forschung und Entwicklung in multinationalen Unternehmen RePEc:dar:wpaper:1146 [Citation Analysis] | 2 |
| repec:dar:wpaper:35295 [Citation Analysis] | 2 |
2006 | Target Costing für die Projektentwicklung von Immobilien als Instrument im Building Performance Evaluation Framework RePEc:dar:wpaper:35577 [Citation Analysis] | 2 |
1994 | Simple assembly line balancing : heuristic approaches RePEc:dar:wpaper:49132 [Citation Analysis] | 2 |
2003 | Planning Hierarchy, Modeling and Advanced Planning Systems RePEc:dar:wpaper:36714 [Citation Analysis] | 2 |
2005 | Industrialisierung der Kreditwirtschaft RePEc:dar:wpaper:24922 [Citation Analysis] | 2 |
1997 | Reformulations of the shortest route model for dynamic multi-item multi-level capacitated lotsizing RePEc:dar:wpaper:7096 [Citation Analysis] | 2 |
2000 | Supply chain management and advanced planning: concepts, models, software and case studies RePEc:dar:wpaper:4691 [Citation Analysis] | 2 |
1981 | Planung und Kontrolle RePEc:dar:wpaper:41745 [Citation Analysis] | 2 |
2007 | [Rez.] Does Auditor Industry Specialization Matter? Evidence from Market Reaction to Auditor Switches. By: Knechel, W. Robert; Naiker, Vic; Pacheco, Gail. Auditing, May2007, Vol. 26 Issue 1, p19-45, 2 RePEc:dar:wpaper:30560 [Citation Analysis] | 2 |
2010 | CREM 2010: Welche Rolle spielt der Nutzer? RePEc:dar:wpaper:43289 [Citation Analysis] | 2 |
2007 | DRM: Digital Rights- oder Digital Restriction-Management? RePEc:dar:wpaper:35790 [Citation Analysis] | 2 |
1998 | Scattered branch and bound: an adaptive search strategy applied to resource-constrained project scheduling RePEc:dar:wpaper:14076 [Citation Analysis] | 2 |
2008 | Cost-Oriented Failure Mode and Effects Analysis RePEc:dar:wpaper:37787 [Citation Analysis] | 1 |
2007 | Die Industrialisierung von Banken am Beispiel des Outsourcings RePEc:dar:wpaper:29830 [Citation Analysis] | 1 |