[Raw data] [50 most cited papers] [50 most relevant papers] [cites used to compute IF] [Recent citations ][Frequent citing series ] [more data in EconPapers] [trace new citations] [Missing citations? Add them now] [Incorrect content? Let us know]
IF | AIF | CIF | IF5 | DOC | CDO | CIT | NCI | CCU | D2Y | C2Y | D5Y | C5Y | SC | %SC | CiY | II | AII | |
1980 | 0 | 15 | 15 | 0 | 0 | |||||||||||||
1981 | 0 | 19 | 34 | 0 | 0 | |||||||||||||
1982 | 0 | 41 | 75 | 0 | 1 | 0 | 1 | |||||||||||
1983 | 0 | 18 | 93 | 0 | 0 | |||||||||||||
1984 | 0 | 25 | 118 | 0 | 0 | |||||||||||||
1985 | 0 | 51 | 169 | 0 | 0 | |||||||||||||
1986 | 0 | 36 | 205 | 0 | 0 | |||||||||||||
1987 | 0 | 82 | 287 | 0 | 1 | 0 | ||||||||||||
1988 | 0 | 56 | 343 | 0 | 1 | 0 | ||||||||||||
1989 | 0 | 159 | 502 | 0 | 2 | 0 | 1 | |||||||||||
1990 | 0 | 0.1 | 0 | 0 | 101 | 603 | 149 | 0 | 215 | 384 | 0 | 0 | 0.05 | |||||
1991 | 0.01 | 0.1 | 0.01 | 0.01 | 27 | 630 | 45 | 4 | 4 | 260 | 3 | 434 | 4 | 0 | 0 | 0.05 |
IF: | Two years Impact Factor: C2Y / D2Y |
AIF: | Average Impact Factor for all series in RePEc in year y |
CIF: | Cumulative impact factor |
IF5: | Five years Impact Factor: C5Y / D5Y |
DOC: | Number of documents published in year y |
CDO: | Cumulative number of documents published until year y |
CIT: | Number of citations to papers published in year y |
NCI: | Number of citations in year y |
CCU: | Cumulative number of citations to papers published until year y |
D2Y: | Number of articles published in y-1 plus y-2 |
C2Y: | Cites in y to articles published in y-1 plus y-2 |
D5Y: | Number of articles published in y-1 until y-5 |
C5Y: | Cites in y to articles published in y-1 until y-5 |
SC: | selft citations in y to articles published in y-1 plus y-2 |
%SC: | Percentage of selft citations in y to articles published in y-1 plus y-2 |
CiY: | Cites in year y to documents published in year y |
II: | Immediacy Index: CiY / Documents. |
AII: | Average Immediacy Index for series in RePEc in year y |
# | Year | Title | Cited |
---|---|---|---|
1 | 1987 | Measuring the efficiency of service operations: An application to bank branches. (1987). Parkan, Celik ; Fiserman, Steve. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:237-242. Full description at Econpapers || Download paper | 61 |
2 | 1986 | A constant lot size model with equal and unequal sized batch shipments between production stages. (1986). Szendrovits, A. Z. ; Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:203-210. Full description at Econpapers || Download paper | 21 |
3 | 1989 | Queueing models of Kanban and MRP controlled production systems. (1989). Buzacott, J. A.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:3-20. Full description at Econpapers || Download paper | 16 |
4 | 1982 | Lot sizing and safety stock decisions in an MRP system with demand uncertainty. (1982). Gelders, Ludo F. ; De Bodt, Marc A. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:6:y:1982:i::p:67-75. Full description at Econpapers || Download paper | 16 |
5 | 1987 | Biased selection of the inventory reorder point when demand parameters are statistically estimated. (1987). Silver, Edward A. ; Rahnama, Mina Rasty. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:283-292. Full description at Econpapers || Download paper | 15 |
6 | 1991 | A review of research on AGVS vehicle management. (1991). Co, Christine G. ; Tanchoco, J. M. A., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:1:p:35-42. Full description at Econpapers || Download paper | 14 |
7 | 1991 | Investing in reducing lead-time randomness in continuous-review inventory models. (1991). Parlar, Mahmut ; Gerchak, Yigal. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:2:p:191-197. Full description at Econpapers || Download paper | 14 |
8 | 1990 | On manpower planning in the presence of learning. (1990). Parlar, Mahmut ; Gerchak, Yigal ; Sengupta, Sankar S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:3:p:295-303. Full description at Econpapers || Download paper | 13 |
9 | 1985 | International plant location under price and exchange rate uncertainty. (1985). Hodder, James E. ; Jucker, James V.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:225-229. Full description at Econpapers || Download paper | 13 |
10 | 1984 | Lot sizing under dynamic demand conditions: A review. (1984). Gelders, Ludo F. ; De Bodt, Marc A. ; Van Wassenhove, Luk N.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:8:y:1984:i:3:p:165-187. Full description at Econpapers || Download paper | 12 |
11 | 1986 | Scale economies and the 0.6 rule. (1986). Tribe, Michael ; Alpine, R. L. W., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:271-278. Full description at Econpapers || Download paper | 12 |
12 | 1990 | Decreasing expected shortages through order splitting. (1990). Silver, E. A. ; Kelle, P.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:351-357. Full description at Econpapers || Download paper | 12 |
13 | 1990 | Economic ordering policy during special discount periods for dynamic inventory problems under certainty. (1990). Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:1:p:101-104. Full description at Econpapers || Download paper | 11 |
14 | 1989 | Multiple projects -- Multiple resources constrained scheduling: A multiobjective analysis. (1989). Siddiq, M. K. ; Mohanty, R. P.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1989:i:1:p:83-92. Full description at Econpapers || Download paper | 11 |
15 | 1989 | The time-cost tradeoff in research and development: A review. (1989). Graves, Samuel B.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:1:p:1-9. Full description at Econpapers || Download paper | 10 |
16 | 1986 | Estimates of the minimum nondominated criterion values in multiple-criteria decision-making. (1986). Ghiassi, M. ; Davis, W. J. ; Dessouky, M. I.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:2:p:95-104. Full description at Econpapers || Download paper | 10 |
17 | 1985 | Machine clustering for economic production. (1985). Stanfel, Larry E.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:73-81. Full description at Econpapers || Download paper | 9 |
18 | 1990 | An EOQ model for items with stock dependent consumption rate and exponential decay. (1990). Padmanabhan, G. ; Vrat, Prem. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1990:i:3:p:241-246. Full description at Econpapers || Download paper | 9 |
19 | 1989 | Common component inventory problems with a budget constraint: Heuristics and upper bounds. (1989). Silver, Edward A. ; Jonsson, Henrik . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1989:i:1:p:71-81. Full description at Econpapers || Download paper | 8 |
20 | 1987 | Commonality and safety stocks. (1987). Wijngaard, J. ; van Donselaar, K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:197-204. Full description at Econpapers || Download paper | 8 |
21 | 1988 | An efficient algorithm to cluster order picking items in a wide aisle. (1988). Ratliff, H. D. ; Goetschalckx, M.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:4:p:263-271. Full description at Econpapers || Download paper | 8 |
22 | 1986 | Optimal system design with multiple criteria: De Novo programming approach. (1986). Zeleny, Milan. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:2:p:89-94. Full description at Econpapers || Download paper | 8 |
23 | 1990 | An inventory model under inflation for stock dependent consumption rate items. (1990). Padmanabhan, G. ; Vrat, Prem. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:379-383. Full description at Econpapers || Download paper | 8 |
24 | 1988 | Order batching algorithms for a man-on-board automated storage and retrieval system. (1988). Hwang, Hark ; Lee, Moon-Kyu. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:4:p:285-294. Full description at Econpapers || Download paper | 8 |
25 | 1989 | Economic selection of a process level under acceptance sampling by variables. (1989). Carlsson, Olle. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:1:p:69-78. Full description at Econpapers || Download paper | 8 |
26 | 1991 | Investment justification in flexible manufacturing systems. (1991). Kakati, M. ; Dhar, U. R.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:3:p:203-209. Full description at Econpapers || Download paper | 7 |
27 | 1989 | Optimal and heuristic solutions for a simple common component inventory problem. (1989). Silver, Edward A. ; Jonsson, Henrik . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:4:p:257-267. Full description at Econpapers || Download paper | 7 |
28 | 1990 | Cross-national comparison of production--inventory management practices. (1990). Chikan, Attila ; Whybark, Clay D.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:149-156. Full description at Econpapers || Download paper | 6 |
29 | 1989 | The service parts control problem. (1989). Yamashina, H.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:3:p:195-208. Full description at Econpapers || Download paper | 6 |
30 | 1988 | Bottleneck generalized assignment problems. (1988). Neebe, A. W. ; Mazzola, J. B.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:14:y:1988:i:1:p:61-65. Full description at Econpapers || Download paper | 6 |
31 | 1990 | An eclectic algorithm for inventory replenishment for items with increasing linear trend in demand. (1990). Rand, Graham K. ; Amrani, Mostepha. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:261-266. Full description at Econpapers || Download paper | 6 |
32 | 1989 | Measuring logistics performance. (1989). Aronsson, Hakan ; Andersson, Par ; Storhagen, Nils G.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:253-262. Full description at Econpapers || Download paper | 6 |
33 | 1985 | Algorithmic grouping of operation sequences. (1985). Balasubramanian, K. N. ; Selvam, Panneer R.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:125-134. Full description at Econpapers || Download paper | 5 |
34 | 1988 | Improving storage and order picking in a person-on-board as/r system: A case study. (1988). van Oudheusden, Dirk L. ; Tzen, Ya-Juei J. ; Ko, Hwei-Tang. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:13:y:1988:i:4:p:273-283. Full description at Econpapers || Download paper | 5 |
35 | 1982 | Inventory grouping for joint replenishment. (1982). Chakravarty, Amiya K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:7:y:1982:i:1:p:19-24. Full description at Econpapers || Download paper | 5 |
36 | 1983 | Minimizing a quadratic function of job lateness on a single machine. (1983). Gupta, Sushil K. ; Sen, Tapan. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:7:y:1983:i:3:p:187-194. Full description at Econpapers || Download paper | 5 |
37 | 1990 | Inventory control in case of unknown demand distribution. (1990). Bulinskaya, E. V.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:301-306. Full description at Econpapers || Download paper | 5 |
38 | 1990 | Common cycle scheduling in a multistage production process. (1990). Hsu, John I. S., ; EI-Najdawi, M.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:1:p:73-80. Full description at Econpapers || Download paper | 5 |
39 | 1990 | Analysis of multi-item inventory systems under resource constraints: A non-linear goal programming approach. (1990). Padmanabhan, G. ; Vrat, Prem. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:20:y:1990:i:2:p:121-127. Full description at Econpapers || Download paper | 5 |
40 | 1988 | Production with optimum irrigation management under saline conditions. (1988). Dinar, Ariel ; Knapp, Keith C.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:14:y:1988:i:1:p:41-46. Full description at Econpapers || Download paper | 4 |
41 | 1986 | On improving replenishment policies for linear trend in demand. (1986). Goyal, S. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:73-76. Full description at Econpapers || Download paper | 4 |
42 | 1989 | The effect of discounting on inventory lot sizing models. (1989). Park, Chan S. ; Son, Young K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:16:y:1989:i:1:p:35-48. Full description at Econpapers || Download paper | 4 |
43 | 1984 | The state of the art of present worth analysis of cash flow distributions. (1984). Carson, Dean E. ; Ganiy, Saleem A. ; Tu, Jerome C. ; Remer, Donald S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:7:y:1984:i:4:p:257-278. Full description at Econpapers || Download paper | 4 |
44 | 1989 | Analysis of production lines with general service times and finite buffers: A two-node decomposition approach,. (1989). Ranjan, Raghav ; Altiok, Tayfur. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:17:y:1989:i:1-4:p:155-165. Full description at Econpapers || Download paper | 4 |
45 | 1990 | Assessing manufacturing system performance: Frequency response revisited. (1990). Towill, D. R. ; Edghill, J.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:319-326. Full description at Econpapers || Download paper | 4 |
46 | 1990 | Complexity of single model assembly line balancing problems. (1990). Sahu, S. ; Bhattacharjee, T. K.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1990:i:3:p:203-214. Full description at Econpapers || Download paper | 4 |
47 | 1982 | Some features common to inventory system and process controller design. (1982). Towill, D. R. ; Yoon, S. S.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:6:y:1982:i::p:225-236. Full description at Econpapers || Download paper | 4 |
48 | 1990 | Risk in inventory models: Review and implementation. (1990). Anvari, M. ; Kusy, M.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:267-272. Full description at Econpapers || Download paper | 4 |
49 | 1985 | A roi-maximizing eoq model under variable demand and markup rates. (1985). Arcelus, F. J. ; Srinivasan, G.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:113-117. Full description at Econpapers || Download paper | 4 |
50 | 1990 | Inventory management in the manufacturing sector in developing countries. (1990). Goonatilake, Lalith. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:19:y:1990:i:1-3:p:19-24. Full description at Econpapers || Download paper | 4 |
# | Year | Title | Cited |
---|---|---|---|
1 | 1986 | Scale economies and the 0.6 rule. (1986). Tribe, Michael ; Alpine, R. L. W., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:10:y:1986:i:1:p:271-278. Full description at Econpapers || Download paper | 7 |
2 | 1987 | Measuring the efficiency of service operations: An application to bank branches. (1987). Parkan, Celik ; Fiserman, Steve. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:12:y:1987:i:1-4:p:237-242. Full description at Econpapers || Download paper | 3 |
3 | 1991 | A review of research on AGVS vehicle management. (1991). Co, Christine G. ; Tanchoco, J. M. A., . In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:21:y:1991:i:1:p:35-42. Full description at Econpapers || Download paper | 2 |
4 | 1989 | Multiple projects -- Multiple resources constrained scheduling: A multiobjective analysis. (1989). Siddiq, M. K. ; Mohanty, R. P.. In: Engineering Costs and Production Economics. RePEc:eee:ecpeco:v:18:y:1989:i:1:p:83-92. Full description at Econpapers || Download paper | 2 |
Year | Title |
---|