Is this page useful for you? Then, help us to keep the service working. Please have a look to our donations page ... Thanks for your help!!

Engineering Costs and Production Economics / Elsevier


null

Impact Factor

null

5-Years IF

9

5-Years H index

Main indicators


Raw data


IF AIF IF5 DOC CDO CCU CIF CIT D2Y C2Y D5Y C5Y %SC CiY II AII
19900.1101101121215384 (%)0.04
199100.102712810.013826014341 (%)0.04
19920.09012820.021284252 (%)0.04
19930.1112810.0127343 (%)0.05
19940.121280287 (%)0.04
19950.190.13128490.38012816 (%)0.07
19960.23128340.27027 (%)0.09
19970.26128240.1900 (%)0.09
19980.28128260.200 (%)0.1
19990.32128260.200 (%)0.13
20000.39128290.2300 (%)0.15
20010.39128310.2400 (%)0.14
20020.4128220.1700 (%)0.17
20030.43128190.1500 (%)0.18
20040.48128130.100 (%)0.19
20050.52128330.2600 (%)0.2
20060.51128350.2700 (%)0.2
20070.45128230.1800 (%)0.18
20080.48128240.1900 (%)0.2
20090.49128290.2300 (%)0.19
20100.46128230.1800 (%)0.17
20110.49128170.1300 (%)0.19
20120.52128180.1400 (%)0.19
20130.58128210.1600 (%)0.2
20140.6128160.1300 (%)0.2
20150.61128200.1600 (%)0.19
20160.68128180.1400 (%)0.2
20170.73128180.1400 (%)0.22
IF: Impact Factor: C2Y / D2Y
AIF: Average Impact Factor for series in RePEc in year y
IF5: Impact Factor: C5Y / D5Y
DOC: Number of documents published in year y
CDO: Cumulative number of documents published until year y
CCU: Cumulative number of citations to papers published until year y
CIF: Cumulative impact factor
CIT: Number of citations to papers published in year y
D2Y: Number of articles published in y-1 plus y-2
C2Y: Cites in y to articles published in y-1 plus y-2
D5Y: Number of articles published in y-1 until y-5
C5Y: Cites in y to articles published in y-1 until y-5
%SC: Percentage of selft citations in y to articles published in y-1 plus y-2
CiY: Cites in year y to documents published in year y
II: Immediacy Index: CiY / Documents.
AII: Average Immediacy Index for series in RePEc in year y

 

50 most cited documents in this series:


#YearTitleCited
11987Measuring the efficiency of service operations: An application to bank branches. (1987). Parkan, Celik ; Fiserman, Steve. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:237-242.

Full description at Econpapers || Download paper

47
21986A constant lot size model with equal and unequal sized batch shipments between production stages. (1986). Szendrovits, A. Z. ; Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:203-210.

Full description at Econpapers || Download paper

20
31991Investing in reducing lead-time randomness in continuous-review inventory models. (1991). Parlar, Mahmut ; Gerchak, Yigal. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:2:p:191-197.

Full description at Econpapers || Download paper

13
41984Lot sizing under dynamic demand conditions: A review. (1984). Gelders, Ludo F. ; De Bodt, Marc A. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:8:y:1984:i:3:p:165-187.

Full description at Econpapers || Download paper

12
51989Queueing models of Kanban and MRP controlled production systems. (1989). Buzacott, J. A.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:3-20.

Full description at Econpapers || Download paper

12
61990Economic ordering policy during special discount periods for dynamic inventory problems under certainty. (1990). Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:1:p:101-104.

Full description at Econpapers || Download paper

12
71990On manpower planning in the presence of learning. (1990). Parlar, Mahmut ; Gerchak, Yigal ; Sengupta, Sankar S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:3:p:295-303.

Full description at Econpapers || Download paper

10
81982Lot sizing and safety stock decisions in an MRP system with demand uncertainty. (1982). Gelders, Ludo F. ; De Bodt, Marc A. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:6:y:1982:i::p:67-75.

Full description at Econpapers || Download paper

10
91990Decreasing expected shortages through order splitting. (1990). Silver, E. A. ; Kelle, P.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:351-357.

Full description at Econpapers || Download paper

9
101987Biased selection of the inventory reorder point when demand parameters are statistically estimated. (1987). Silver, Edward A. ; Rahnama, Mina Rasty. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:283-292.

Full description at Econpapers || Download paper

9
111989The time-cost tradeoff in research and development: A review. (1989). Graves, Samuel B.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:1:p:1-9.

Full description at Econpapers || Download paper

9
121985International plant location under price and exchange rate uncertainty. (1985). Hodder, James E. ; Jucker, James V.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:225-229.

Full description at Econpapers || Download paper

9
131990An EOQ model for items with stock dependent consumption rate and exponential decay. (1990). Padmanabhan, G. ; Vrat, Prem. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1990:i:3:p:241-246.

Full description at Econpapers || Download paper

9
141987Commonality and safety stocks. (1987). Wijngaard, J. ; van Donselaar, K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:197-204.

Full description at Econpapers || Download paper

8
151990An inventory model under inflation for stock dependent consumption rate items. (1990). Padmanabhan, G. ; Vrat, Prem. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:379-383.

Full description at Econpapers || Download paper

8
161988Order batching algorithms for a man-on-board automated storage and retrieval system. (1988). Hwang, Hark ; Lee, Moon-Kyu. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:4:p:285-294.

Full description at Econpapers || Download paper

8
171991A review of research on AGVS vehicle management. (1991). Co, Christine G. ; Tanchoco, J. M. A., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:1:p:35-42.

Full description at Econpapers || Download paper

8
181986Optimal system design with multiple criteria: De Novo programming approach. (1986). Zeleny, Milan. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:2:p:89-94.

Full description at Econpapers || Download paper

7
191991Investment justification in flexible manufacturing systems. (1991). Kakati, M. ; Dhar, U. R.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:3:p:203-209.

Full description at Econpapers || Download paper

7
201985Machine clustering for economic production. (1985). Stanfel, Larry E.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:73-81.

Full description at Econpapers || Download paper

7
211989Optimal and heuristic solutions for a simple common component inventory problem. (1989). Silver, Edward A. ; Jonsson, Henrik . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:4:p:257-267.

Full description at Econpapers || Download paper

7
221989Multiple projects -- Multiple resources constrained scheduling: A multiobjective analysis. (1989). Siddiq, M. K. ; Mohanty, R. P.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1989:i:1:p:83-92.

Full description at Econpapers || Download paper

6
231990An eclectic algorithm for inventory replenishment for items with increasing linear trend in demand. (1990). Rand, Graham K. ; Amrani, Mostepha. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:261-266.

Full description at Econpapers || Download paper

6
241988An efficient algorithm to cluster order picking items in a wide aisle. (1988). Ratliff, H. D. ; Goetschalckx, M.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:4:p:263-271.

Full description at Econpapers || Download paper

6
251989Economic selection of a process level under acceptance sampling by variables. (1989). Carlsson, Olle. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:1:p:69-78.

Full description at Econpapers || Download paper

6
261986Estimates of the minimum nondominated criterion values in multiple-criteria decision-making. (1986). Ghiassi, M. ; Davis, W. J. ; Dessouky, M. I.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:2:p:95-104.

Full description at Econpapers || Download paper

6
271989Measuring logistics performance. (1989). Aronsson, Hakan ; Andersson, Par ; Storhagen, Nils G.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:253-262.

Full description at Econpapers || Download paper

5
281985Algorithmic grouping of operation sequences. (1985). Balasubramanian, K. N. ; Selvam, Panneer R.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:125-134.

Full description at Econpapers || Download paper

5
291988Improving storage and order picking in a person-on-board as/r system: A case study. (1988). van Oudheusden, Dirk L. ; Tzen, Ya-Juei J. ; Ko, Hwei-Tang. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:4:p:273-283.

Full description at Econpapers || Download paper

5
301989Common component inventory problems with a budget constraint: Heuristics and upper bounds. (1989). Silver, Edward A. ; Jonsson, Henrik . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1989:i:1:p:71-81.

Full description at Econpapers || Download paper

5
311990Cross-national comparison of production--inventory management practices. (1990). Chikan, Attila ; Whybark, Clay D.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:149-156.

Full description at Econpapers || Download paper

5
321990Analysis of multi-item inventory systems under resource constraints: A non-linear goal programming approach. (1990). Padmanabhan, G. ; Vrat, Prem. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:2:p:121-127.

Full description at Econpapers || Download paper

5
331988Mathes: An expert system for material handling equipment selection. (1988). Fisher, Edward L. ; Kay, Michael G. ; Farber, Jeremy B.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:14:y:1988:i:4:p:297-310.

Full description at Econpapers || Download paper

4
341985Capacity planning in MRP, JIT and OPT: A critique. (1985). Gelders, Ludo F. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:201-209.

Full description at Econpapers || Download paper

4
351986On improving replenishment policies for linear trend in demand. (1986). Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:73-76.

Full description at Econpapers || Download paper

4
361986Scale economies and the 0.6 rule. (1986). Tribe, Michael ; Alpine, R. L. W., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:271-278.

Full description at Econpapers || Download paper

4
371990Comparison between just-in-time and EOQ system. (1990). Ho, Chin-Fu ; Lin, Tsong Ming ; Chyr, Fuchiao. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1990:i:3:p:233-240.

Full description at Econpapers || Download paper

4
381990Inventory management in the manufacturing sector in developing countries. (1990). Goonatilake, Lalith. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:19-24.

Full description at Econpapers || Download paper

4
391989The service parts control problem. (1989). Yamashina, H.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:3:p:195-208.

Full description at Econpapers || Download paper

4
401983Minimizing a quadratic function of job lateness on a single machine. (1983). Gupta, Sushil K. ; Sen, Tapan. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:7:y:1983:i:3:p:187-194.

Full description at Econpapers || Download paper

4
411990Inventory control in case of unknown demand distribution. (1990). Bulinskaya, E. V.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:301-306.

Full description at Econpapers || Download paper

4
421990Complexity of single model assembly line balancing problems. (1990). Sahu, S. ; Bhattacharjee, T. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1990:i:3:p:203-214.

Full description at Econpapers || Download paper

4
431982Some features common to inventory system and process controller design. (1982). Towill, D. R. ; Yoon, S. S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:6:y:1982:i::p:225-236.

Full description at Econpapers || Download paper

4
441987Application of multicriterional analysis to the ranking and evaluation of the investment programmes in the ready mixed concrete industry. (1987). Mladineo, Nenad ; Ribarovic, Zoran. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:367-374.

Full description at Econpapers || Download paper

3
451989Rationing safety stock in the USAFs multi echelon inventory system. (1989). Rinks, Dan B.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:99-109.

Full description at Econpapers || Download paper

3
461991Bicriterion jobshop scheduling with total flowtime and sum of squared lateness. (1991). Dileepan, Parthasarati ; Sen, Tapan. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:3:p:295-299.

Full description at Econpapers || Download paper

3
471990Minimizing a generalized quadratic penalty function of job completion times: An improved branch-and-bound approach. (1990). Ruparel, Bharat ; Sen, Tapan ; Dileepan, Parthasarati. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1990:i:3:p:197-202.

Full description at Econpapers || Download paper

3
481988Bottleneck generalized assignment problems. (1988). Neebe, A. W. ; Mazzola, J. B.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:14:y:1988:i:1:p:61-65.

Full description at Econpapers || Download paper

3
491985MRP system nervousness: Causes and cures. (1985). Kropp, Dean H. ; Millen, Robert A. ; Blackburn, Joseph D.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:141-146.

Full description at Econpapers || Download paper

3
501989The effect of discounting on inventory lot sizing models. (1989). Park, Chan S. ; Son, Young K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:1:p:35-48.

Full description at Econpapers || Download paper

3

50 most relevant documents in this series (papers most cited in the last two years)


#YearTitleCited
11990On manpower planning in the presence of learning. (1990). Parlar, Mahmut ; Gerchak, Yigal ; Sengupta, Sankar S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:3:p:295-303.

Full description at Econpapers || Download paper

4
21990Economic ordering policy during special discount periods for dynamic inventory problems under certainty. (1990). Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:1:p:101-104.

Full description at Econpapers || Download paper

3
31984Lot sizing under dynamic demand conditions: A review. (1984). Gelders, Ludo F. ; De Bodt, Marc A. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:8:y:1984:i:3:p:165-187.

Full description at Econpapers || Download paper

3
41990Assessing manufacturing system performance: Frequency response revisited. (1990). Towill, D. R. ; Edghill, J.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:319-326.

Full description at Econpapers || Download paper

2
51987Measuring the efficiency of service operations: An application to bank branches. (1987). Parkan, Celik ; Fiserman, Steve. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:237-242.

Full description at Econpapers || Download paper

2
61982Lot sizing and safety stock decisions in an MRP system with demand uncertainty. (1982). Gelders, Ludo F. ; De Bodt, Marc A. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:6:y:1982:i::p:67-75.

Full description at Econpapers || Download paper

2
71986Optimal system design with multiple criteria: De Novo programming approach. (1986). Zeleny, Milan. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:2:p:89-94.

Full description at Econpapers || Download paper

2
81989Applying the principles of optimized production technology in a small manufacturing company. (1989). Ashcroft, S. H.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:79-88.

Full description at Econpapers || Download paper

2
91990An inventory model under inflation for stock dependent consumption rate items. (1990). Padmanabhan, G. ; Vrat, Prem. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:379-383.

Full description at Econpapers || Download paper

2

Citing documents used to compute impact factor 0:


YearTitle

Recent citations (cites in year: CiY)


10 most frequent citing series


#SeriesCites

Warning!! This is still an experimental service. The results of this service should be interpreted with care, especially in research assessment exercises. The processing of documents is automatic. There still are errors and omissions in the identification of references. We are working to improve the software to increase the accuracy of the results.

Source data used to compute the impact factor of RePEc series.

CitEc is a RePEc service, providing citation data for Economics since 2001. Sponsored by INOMICS. Last updated December, 2th 2018. Contact: CitEc Team