[Raw data] [50 most cited papers] [50 most relevant papers] [cites used to compute IF] [Recent citations ][Frequent citing series ] [more data in EconPapers] [trace new citations] [Missing citations? Add them now] [Incorrect content? Let us know]
IF | AIF | CIF | IF5 | DOC | CDO | CIT | NCI | CCU | D2Y | C2Y | D5Y | C5Y | SC | %SC | CiY | II | AII | |
1990 | 0 | 0.08 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.04 | |||||
1991 | 0 | 0.08 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.04 | |||||
1992 | 0 | 0.08 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.04 | |||||
1993 | 0 | 0.1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.05 | |||||
1994 | 0 | 0.11 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.05 | |||||
1995 | 0 | 0.19 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.08 | |||||
1996 | 0 | 0.22 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.1 | |||||
1997 | 0 | 0.22 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.09 | |||||
1998 | 0 | 0.26 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.12 | |||||
1999 | 0 | 0.28 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.14 | |||||
2000 | 0 | 0.33 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.15 | |||||
2001 | 0 | 0.36 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.15 | |||||
2002 | 0 | 0.39 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.21 | |||||
2003 | 0 | 0.4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.2 | |||||
2004 | 0 | 0.45 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.2 | |||||
2005 | 0 | 0.46 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.22 | |||||
2006 | 0 | 0.46 | 0 | 0 | 27 | 27 | 2 | 0 | 0 | 0 | 0 | 0 | 0.21 | |||||
2007 | 0 | 0.42 | 0 | 0 | 24 | 51 | 3 | 0 | 27 | 27 | 0 | 0 | 0.18 | |||||
2008 | 0 | 0.44 | 0 | 0 | 38 | 89 | 7 | 0 | 51 | 51 | 0 | 0 | 0.21 | |||||
2009 | 0 | 0.44 | 0 | 0 | 39 | 128 | 1 | 0 | 62 | 89 | 0 | 0 | 0.21 | |||||
2010 | 0.01 | 0.43 | 0.01 | 0.01 | 50 | 178 | 2 | 1 | 1 | 77 | 1 | 128 | 1 | 0 | 0 | 0.18 | ||
2011 | 0 | 0.46 | 0 | 0 | 74 | 252 | 10 | 1 | 2 | 89 | 178 | 0 | 1 | 0.01 | 0.21 | |||
2012 | 0 | 0.47 | 0 | 0 | 70 | 322 | 16 | 2 | 124 | 225 | 0 | 0 | 0.19 | |||||
2013 | 0 | 0.53 | 0 | 0 | 76 | 398 | 15 | 1 | 3 | 144 | 271 | 1 | 0 | 0 | 0.22 | |||
2014 | 0 | 0.55 | 0 | 0 | 85 | 483 | 6 | 1 | 4 | 146 | 309 | 0 | 0 | 0.22 | ||||
2015 | 0 | 0.56 | 0.01 | 0.01 | 83 | 566 | 9 | 4 | 8 | 161 | 355 | 2 | 0 | 1 | 0.01 | 0.21 | ||
2016 | 0.01 | 0.58 | 0.01 | 0.01 | 78 | 644 | 7 | 8 | 16 | 168 | 1 | 388 | 4 | 0 | 0 | 0.2 | ||
2017 | 0.02 | 0.6 | 0.04 | 0.05 | 80 | 724 | 3 | 29 | 45 | 161 | 4 | 392 | 18 | 1 | 3.4 | 2 | 0.03 | 0.22 |
2018 | 0.02 | 0.76 | 0.03 | 0.04 | 84 | 808 | 3 | 28 | 73 | 158 | 3 | 402 | 16 | 0 | 2 | 0.02 | 0.31 |
IF: | Impact Factor: C2Y / D2Y |
AIF: | Average Impact Factor for series in RePEc in year y |
CIF: | Cumulative impact factor |
IF5: | Impact Factor: C5Y / D5Y |
DOC: | Number of documents published in year y |
CDO: | Cumulative number of documents published until year y |
CIT: | Number of citations to papers published in year y |
NCI: | Number of citations in year y |
CCU: | Cumulative number of citations to papers published until year y |
D2Y: | Number of articles published in y-1 plus y-2 |
C2Y: | Cites in y to articles published in y-1 plus y-2 |
D5Y: | Number of articles published in y-1 until y-5 |
C5Y: | Cites in y to articles published in y-1 until y-5 |
SC: | selft citations in y to articles published in y-1 plus y-2 |
%SC: | Percentage of selft citations in y to articles published in y-1 plus y-2 |
CiY: | Cites in year y to documents published in year y |
II: | Immediacy Index: CiY / Documents. |
AII: | Average Immediacy Index for series in RePEc in year y |
# | Year | Title | Cited |
---|---|---|---|
1 | 2013 | Multi-criteria inventory classification through integration of fuzzy analytic hierarchy process and artificial neural network. (2013). Kabir, Golam ; Akhtar, Ahsan M. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:14:y:2013:i:1:p:74-103. Full description at Econpapers || Download paper | 5 |
2 | 2013 | Selecting maintenance strategy in mining industry by analytic network process and TOPSIS. (2013). Pourjavad, Ehsan ; Shahin, Arash ; Shirouyehzad, Hadi. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:15:y:2013:i:2:p:171-192. Full description at Econpapers || Download paper | 3 |
3 | 2012 | Integrated models in production planning and scheduling, maintenance and quality: a review. (2012). Al-Turki, Umar M ; Rahim, Abdur ; Hadidi, Laith A. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:1:p:21-50. Full description at Econpapers || Download paper | 3 |
4 | 2015 | Critical success factors of knowledge management: modelling and comparison using various techniques. (2015). Singh, Vinay ; Haleem, Abid ; Kumar, Sanjay. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:21:y:2015:i:2:p:180-206. Full description at Econpapers || Download paper | 3 |
5 | 2008 | Facility layout design for multiple production scenarios in a dynamic environment. (2008). Cheraghi, Hossein S ; Nayak, Chandan N ; Krishnan, Krishna K. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:3:y:2008:i:2:p:105-133. Full description at Econpapers || Download paper | 3 |
6 | 2013 | Assessing resilience in a regional road-based transportation network. (2013). Omer, Mayada ; Nilchiani, Roshanak ; Mostashari, Ali. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:13:y:2013:i:4:p:389-408. Full description at Econpapers || Download paper | 3 |
7 | 2018 | An updated literature review of agile manufacturing: classification and trends. (2018). Soepardi, Apriani ; Tama, Ishardita Pambudi ; Santoso, Purnomo Budi ; Pratikto, Pratikto. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:29:y:2018:i:1:p:95-126. Full description at Econpapers || Download paper | 2 |
8 | 2012 | Modelling the factors affecting flexibility in FMS. (2012). Attri, Rajesh ; Raj, Tilak ; Jain, Vineet. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:11:y:2012:i:4:p:350-374. Full description at Econpapers || Download paper | 2 |
9 | 2011 | Behavioural analysis of urea decomposition system in a fertiliser plant. (2011). Garg, Harish ; Sharma, S P. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:8:y:2011:i:3:p:271-297. Full description at Econpapers || Download paper | 2 |
10 | 2014 | An intelligent methodology for optimising machining operation sequence by ant system algorithm. (2014). Deb, Sankha ; Singh, Sneha . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:16:y:2014:i:4:p:451-471. Full description at Econpapers || Download paper | 2 |
11 | 2012 | A single machine-based scheduling optimisation model integrated with preventive maintenance policy for maximising the availability. (2012). Liao, Wenzhu ; Pan, Ershun ; Feng, LI. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:4:p:451-469. Full description at Econpapers || Download paper | 2 |
12 | 2010 | A framework for end-to-end approach to Systems Integration. (2010). Jain, Rashmi ; Erol, Ozgur ; Chandrasekaran, Anithashree . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:5:y:2010:i:1:p:79-109. Full description at Econpapers || Download paper | 2 |
13 | 2012 | A framework for selection of logistics outsourcing partner in uncertain environment using TOPSIS. (2012). Bhardwaj, Arvind ; Sachdeva, Anish ; Gupta, Rajesh . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:12:y:2012:i:2:p:223-242. Full description at Econpapers || Download paper | 1 |
14 | 2016 | Simulating operations process to achieve a hybrid optimal operational performance in supply chain scheduling: a case study. (2016). Sigari, Salman . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:23:y:2016:i:2:p:254-262. Full description at Econpapers || Download paper | 1 |
15 | 2011 | Capacity management of an electricity service centre using simulation. (2011). Michael, Sony ; Mariappan, V. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:8:y:2011:i:4:p:472-491. Full description at Econpapers || Download paper | 1 |
16 | 2015 | A hybrid approach using ISM and modified TOPSIS for the evaluation of flexibility in FMS. (2015). Jain, Vineet ; Raj, Tilak. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:19:y:2015:i:3:p:389-406. Full description at Econpapers || Download paper | 1 |
17 | 2008 | Software quality measurement and improvement for real-time systems using quality tools and techniques: a case study. (2008). Amuthakkannan, R ; Vijayalakshmi, K ; Selladurai, V. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:3:y:2008:i:2:p:229-256. Full description at Econpapers || Download paper | 1 |
18 | 2012 | Servitisation strategies and sourcing decisions for product services: an exploratory study. (2012). Saccani, Nicola. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:3:p:336-354. Full description at Econpapers || Download paper | 1 |
19 | 2015 | Assessment of qualitative factors affecting uncertainty measurement using AHP. (2015). Mandavgade, Nitin K ; Lakhe, R R ; Jaju, S B. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:21:y:2015:i:3:p:277-301. Full description at Econpapers || Download paper | 1 |
20 | 2011 | Genetic Algorithm for optimisation of distribution system in a single stage supply chain network with fixed charges. (2011). Selladurai, V ; Manimaran, P ; Sasikumar, G ; Ranganathan, Rajesh . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:7:y:2011:i:3:p:292-316. Full description at Econpapers || Download paper | 1 |
21 | 2013 | Foreign exchange rate forecasting with a virtual-expert partial-consensus fuzzy-neural approach for semiconductor manufacturers in Taiwan. (2013). Chen, Toly. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:13:y:2013:i:1:p:73-91. Full description at Econpapers || Download paper | 1 |
22 | 2017 | Risk analysis of compressor house unit in thermal power plant using integrated fuzzy FMEA and GRA approach. (2017). Kumar, Dinesh ; Panchal, Dilbagh. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:25:y:2017:i:2:p:228-250. Full description at Econpapers || Download paper | 1 |
23 | 2014 | ACO-based method for single machine scheduling with sequence-dependent setup time and limited capacity warehouse. (2014). Wang, Shijin. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:16:y:2014:i:3:p:334-364. Full description at Econpapers || Download paper | 1 |
24 | 2007 | Modelling randomness of a manual assembly system with walking workers. (2007). Mileham, Antony Roy ; Pan, Ling ; Wang, Qian ; Owen, Geraint Wyn ; Chatwin, Christopher Reginald ; Newnes, Linda Blyth . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:2:y:2007:i:2:p:195-210. Full description at Econpapers || Download paper | 1 |
25 | 2015 | Vendor managed inventory models for single-vendor multi-retailer supply chains with quality consideration. (2015). Darwish, Mohammed A ; Goyal, Suresh Kumar ; Odah, Osama M. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:20:y:2015:i:1:p:22-57. Full description at Econpapers || Download paper | 1 |
26 | 2009 | Performance analysis of scheduling rules in resource-constrained multiple projects. (2009). Kanagasabapathi, Balasubramanian ; Ananthanarayanan, Kuppuswamy ; Rajendran, Chandrasekharan. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:4:y:2009:i:5:p:502-535. Full description at Econpapers || Download paper | 1 |
27 | 2016 | Analysis of FM/FM/c queuing system: using fuzzy approach and parametric nonlinear programming. (2016). Bagherinejad, Jafar ; Pishkenari, S B. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:23:y:2016:i:2:p:125-140. Full description at Econpapers || Download paper | 1 |
28 | 2013 | An application of particle swarm optimisation with negative knowledge on multi-objective U-shaped assembly line worker allocation problems. (2013). Sirovetnukul, Ronnachai ; Chutima, Parames. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:14:y:2013:i:2:p:139-174. Full description at Econpapers || Download paper | 1 |
29 | 2018 | Reliability analysis of non-repairable weighted k -out-of- n system using belief universal generating function. (2018). Jaiswal, Namita ; Singh, S B ; Negi, Seema. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:28:y:2018:i:3:p:300-318. Full description at Econpapers || Download paper | 1 |
30 | 2015 | Dynamic portfolio selection with liability and stochastic interest rates in the utility framework. (2015). Chang, Hao. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:19:y:2015:i:2:p:169-189. Full description at Econpapers || Download paper | 1 |
31 | 2008 | Supply chain performance measurement system: a Monte Carlo DEA-based approach. (2008). Lee, LooHay ; Wong, Wai Peng ; Jaruphongsa, Wikrom . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:3:y:2008:i:2:p:162-188. Full description at Econpapers || Download paper | 1 |
32 | 2012 | Multi-party multi-period supply chain coordination. (2012). Leong, Thin-Yin . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:3:p:300-318. Full description at Econpapers || Download paper | 1 |
33 | 2011 | Automotive robotic body shop simulation for performance improvement using plant feedback. (2011). Pandian, Annamalai ; Ali, Ahad. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:7:y:2011:i:3:p:269-291. Full description at Econpapers || Download paper | 1 |
34 | 2013 | Design of a fuzzy expert system for determining adjusted price of products and services. (2013). Fazlollahtabar, Hamed ; Hesami, Masoud ; Nosratabadi, Hamid Eslami . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:13:y:2013:i:1:p:1-26. Full description at Econpapers || Download paper | 1 |
35 | 2016 | Sustainable development index on macro-level in industrial estates and specialised sectors. (2016). Garbie, Ibrahim H. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:24:y:2016:i:3:p:384-421. Full description at Econpapers || Download paper | 1 |
36 | 2014 | Comparison of capacity rationing policies for a make-to-order production system with two customer classes. (2014). Piplani, Rajesh ; Liu, Shudong . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:16:y:2014:i:2:p:223-237. Full description at Econpapers || Download paper | 1 |
37 | 2007 | A design of experiment based procedure for real-time forecasting. (2007). Arul, Shankar Vinay ; Naganathan, V ; Nachiappan, S P ; Gunasekaran, Angappa. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:2:y:2007:i:1:p:61-78. Full description at Econpapers || Download paper | 1 |
38 | 2012 | Efficiency measurement in fuzzy additive data envelopment analysis. (2012). Tavana, Madjid ; Hatami-Marbini, Adel ; Saati, Saber ; Emrouznejad, Ali. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:1:p:1-20. Full description at Econpapers || Download paper | 1 |
39 | 2006 | A multi-stage stochastic methodology for whole hospital bed planning under peak loading. (2006). Cochran, Jeffery K ; Bharti, Aseem . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:1:y:2006:i:1/2:p:8-36. Full description at Econpapers || Download paper | 1 |
40 | 2009 | Mathematical modelling of feature conversion. (2009). Ullah, Hamid ; Erik , . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:4:y:2009:i:1:p:94-110. Full description at Econpapers || Download paper | 1 |
41 | 2012 | Effects of degraded operation modes on reliability and performance of manufacturing cells. (2012). Savsar, Mehmet . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:11:y:2012:i:1/2:p:189-204. Full description at Econpapers || Download paper | 1 |
42 | 2016 | Condition-based monitoring for underground mobile machines. (2016). Ruuska, Jari ; Saari, Juhamatti ; Lahdelma, Sulo ; Laukka, Arto ; Juuso, Esko . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:23:y:2016:i:1:p:74-89. Full description at Econpapers || Download paper | 1 |
43 | 2011 | Analysis of an EPC project: a solution to the resource constrained project scheduling problem using genetic algorithms. (2011). Jain, Karuna ; Suresh, M ; Dutta, Pankaj. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:8:y:2011:i:2:p:251-269. Full description at Econpapers || Download paper | 1 |
44 | 2017 | Production allocation decision using revenue sharing contract with prior commitments and two-way penalties. (2017). Shafiq, Muhammad ; Luong, Huynh Trung . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:26:y:2017:i:2:p:247-274. Full description at Econpapers || Download paper | 1 |
45 | 2012 | Metaheuristic in facility layout problems: current trend and future direction. (2012). Kundu, Anirban ; Dan, Pranab K. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:2:p:238-253. Full description at Econpapers || Download paper | 1 |
46 | 2015 | A study on the importance of selection rules within unbalanced MTO POLCA-controlled production systems. (2015). Castellano, Davide ; Braglia, Marcello ; Frosolini, Marco. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:20:y:2015:i:4:p:457-468. Full description at Econpapers || Download paper | 1 |
47 | 2011 | EEG based analysis of cognitive fatigue during simulated driving. (2011). Balasubramanian, Venkatesh ; Gupta, A ; Adalarasu, K. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:7:y:2011:i:2:p:135-149. Full description at Econpapers || Download paper | 1 |
48 | 2012 | Developing a new cross-efficiency model with undesirable outputs for supplier selection. (2012). Zoroufchi, Kamyar Hosseinzadeh ; Saen, Reza Farzipoor ; Azadi, Majid . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:12:y:2012:i:4:p:470-484. Full description at Econpapers || Download paper | 1 |
49 | 2016 | CO 2 emissions, energy use and country governance. (2016). Ness, Walter Lee ; Pereira, Roberto Guimares ; de Jesus, Valdir ; Harris, Jean E. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:24:y:2016:i:2:p:241-256. Full description at Econpapers || Download paper | 1 |
50 | 2011 | Design of a facility layout model in hybrid cellular manufacturing systems under variable demand. (2011). Ariafar, Shahram ; Firoozi, Zahra ; Anuar, Mohd Khairol ; Tang, Sai Hong ; Ismail, Napsiah . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:9:y:2011:i:4:p:373-387. Full description at Econpapers || Download paper | 1 |
# | Year | Title | Cited |
---|---|---|---|
1 | 2013 | Multi-criteria inventory classification through integration of fuzzy analytic hierarchy process and artificial neural network. (2013). Kabir, Golam ; Akhtar, Ahsan M. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:14:y:2013:i:1:p:74-103. Full description at Econpapers || Download paper | 5 |
2 | 2012 | Integrated models in production planning and scheduling, maintenance and quality: a review. (2012). Al-Turki, Umar M ; Rahim, Abdur ; Hadidi, Laith A. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:10:y:2012:i:1:p:21-50. Full description at Econpapers || Download paper | 3 |
3 | 2013 | Assessing resilience in a regional road-based transportation network. (2013). Omer, Mayada ; Nilchiani, Roshanak ; Mostashari, Ali. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:13:y:2013:i:4:p:389-408. Full description at Econpapers || Download paper | 3 |
4 | 2008 | Facility layout design for multiple production scenarios in a dynamic environment. (2008). Cheraghi, Hossein S ; Nayak, Chandan N ; Krishnan, Krishna K. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:3:y:2008:i:2:p:105-133. Full description at Econpapers || Download paper | 3 |
5 | 2018 | An updated literature review of agile manufacturing: classification and trends. (2018). Soepardi, Apriani ; Tama, Ishardita Pambudi ; Santoso, Purnomo Budi ; Pratikto, Pratikto. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:29:y:2018:i:1:p:95-126. Full description at Econpapers || Download paper | 2 |
6 | 2015 | Critical success factors of knowledge management: modelling and comparison using various techniques. (2015). Singh, Vinay ; Haleem, Abid ; Kumar, Sanjay. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:21:y:2015:i:2:p:180-206. Full description at Econpapers || Download paper | 2 |
7 | 2011 | Behavioural analysis of urea decomposition system in a fertiliser plant. (2011). Garg, Harish ; Sharma, S P. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:8:y:2011:i:3:p:271-297. Full description at Econpapers || Download paper | 2 |
8 | 2012 | Modelling the factors affecting flexibility in FMS. (2012). Attri, Rajesh ; Raj, Tilak ; Jain, Vineet. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:11:y:2012:i:4:p:350-374. Full description at Econpapers || Download paper | 2 |
9 | 2013 | Selecting maintenance strategy in mining industry by analytic network process and TOPSIS. (2013). Pourjavad, Ehsan ; Shahin, Arash ; Shirouyehzad, Hadi. In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:15:y:2013:i:2:p:171-192. Full description at Econpapers || Download paper | 2 |
10 | 2014 | An intelligent methodology for optimising machining operation sequence by ant system algorithm. (2014). Deb, Sankha ; Singh, Sneha . In: International Journal of Industrial and Systems Engineering. RePEc:ids:ijisen:v:16:y:2014:i:4:p:451-471. Full description at Econpapers || Download paper | 2 |
Year | Title | |
---|---|---|
2018 | Integrated multiproduct batch production and truck shipment scheduling under different shipping policies. (2018). Banerjee, Avijit ; Salam, Umit. In: Omega. RePEc:eee:jomega:v:74:y:2018:i:c:p:70-81. Full description at Econpapers || Download paper | |
2018 | Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints. (2018). Garcia-Villoria, Alberto ; Pastor, Rafael ; Nadal, Adria ; Corominas, Albert. In: European Journal of Operational Research. RePEc:eee:ejores:v:271:y:2018:i:3:p:882-895. Full description at Econpapers || Download paper | |
2018 | Detecting operation regimes using unsupervised clustering with infected group labelling to improve machine diagnostics and prognostics. (2018). Saari, Juhamatti ; Odelius, Johan. In: Operations Research Perspectives. RePEc:eee:oprepe:v:5:y:2018:i:c:p:232-244. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2018 | Linking of Barriers to Energy Efficiency Improvement in Indonesiaâs Steel Industry. (2018). Soepardi, Apriani ; Thollander, Patrik ; Tama, Ishardita Pambudi ; Santoso, Purnomo Budi ; Pratikto, Pratikto. In: Energies. RePEc:gam:jeners:v:11:y:2018:i:1:p:234-:d:127652. Full description at Econpapers || Download paper | |
2018 | Analysis of Relationships among Organizational Barriers to Energy Efficiency Improvement: A Case Study in Indonesiaâs Steel Industry. (2018). Soepardi, Apriani ; Thollander, Patrik. In: Sustainability. RePEc:gam:jsusta:v:10:y:2018:i:1:p:216-:d:127284. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2017 | Multi-objective inter-terminal truck routing. (2017). Heilig, Leonard ; Voss, Stefan ; Lalla-Ruiz, Eduardo. In: Transportation Research Part E: Logistics and Transportation Review. RePEc:eee:transe:v:106:y:2017:i:c:p:178-202. Full description at Econpapers || Download paper | |
2017 | Stochastic behaviour analysis of real industrial system. (2017). Panchal, Dilbagh ; Kumar, Dinesh. In: International Journal of System Assurance Engineering and Management. RePEc:spr:ijsaem:v:8:y:2017:i:2:d:10.1007_s13198-017-0579-7. Full description at Econpapers || Download paper |
Year | Citing document |
---|
Year | Citing document | |
---|---|---|
2015 | Tratti evolutivi della società della conoscenza: il contributo degli studi sulle reti nella prospettiva sistemica. (2015). Formisano, Vincenzo ; Damore, Raffaele ; Caputo, Francesco. In: ESPERIENZE D'IMPRESA. RePEc:fan:eieiei:v:html10.3280/ei2015-002003. Full description at Econpapers || Download paper |