Leo Strijbosch : Citation Profile


Are you Leo Strijbosch?

Universiteit van Tilburg

7

H index

6

i10 index

123

Citations

RESEARCH PRODUCTION:

10

Articles

51

Papers

RESEARCH ACTIVITY:

   23 years (1988 - 2011). See details.
   Cites by year: 5
   Journals where Leo Strijbosch has often published
   Relations with other researchers
   Recent citing documents: 6.    Total self citations: 20 (13.99 %)

MORE DETAILS IN:
ABOUT THIS REPORT:

   Permalink: http://citec.repec.org/pst260
   Updated: 2024-11-04    RAS profile: 2020-08-23    
   Missing citations? Add them    Incorrect content? Let us know

Relations with other researchers


Works with:

Authors registered in RePEc who have co-authored more than one work in the last five years with Leo Strijbosch.

Is cited by:

HALKOS, GEORGE (9)

Kevork, Ilias (8)

Bruzda, Joanna (6)

Nikolopoulos, Konstantinos (6)

Franses, Philip Hans (1)

Brekelmans, Ruud (1)

Grossi, Luigi (1)

Li, Feng (1)

Sermpinis, Georgios (1)

Fiszeder, Piotr (1)

Castle, Jennifer (1)

Cites to:

Borm, Peter (5)

McLean, Richard (5)

Brekelmans, Ruud (5)

Olson, Lars (4)

Sharma, Sunil (4)

Engwerda, Jacob (3)

Sharma, Shyam Sunder (2)

Kapteyn, Arie (2)

Bester, Helmut (2)

Palm, Franz (2)

Nijman, Theo (2)

Main data


Where Leo Strijbosch has published?


Journals with more than one article published# docs
European Journal of Operational Research4
International Journal of Production Economics3
Journal of the Operational Research Society2

Recent works citing Leo Strijbosch (2024 and 2023)


YearTitle of citing document
2023.

Full description at Econpapers || Download paper

2023Bombardier Aftermarket Demand Forecast with Machine Learning. (2023). Hamilton, William L ; Lemaitre, Paul ; Grangier, Philippe ; Gauthier, Lea ; Alamdari, Neda Etebari ; Adulyasak, Yossiri ; Xiao, Jingyi ; Dodin, Pierre. In: Interfaces. RePEc:inm:orinte:v:53:y:2023:i:6:p:425-445.

Full description at Econpapers || Download paper

2023Robust Pricing and Production with Information Partitioning and Adaptation. (2023). Xiong, Peng ; Tang, Qinshen ; Sim, Melvyn ; Perakis, Georgia. In: Management Science. RePEc:inm:ormnsc:v:69:y:2023:i:3:p:1398-1419.

Full description at Econpapers || Download paper

2023Stock control analytics: a data-driven approach to compute the fill rate considering undershoots. (2023). Trapero, Juan R ; Guijarro, Ester ; Babiloni, Eugenia. In: Operational Research. RePEc:spr:operea:v:23:y:2023:i:1:d:10.1007_s12351-023-00748-y.

Full description at Econpapers || Download paper

Works by Leo Strijbosch:


YearTitleTypeCited
2002Two–step sequential sampling In: Statistica Neerlandica.
[Full Text][Citation analysis]
article0
2000Two-Step Sequential Sampling.(2000) In: Discussion Paper.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
2000Two-Step Sequential Sampling.(2000) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
1999A note on the kinks at the mean variance frontier In: European Journal of Operational Research.
[Full Text][Citation analysis]
article1
1997A Note on the Kinks at the Mean Variance Frontier.(1997) In: Research Memorandum.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 1
paper
1997A Note on the Kinks at the Mean Variance Frontier.(1997) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 1
paper
2005The impact of unknown demand parameters on (R,S)-inventory control performance In: European Journal of Operational Research.
[Full Text][Citation analysis]
article15
2006Modified normal demand distributions in (R, S)-inventory control In: European Journal of Operational Research.
[Full Text][Citation analysis]
article10
1992Modelling (s, Q) inventory systems: Parametric versus non-parametric approximations for the lead time demand distribution In: European Journal of Operational Research.
[Full Text][Citation analysis]
article12
1990Modelling (s,Q) inventory systems : Parametric versus non-parametric approximations for the lead time demand distributions.(1990) In: Research Memorandum.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 12
paper
2006Cyclic production-inventory planning and control in the pre-Deco industry: A case study In: International Journal of Production Economics.
[Full Text][Citation analysis]
article4
2009Assessing the effects of using demand parameters estimates in inventory control and improving the performance using a correction function In: International Journal of Production Economics.
[Full Text][Citation analysis]
article13
2011On the interaction between forecasting and stock control: The case of non-stationary demand In: International Journal of Production Economics.
[Full Text][Citation analysis]
article16
2000A combined forecast—inventory control procedure for spare parts In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article22
1999A Combined Forecast-Inventory Control Procedure for Spare Parts.(1999) In: Research Memorandum.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 22
paper
1999A Combined Forecast-Inventory Control Procedure for Spare Parts.(1999) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 22
paper
2002Exact fill rates for (R, s, S) inventory control with gamma distributed demand In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article5
2001Exact Fill Rates for (R, s, S) Inventory Control With Gamma Distributed Demand.(2001) In: Discussion Paper.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 5
paper
2001Exact Fill Rates for (R, s, S) Inventory Control With Gamma Distributed Demand.(2001) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 5
paper
2007A Simple Approximation to the Convolution of Gamma Distributions (Revision of DP 2006-27) In: Discussion Paper.
[Full Text][Citation analysis]
paper4
2007A Simple Approximation to the Convolution of Gamma Distributions (Revision of DP 2006-27).(2007) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 4
paper
1998Improved Spare Parts Inventory Management : A Case Study In: Discussion Paper.
[Full Text][Citation analysis]
paper2
1998Improved Spare Parts Inventory Management : A Case Study.(1998) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 2
paper
2002Estimating Mean and Variance Through Quantiles : An Experimental Comparison of Different Methods In: Discussion Paper.
[Full Text][Citation analysis]
paper0
2002Estimating Mean and Variance Through Quantiles : An Experimental Comparison of Different Methods.(2002) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
1999Simple Expressions for Safety Factors in Inventory Control In: Discussion Paper.
[Full Text][Citation analysis]
paper3
1999Simple Expressions for Safety Factors in Inventory Control.(1999) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 3
paper
2003Modified Normal Demand Distributions in (R,S)-Inventory Models In: Discussion Paper.
[Full Text][Citation analysis]
paper0
2003Modified Normal Demand Distributions in (R,S)-Inventory Models.(2003) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
2002Simulating an (R,s,S) Inventory System In: Discussion Paper.
[Full Text][Citation analysis]
paper1
2002Simulating an (R,s,S) Inventory System.(2002) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 1
paper
2006Hierarchical Estimation as Basis for Hierarchical Forecasting In: Discussion Paper.
[Full Text][Citation analysis]
paper2
2006Hierarchical Estimation as Basis for Hierarchical Forecasting.(2006) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 2
paper
1997Repeated Audit Controls In: Discussion Paper.
[Full Text][Citation analysis]
paper7
1997Repeated Audit Controls.(1997) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 7
paper
2003An Experimental Comparison of Four Methods for Assessing Judgemental Distributions In: Discussion Paper.
[Full Text][Citation analysis]
paper0
2003An Experimental Comparison of Four Methods for Assessing Judgemental Distributions.(2003) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
2007How to Determine the Order-up-to Level When Demand is Gamma Distributed with Unknown Parameters In: Discussion Paper.
[Full Text][Citation analysis]
paper0
2007How to Determine the Order-up-to Level When Demand is Gamma Distributed with Unknown Parameters.(2007) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
2006Assessing the Effects of using Demand Parameters Estimates in Inventory Control In: Discussion Paper.
[Full Text][Citation analysis]
paper0
2006Assessing the Effects of using Demand Parameters Estimates in Inventory Control.(2006) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
2003Production Planning and Inventory Control in the Pre-deco Industry In: Discussion Paper.
[Full Text][Citation analysis]
paper0
2003Production Planning and Inventory Control in the Pre-deco Industry.(2003) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
2002Two-Step Sequential Sampling for Gamma Distributions In: Discussion Paper.
[Full Text][Citation analysis]
paper0
2002Two-Step Sequential Sampling for Gamma Distributions.(2002) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
1994Differentiability properties of the efficient (u,q2)-set in the Markowitz portfolio selection method In: Research Memorandum.
[Full Text][Citation analysis]
paper0
1994Differentiability properties of the efficient (u,q2)-set in the Markowitz portfolio selection method.(1994) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
1997New Proposals for the Validation of Trace-Driven Simulations In: Research Memorandum.
[Full Text][Citation analysis]
paper1
1997New Proposals for the Validation of Trace-Driven Simulations.(1997) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 1
paper
1991Investigating several alternatives for estimating the compound lead time demand in an (s,Q) inventory model In: Research Memorandum.
[Full Text][Citation analysis]
paper0
1991Investigating several alternatives for estimating the compound lead time demand in an (s,Q) inventory model.(1991) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
1988Comparison of bias-reducing methods for estimating the parameter in dilution series In: Research Memorandum.
[Full Text][Citation analysis]
paper0
1988Comparison of bias-reducing methods for estimating the parameter in dilution series.(1988) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
1990A simplified MOLP algorithm : The MOLP-S procedure In: Research Memorandum.
[Full Text][Citation analysis]
paper1
1990A simplified MOLP algorithm : The MOLP-S procedure.(1990) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 1
paper
1998Inventory Control : The Impact of Unknown Demand Distribution In: Research Memorandum.
[Full Text][Citation analysis]
paper0
1998Inventory Control : The Impact of Unknown Demand Distribution.(1998) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 0
paper
1997On the interaction between forecasting and inventory control In: Research Memorandum.
[Full Text][Citation analysis]
paper4
1997On the interaction between forecasting and inventory control.(1997) In: Other publications TiSEM.
[Full Text][Citation analysis]
This paper has nother version. Agregated cites: 4
paper
1998Redesigning storage assignment and order-picking policies of a miniload AS/RS system : A case study In: Other publications TiSEM.
[Full Text][Citation analysis]
paper0
1994Investigating several alternatives for estimating the lead time demand distribution in a continuous review inventory model In: Other publications TiSEM.
[Full Text][Citation analysis]
paper0

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated November, 3 2024. Contact: CitEc Team