Is this page useful for you? Then, help us to keep the service working. Please have a look to our donations page ... Thanks for your help!!

International Journal of Industrial and Systems Engineering / Inderscience Enterprises Ltd


null

Impact Factor

null

5-Years IF

2

5-Years H index

Main indicators


Raw data


IF AIF IF5 DOC CDO CCU CIF CIT D2Y C2Y D5Y C5Y %SC CiY II AII
19900.1000 (%)0.04
19910.09000 (%)0.04
19920.09000 (%)0.04
19930.1000 (%)0.05
19940.11000 (%)0.05
19950.2000 (%)0.07
19960.23000 (%)0.09
19970.27000 (%)0.09
19980.29000 (%)0.1
19990.32000 (%)0.13
20000.4000 (%)0.15
20010.4000 (%)0.15
20020.42000 (%)0.18
20030.44000 (%)0.19
20040.49000 (%)0.2
20050.53000 (%)0.21
20060.51272700 (%)0.2
20070.45245112727 (%)0.18
20080.48388935151 (%)0.2
20090.47391286289 (%)0.19
20100.010.450.015017810.0127711281 (%)0.16
20110.5274252189178 (%)0.2
20120.55703227124225 (%)0.2
20130.62763984144271 (%)0.22
20140.64854832146309 (%)0.21
20150.69835661161355 (%)0.22
20160.850786442011683881 (%)0.26
IF: Impact Factor: C2Y / D2Y
AIF: Average Impact Factor for series in RePEc in year y
IF5: Impact Factor: C5Y / D5Y
DOC: Number of documents published in year y
CDO: Cumulative number of documents published until year y
CCU: Cumulative number of citations to papers published until year y
CIF: Cumulative impact factor
CIT: Number of citations to papers published in year y
D2Y: Number of articles published in y-1 plus y-2
C2Y: Cites in y to articles published in y-1 plus y-2
D5Y: Number of articles published in y-1 until y-5
C5Y: Cites in y to articles published in y-1 until y-5
%SC: Percentage of selft citations in y to articles published in y-1 plus y-2
CiY: Cites in year y to documents published in year y
II: Immediacy Index: CiY / Documents.
AII: Average Immediacy Index for series in RePEc in year y

 

50 most cited documents in this series:


#YearTitleCited
12008Facility layout design for multiple production scenarios in a dynamic environment. (2008). Cheraghi, Hossein S ; Nayak, Chandan N ; Krishnan, Krishna K. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:3:y:2008:i:2:p:105-133.

Full description at Econpapers || Download paper

2
22012Modelling the factors affecting flexibility in FMS. (2012). Attri, Rajesh ; Raj, Tilak ; Jain, Vineet . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:11:y:2012:i:4:p:350-374.

Full description at Econpapers || Download paper

2
32012Integrated models in production planning and scheduling, maintenance and quality: a review. (2012). Al-Turki, Umar M ; Rahim, Abdur ; Hadidi, Laith A. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:1:p:21-50.

Full description at Econpapers || Download paper

1
42013An application of particle swarm optimisation with negative knowledge on multi-objective U-shaped assembly line worker allocation problems. (2013). Sirovetnukul, Ronnachai ; Chutima, Parames . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:14:y:2013:i:2:p:139-174.

Full description at Econpapers || Download paper

1
52008Developing strategies fostering product development using multicriteria analysis. (2008). Mishra, R C ; Soota, Tarun ; Singh, Harvendra . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:3:y:2008:i:1:p:87-103.

Full description at Econpapers || Download paper

1
62012Effects of degraded operation modes on reliability and performance of manufacturing cells. (2012). Savsar, Mehmet . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:11:y:2012:i:1/2:p:189-204.

Full description at Econpapers || Download paper

1
72015Critical success factors of knowledge management: modelling and comparison using various techniques. (2015). Singh, Vinay ; Haleem, Abid ; Kumar, Sanjay . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:21:y:2015:i:2:p:180-206.

Full description at Econpapers || Download paper

1
82011Multi-products location–routing problem integrated with inventory under stochastic demand. (2011). Sajjadi, Seyed Reza ; Cheraghi, Hossein S. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:7:y:2011:i:4:p:454-476.

Full description at Econpapers || Download paper

1
92013Multi-criteria inventory classification through integration of fuzzy analytic hierarchy process and artificial neural network. (2013). Kabir, Golam ; Akhtar, Ahsan M. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:14:y:2013:i:1:p:74-103.

Full description at Econpapers || Download paper

1
102007Modelling randomness of a manual assembly system with walking workers. (2007). Mileham, Antony Roy ; Pan, Ling ; Wang, Qian ; Owen, Geraint Wyn ; Chatwin, Christopher Reginald ; Newnes, Linda Blyth . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:2:y:2007:i:2:p:195-210.

Full description at Econpapers || Download paper

1
112012A single machine-based scheduling optimisation model integrated with preventive maintenance policy for maximising the availability. (2012). Liao, Wenzhu ; Pan, Ershun ; Feng, Li. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:4:p:451-469.

Full description at Econpapers || Download paper

1
122014An intelligent methodology for optimising machining operation sequence by ant system algorithm. (2014). Deb, Sankha ; Singh, Sneha . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:16:y:2014:i:4:p:451-471.

Full description at Econpapers || Download paper

1
132010A dynamic opportunistic preventive maintenance policy for multi-unit series systems with intermediate buffers. (2010). Feng, Li ; Lu, Zhiqiang ; Zhou, Xiaojun . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:6:y:2010:i:3:p:276-288.

Full description at Econpapers || Download paper

1
142013Mathematical modelling for process design of walking worker assembly line in productivity and ergonomics perspectives. (2013). Luong, Lee ; Xing, KE ; Al-Zuheri, Atiya . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:14:y:2013:i:1:p:104-137.

Full description at Econpapers || Download paper

1
152017An integrated production, inventory and transportation decision in a whole green manufacturing supply chain. (2017). Zhang, David Z. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:25:y:2017:i:4:p:520-544.

Full description at Econpapers || Download paper

1
162012Servitisation strategies and sourcing decisions for product services: an exploratory study. (2012). Saccani, Nicola . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:3:p:336-354.

Full description at Econpapers || Download paper

1
172014Comparison of capacity rationing policies for a make-to-order production system with two customer classes. (2014). Piplani, Rajesh ; Liu, Shudong . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:16:y:2014:i:2:p:223-237.

Full description at Econpapers || Download paper

1
182010A framework for end-to-end approach to Systems Integration. (2010). Jain, Rashmi ; Erol, Ozgur ; Chandrasekaran, Anithashree . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:5:y:2010:i:1:p:79-109.

Full description at Econpapers || Download paper

1
192012A comparative study for optimum short-term forecasting of electricity price with uncertainty. (2012). Azadeh, Ali ; Ebrahimipour, Vahid ; Tabrizi, Babak H. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:12:y:2012:i:4:p:394-428.

Full description at Econpapers || Download paper

1
202017A simulated annealing algorithm for solving multi-depot location routing problem with backhaul. (2017). Mohammad, Mahsa Oroojeni ; KARIMI, BEHROOZ . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:25:y:2017:i:4:p:460-477.

Full description at Econpapers || Download paper

1
212012Impact of manufacturing flexibility on FMS performance: a simulation study. (2012). Sharma, Chitra ; Singholi, Ajay ; Ali, Mohammed . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:1:p:96-116.

Full description at Econpapers || Download paper

1
222013Fuzzy weighted association rule based solution approaches to facility layout problem in cellular manufacturing system. (2013). Altuntas, S ; Selim, H ; Dereli, T. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:15:y:2013:i:3:p:253-271.

Full description at Econpapers || Download paper

1
232016CO 2 emissions, energy use and country governance. (2016). Ness, Walter Lee ; Pereira, Roberto Guimares ; de Jesus, Valdir ; Harris, Jean E. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:24:y:2016:i:2:p:241-256.

Full description at Econpapers || Download paper

1

50 most relevant documents in this series (papers most cited in the last two years)


#YearTitleCited
12008Facility layout design for multiple production scenarios in a dynamic environment. (2008). Cheraghi, Hossein S ; Nayak, Chandan N ; Krishnan, Krishna K. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:3:y:2008:i:2:p:105-133.

Full description at Econpapers || Download paper

2
22012Modelling the factors affecting flexibility in FMS. (2012). Attri, Rajesh ; Raj, Tilak ; Jain, Vineet . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:11:y:2012:i:4:p:350-374.

Full description at Econpapers || Download paper

2

Citing documents used to compute impact factor 0:


YearTitle

Recent citations (cites in year: CiY)


Recent citations received in 2014

YearCiting document

Recent citations received in 2013

YearCiting document

Warning!! This is still an experimental service. The results of this service should be interpreted with care, especially in research assessment exercises. The processing of documents is automatic. There still are errors and omissions in the identification of references. We are working to improve the software to increase the accuracy of the results.

Source data used to compute the impact factor of RePEc series.

CitEc is a RePEc service, providing citation data for Economics since 2001. Sponsored by INOMICS. Last updated December, 1st 2017. Contact: CitEc Team