Chin-Chia Wu : Citation Profile


Are you Chin-Chia Wu?

6

H index

4

i10 index

69

Citations

RESEARCH PRODUCTION:

10

Articles

RESEARCH ACTIVITY:

   14 years (2004 - 2018). See details.
   Cites by year: 4
   Journals where Chin-Chia Wu has often published
   Relations with other researchers
   Recent citing documents: 9.    Total self citations: 3 (4.17 %)

MORE DETAILS IN:
ABOUT THIS REPORT:

   Permalink: http://citec.repec.org/pwu178
   Updated: 2024-11-04    RAS profile: 2020-03-17    
   Missing citations? Add them    Incorrect content? Let us know

Relations with other researchers


Works with:

Authors registered in RePEc who have co-authored more than one work in the last five years with Chin-Chia Wu.

Is cited by:

Yang, Dar-Li (1)

Juntao, Gong (1)

Cites to:

Womer, Norman (1)

Main data


Where Chin-Chia Wu has published?


Journals with more than one article published# docs
Discrete Dynamics in Nature and Society2
International Journal of Production Economics2

Recent works citing Chin-Chia Wu (2024 and 2023)


YearTitle of citing document
2023Single-machine scheduling with product category-based learning and forgetting effects. (2023). Tauer, Bjorn ; Heuser, Patricia. In: Omega. RePEc:eee:jomega:v:115:y:2023:i:c:s0305048322001931.

Full description at Econpapers || Download paper

2023Single machine scheduling with due date assignment to minimize the total weighted lead time penalty and late work. (2023). Baewicz, Jacek ; Sterna, Magorzata ; Wang, Jun-Qiang ; Sang, Yao-Wen. In: Omega. RePEc:eee:jomega:v:121:y:2023:i:c:s0305048323000877.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

2023Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs. (2023). Zhang, Li-Han ; Wang, Ji-Bo ; Sun, Xinyu ; Pan, Lei ; Lv, Dan-Yang. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:45:y:2023:i:4:d:10.1007_s10878-023-01025-6.

Full description at Econpapers || Download paper

2023Scheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejection. (2023). Mosheiov, Gur ; Atsmony, Matan. In: Journal of Scheduling. RePEc:spr:jsched:v:26:y:2023:i:2:d:10.1007_s10951-022-00745-7.

Full description at Econpapers || Download paper

2023Optimization of scheduling problems with deterioration effects and an optional maintenance activity. (2023). Xu, Jing-Xiao ; Hu, Yang ; Geng, Xin-Na ; Liu, Tao ; Sun, Xinyu. In: Journal of Scheduling. RePEc:spr:jsched:v:26:y:2023:i:3:d:10.1007_s10951-022-00756-4.

Full description at Econpapers || Download paper

2023A note: maximizing the weighted number of Just-in-Time jobs for a given job sequence. (2023). Mosheiov, Gur ; Gerstl, Enrique. In: Journal of Scheduling. RePEc:spr:jsched:v:26:y:2023:i:4:d:10.1007_s10951-022-00772-4.

Full description at Econpapers || Download paper

2023A heuristic for single machine common due date assignment problem with different earliness/tardiness weights. (2023). Arik, Ouzhan Ahmet. In: OPSEARCH. RePEc:spr:opsear:v:60:y:2023:i:3:d:10.1007_s12597-023-00652-1.

Full description at Econpapers || Download paper

Works by Chin-Chia Wu:


YearTitleTypeCited
2016Just-in-time scheduling with two competing agents on unrelated parallel machines In: Omega.
[Full Text][Citation analysis]
article18
2013Two-machine flowshop scheduling with a truncated learning function to minimize the makespan In: International Journal of Production Economics.
[Full Text][Citation analysis]
article13
2004Minimizing total completion time in a two-machine flowshop with a learning effect In: International Journal of Production Economics.
[Full Text][Citation analysis]
article12
2018Metaheuristics for Order Scheduling Problem with Unequal Ready Times In: Discrete Dynamics in Nature and Society.
[Full Text][Citation analysis]
article0
2015Scheduling Problems with Due Date Assignment In: Discrete Dynamics in Nature and Society.
[Full Text][Citation analysis]
article0
2010Single machine scheduling with sequence-dependent family setups to minimize maximum lateness In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article3
2017Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs In: Journal of Scheduling.
[Full Text][Citation analysis]
article6
2018Single-machine scheduling and common due date assignment with potential machine disruption In: International Journal of Production Research.
[Full Text][Citation analysis]
article6
2018Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents In: Naval Research Logistics (NRL).
[Full Text][Citation analysis]
article10
2014Parallel-Machine Scheduling to Minimize Flowtime, Holding, and Batch Delivery Costs In: Asia-Pacific Journal of Operational Research (APJOR).
[Full Text][Citation analysis]
article1

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated November, 3 2024. Contact: CitEc Team