Last updated February, 3 2014 581.217 documents processed, 14.657.417 references and 5.549.674 citations

Engineering Costs and Production Economics / Elsevier


[Raw data] [Main indicators] [Most cited papers] [cites used to compute the impact factor] [Recent citations ][documents published in EconPapers] [Keep updated about new citations] [Missing citations? Add them now] [Incorrect content? Let us know]

Main indicators


Raw data:


IF AIF DOC CDO CCU CIF CIT D2Y C2Y %SC CiY II AII
19900.0810110106721500.04
19910.082712801626000.04
19920.0812810.01012800.04
19930.09128002700.05
19940.112800000.04
19950.19128410.320000.07
19960.23128210.160000.09
19970.29128170.130000.1
19980.29128160.130000.11
19990.33128110.090000.14
20000.42128180.140000.16
20010.44128180.140000.17
20020.44128150.120000.19
20030.4612890.070000.2
20040.53128110.090000.22
20050.56128240.190000.23
20060.53128210.160000.22
20070.46128110.090000.19
20080.49128140.110000.21
20090.5128230.180000.2
20100.46128100.080000.16
20110.5712890.070000.22
20120.66128120.090000.26
 
 
IF: Impact Factor: C2Y / D2Y
AIF: Average Impact Factor for series in RePEc in year y
DOC: Number of documents published in year y
CDO: Cumulative number of documents published until year y
CCU: Cumulative number of citations to papers published until year y
CIF: Cumulative impact factor
CIT: Number of citations to papers published in year y
D2Y: Number of articles published in y-1 plus y-2
C2Y: Cites in y to articles published in y-1 plus y-2
%SC: Percentage of selft citations in y to articles published in y-1 plus y-2
CiY: Cites in year y to documents published in year y
II: Immediacy Index: CiY / Documents.
AII: Average Immediacy Index for series in RePEc in year y

 

Most cited documents in this series:


YearTitleCited
1987Measuring the efficiency of service operations: An application to bank branches. (1987). Parkan, Celik ; Fiserman, Steve. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:237-242.

Full description at Econpapers || Download paper

34
1986A constant lot size model with equal and unequal sized batch shipments between production stages. (1986). Szendrovits, A. Z. ; Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:203-210.

Full description at Econpapers || Download paper

10
1989Queueing models of Kanban and MRP controlled production systems. (1989). Buzacott, J. A.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:3-20.

Full description at Econpapers || Download paper

10
1990An EOQ model for items with stock dependent consumption rate and exponential decay. (1990). Padmanabhan, G. ; Vrat, Prem . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1990:i:3:p:241-246.

Full description at Econpapers || Download paper

9
1991Investing in reducing lead-time randomness in continuous-review inventory models. (1991). Parlar, Mahmut ; GERCHAK, YIGAL . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:2:p:191-197.

Full description at Econpapers || Download paper

6
1990Economic ordering policy during special discount periods for dynamic inventory problems under certainty. (1990). Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:1:p:101-104.

Full description at Econpapers || Download paper

6
1990Analysis of multi-item inventory systems under resource constraints: A non-linear goal programming approach. (1990). Padmanabhan, G. ; Vrat, Prem . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:2:p:121-127.

Full description at Econpapers || Download paper

5
1990An inventory model under inflation for stock dependent consumption rate items. (1990). Padmanabhan, G. ; Vrat, Prem . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:379-383.

Full description at Econpapers || Download paper

5
1985International plant location under price and exchange rate uncertainty. (1985). Hodder, James E. ; Jucker, James V.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:225-229.

Full description at Econpapers || Download paper

5
1988Order batching algorithms for a man-on-board automated storage and retrieval system. (1988). Hwang, Hark ; Lee, Moon-Kyu. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:4:p:285-294.

Full description at Econpapers || Download paper

5
1987Biased selection of the inventory reorder point when demand parameters are statistically estimated. (1987). Silver, Edward A. ; Rahnama, Mina Rasty. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:283-292.

Full description at Econpapers || Download paper

5
1990On manpower planning in the presence of learning. (1990). Parlar, Mahmut ; GERCHAK, YIGAL ; Sengupta, Sankar S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:3:p:295-303.

Full description at Econpapers || Download paper

5
1987Commonality and safety stocks. (1987). Wijngaard, J. ; van Donselaar, K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:197-204.

Full description at Econpapers || Download paper

5
1990An eclectic algorithm for inventory replenishment for items with increasing linear trend in demand. (1990). Rand, Graham K. ; Amrani, Mostepha. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:261-266.

Full description at Econpapers || Download paper

4
1985Machine clustering for economic production. (1985). Stanfel, Larry E.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:73-81.

Full description at Econpapers || Download paper

4
1983Minimizing a quadratic function of job lateness on a single machine. (1983). Gupta, Sushil K. ; Sen, Tapan. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:7:y:1983:i:3:p:187-194.

Full description at Econpapers || Download paper

4
1985Algorithmic grouping of operation sequences. (1985). Balasubramanian, K. N. ; Selvam, Panneer R.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:125-134.

Full description at Econpapers || Download paper

4
1989Economic selection of a process level under acceptance sampling by variables. (1989). Carlsson, Olle. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:1:p:69-78.

Full description at Econpapers || Download paper

4
1982Lot sizing and safety stock decisions in an MRP system with demand uncertainty. (1982). Gelders, Ludo F. ; De Bodt, Marc A. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:6:y:1982:i::p:67-75.

Full description at Econpapers || Download paper

4
1989The time-cost tradeoff in research and development: A review. (1989). Graves, Samuel B.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:1:p:1-9.

Full description at Econpapers || Download paper

4
1990Cross-national comparison of production--inventory management practices. (1990). Chikan, Attila ; Whybark, Clay D.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:149-156.

Full description at Econpapers || Download paper

4
1990Comparison between just-in-time and EOQ system. (1990). Ho, Chin-Fu ; Lin, Tsong Ming ; Chyr, Fuchiao. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1990:i:3:p:233-240.

Full description at Econpapers || Download paper

3
1989Measuring logistics performance. (1989). Aronsson, Hakan ; Andersson, Par ; Storhagen, Nils G.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:253-262.

Full description at Econpapers || Download paper

3
1986Scale economies and the 0.6 rule. (1986). Tribe, Michael ; Alpine, R. L. W., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:271-278.

Full description at Econpapers || Download paper

3
1989Optimal and heuristic solutions for a simple common component inventory problem. (1989). Silver, Edward A. ; Jonsson, Henrik. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:4:p:257-267.

Full description at Econpapers || Download paper

3
1984The state of the art of present worth analysis of cash flow distributions. (1984). Carson, Dean E. ; Ganiy, Saleem A. ; Tu, Jerome C. ; Remer, Donald S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:7:y:1984:i:4:p:257-278.

Full description at Econpapers || Download paper

3
1984Lot sizing under dynamic demand conditions: A review. (1984). Gelders, Ludo F. ; De Bodt, Marc A. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:8:y:1984:i:3:p:165-187.

Full description at Econpapers || Download paper

3
1990Inventory control in case of unknown demand distribution. (1990). Bulinskaya, E. V.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:301-306.

Full description at Econpapers || Download paper

3
1991A review of research on AGVS vehicle management. (1991). Co, Christine G. ; Tanchoco, J. M. A., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:1:p:35-42.

Full description at Econpapers || Download paper

3
1990Inventory management in the manufacturing sector in developing countries. (1990). Goonatilake, Lalith. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:19-24.

Full description at Econpapers || Download paper

3
1985Capacity planning in MRP, JIT and OPT: A critique. (1985). Gelders, Ludo F. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:201-209.

Full description at Econpapers || Download paper

3
1985The impact of capacity investments on work-in-process and inventories. (1985). Olhager, Jan ; Axsater, Sven . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:119-124.

Full description at Econpapers || Download paper

3
1986Optimal system design with multiple criteria: De Novo programming approach. (1986). Zeleny, Milan . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:2:p:89-94.

Full description at Econpapers || Download paper

3
1990Decreasing expected shortages through order splitting. (1990). Silver, E. A. ; Kelle, P.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:351-357.

Full description at Econpapers || Download paper

3
1989Common component inventory problems with a budget constraint: Heuristics and upper bounds. (1989). Silver, Edward A. ; Jonsson, Henrik. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1989:i:1:p:71-81.

Full description at Econpapers || Download paper

3
1991Investment justification in flexible manufacturing systems. (1991). Kakati, M. ; Dhar, U. R.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:3:p:203-209.

Full description at Econpapers || Download paper

3
1986Multi-item inventory grouping with dependent set-up cost and group overhead cost. (1986). Chakravarty, Amiya K. ; Goyal, Suresh K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:13-23.

Full description at Econpapers || Download paper

2
1985Management systems applications of learning curves and progress functions. (1985). Towill, Denis R.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:4:p:369-383.

Full description at Econpapers || Download paper

2
1982Some features common to inventory system and process controller design. (1982). Towill, D. R. ; Yoon, S. S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:6:y:1982:i::p:225-236.

Full description at Econpapers || Download paper

2
1988Capacity allocation and material flow in planning group technology cells. (1988). Shtub, Avraham . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:3:p:217-228.

Full description at Econpapers || Download paper

2
1984A flexible multiobjective production planning framework for automated manufacturing systems. (1984). O'Grady, P. J. ; Menon, U.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:8:y:1984:i:3:p:189-198.

Full description at Econpapers || Download paper

2
1990Multiple machine replacement analysis. (1990). Leung, Lawrence C. ; Tanchoco, J. M. A., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:3:p:265-275.

Full description at Econpapers || Download paper

2
1980Present worth analysis of capital projects using a polynomial cash flow model. (1980). Almond, Brian ; Remer, Donald S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:5:y:1980:i:1:p:33-42.

Full description at Econpapers || Download paper

2
1985MRP system nervousness: Causes and cures. (1985). Kropp, Dean H. ; Millen, Robert A. ; Blackburn, Joseph D.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:141-146.

Full description at Econpapers || Download paper

2
1991A heuristic procedure for determining ordering and price-discount policies for commodities with two-period perishability. (1991). Gupta, D. ; Dai, Z.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:2:p:177-190.

Full description at Econpapers || Download paper

2
1988Product cost-estimation by the designer. (1988). Wierda, Leo S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:3:p:189-198.

Full description at Econpapers || Download paper

2
1988Bottleneck generalized assignment problems. (1988). Neebe, A. W. ; Mazzola, J. B.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:14:y:1988:i:1:p:61-65.

Full description at Econpapers || Download paper

2
1990Decision support system for production control: Multiple criteria decision making in practice. (1990). Por, Andras ; Temesi, Jozsef ; Stahl, Janos. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:2:p:213-218.

Full description at Econpapers || Download paper

2
1989Ordering and stockholding under price inflation when prices increase in successive discrete jumps. (1989). Boussofiane, Aziz ; Kingsman, Brian G.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:395-407.

Full description at Econpapers || Download paper

2
1986Estimates of the minimum nondominated criterion values in multiple-criteria decision-making. (1986). Ghiassi, M. ; Davis, W. J. ; Dessouky, M. I.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:2:p:95-104.

Full description at Econpapers || Download paper

2

Citing documents used to compute impact factor 0:


YearTitleSee

Cites in year: CiY


Warning!! This is still an experimental service. The results of this service should be interpreted with care, especially in research assessment exercises. The processing of documents is automatic. There still are errors and omissions in the identification of references. We are working to improve the software to increase the accuracy of the results.

Source data used to compute the impact factor of RePEc series.