[Raw
data] [50 most cited papers]
[50 most relevant papers]
[cites used to compute IF]
[Recent
citations ][Frequent citing
series ] [more data in
EconPapers]
[
trace new citations] [Missing
citations? Add them now]
[Incorrect content? Let us
know]
| IF | AIF | CIF | IF5 | DOC | CDO | CIT | NCI | CCU | D2Y | C2Y | D5Y | C5Y | SC | %SC | CiY | II | AII | |
| 2011 | 0 | 0.51 | 0 | 0 | 22 | 22 | 58 | 1 | 0 | 0 | 0 | 0 | 0.24 | |||||
| 2012 | 0.14 | 0.5 | 0.07 | 0.14 | 22 | 44 | 27 | 3 | 4 | 22 | 3 | 22 | 3 | 0 | 0 | 0.21 | ||
| 2013 | 0.07 | 0.54 | 0.04 | 0.07 | 23 | 67 | 55 | 3 | 7 | 44 | 3 | 44 | 3 | 0 | 0 | 0.24 | ||
| 2014 | 0.07 | 0.53 | 0.1 | 0.1 | 20 | 87 | 37 | 9 | 16 | 45 | 3 | 67 | 7 | 0 | 0 | 0.22 | ||
| 2015 | 0.26 | 0.53 | 0.21 | 0.21 | 21 | 108 | 23 | 23 | 39 | 43 | 11 | 87 | 18 | 0 | 0 | 0.22 | ||
| 2016 | 0.12 | 0.5 | 0.23 | 0.17 | 25 | 133 | 20 | 31 | 70 | 41 | 5 | 108 | 18 | 0 | 2 | 0.08 | 0.2 | |
| 2017 | 0.09 | 0.52 | 0.11 | 0.09 | 23 | 156 | 31 | 17 | 87 | 46 | 4 | 111 | 10 | 0 | 0 | 0.21 | ||
| 2018 | 0.1 | 0.53 | 0.19 | 0.15 | 21 | 177 | 21 | 34 | 121 | 48 | 5 | 112 | 17 | 0 | 2 | 0.1 | 0.22 | |
| 2019 | 0.14 | 0.54 | 0.1 | 0.12 | 22 | 199 | 16 | 20 | 141 | 44 | 6 | 110 | 13 | 0 | 0 | 0.21 | ||
| 2020 | 0.12 | 0.64 | 0.19 | 0.15 | 24 | 223 | 8 | 43 | 184 | 43 | 5 | 112 | 17 | 0 | 2 | 0.08 | 0.3 | |
| 2021 | 0.11 | 0.74 | 0.15 | 0.17 | 18 | 241 | 8 | 37 | 221 | 46 | 5 | 115 | 20 | 0 | 1 | 0.06 | 0.27 | |
| 2022 | 0.1 | 0.74 | 0.1 | 0.11 | 20 | 261 | 0 | 27 | 248 | 42 | 4 | 108 | 12 | 0 | 0 | 0.22 | ||
| 2023 | 0.05 | 0.7 | 0.1 | 0.09 | 16 | 277 | 1 | 29 | 277 | 38 | 2 | 105 | 9 | 0 | 0 | 0.2 | ||
| 2024 | 0.06 | 0.82 | 0.1 | 0.08 | 16 | 293 | 0 | 29 | 306 | 36 | 2 | 100 | 8 | 0 | 0 | 0.24 |
| IF: | Two years Impact Factor: C2Y / D2Y |
| AIF: | Average Impact Factor for all series in RePEc in year y |
| CIF: | Cumulative impact factor |
| IF5: | Five years Impact Factor: C5Y / D5Y |
| DOC: | Number of documents published in year y |
| CDO: | Cumulative number of documents published until year y |
| CIT: | Number of citations to papers published in year y |
| NCI: | Number of citations in year y |
| CCU: | Cumulative number of citations to papers published until year y |
| D2Y: | Number of articles published in y-1 plus y-2 |
| C2Y: | Cites in y to articles published in y-1 plus y-2 |
| D5Y: | Number of articles published in y-1 until y-5 |
| C5Y: | Cites in y to articles published in y-1 until y-5 |
| SC: | selft citations in y to articles published in y-1 plus y-2 |
| %SC: | Percentage of selft citations in y to articles published in y-1 plus y-2 |
| CiY: | Cites in year y to documents published in year y |
| II: | Immediacy Index: CiY / Documents. |
| AII: | Average Immediacy Index for series in RePEc in year y |
| # | Year | Title | Cited |
|---|---|---|---|
| 1 | 2013 | The Internal Rate of Return Approach and the AIRR Paradigm: A Refutation and a Corroboration. (2013). Magni, Carlo Alberto. In: The Engineering Economist. RePEc:taf:uteexx:v:58:y:2013:i:2:p:73-111. Full description at Econpapers || Download paper | 31 |
| 2 | 2011 | A Cost Function for the Natural Gas Transmission Industry: Further Considerations. (2011). MASSOL, Olivier. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:2:p:95-122. Full description at Econpapers || Download paper | 17 |
| 3 | 2014 | Equipment Replacement Analysis: A Literature Review and Directions for Future Research. (2014). Hartman, Joseph C ; Tan, Chin Hon. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:2:p:136-153. Full description at Econpapers || Download paper | 12 |
| 4 | 2011 | Defending Against a Stockpiling Terrorist. (2011). Zhuang, Jun ; Hausken, Kjell. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:4:p:321-353. Full description at Econpapers || Download paper | 11 |
| 5 | 2013 | Small Modular Infrastructure. (2013). Lackner, Klaus ; van Ryzin, Garrett ; Dahlgren, Eric ; Gomen, Caner. In: The Engineering Economist. RePEc:taf:uteexx:v:58:y:2013:i:4:p:231-264. Full description at Econpapers || Download paper | 9 |
| 6 | 2011 | Aggregate Return on Investment and Investment Decisions: A Cash-Flow Perspective. (2011). Magni, Carlo Alberto. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:2:p:140-169. Full description at Econpapers || Download paper | 8 |
| 7 | 2015 | Estimating Size and Scope Economies in the Portuguese Water Sector Using the Most Appropriate Functional Form. (2015). Marques, RC ; Carvalho, Pedro. In: The Engineering Economist. RePEc:taf:uteexx:v:60:y:2015:i:2:p:109-137. Full description at Econpapers || Download paper | 7 |
| 8 | 2015 | Oil and Gas Exploration Valuation and the Value of Waiting. (2015). Bratvold, Reidar Brumer ; Jafarizadeh, Babak. In: The Engineering Economist. RePEc:taf:uteexx:v:60:y:2015:i:4:p:245-262. Full description at Econpapers || Download paper | 7 |
| 9 | 2011 | Does the Weighted Average Cost of Capital Describe the Real-World Approach to the Discount Rate?. (2011). Block, Stanley. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:2:p:170-180. Full description at Econpapers || Download paper | 6 |
| 10 | 2014 | Mathematical Analysis of Average Rates of Return and Investment Decisions: The Missing Link. (2014). Magni, Carlo Alberto. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:3:p:175-206. Full description at Econpapers || Download paper | 6 |
| 11 | 2019 | The socioeconomic feasibility of greening rail stations: a case study in lisbon. (2019). Ferreira, Patricia Dinis ; Serro, Joana ; Teotonio, Ines ; Silva, Cristina Matos. In: The Engineering Economist. RePEc:taf:uteexx:v:64:y:2019:i:2:p:167-190. Full description at Econpapers || Download paper | 6 |
| 12 | 2017 | Economic impact analysis of inland waterway disruption response. (2017). Nachtmann, Heather ; Oztanriseven, Furkan. In: The Engineering Economist. RePEc:taf:uteexx:v:62:y:2017:i:1:p:73-89. Full description at Econpapers || Download paper | 5 |
| 13 | 2016 | Simulation-based costing for early phase life cycle cost analysis: Example application to an environmental remediation project. (2016). Larson, Steven L ; Farr, John V ; Faber, Isaac J ; Ganguly, Anirban ; Martin, Andy W. In: The Engineering Economist. RePEc:taf:uteexx:v:61:y:2016:i:3:p:207-222. Full description at Econpapers || Download paper | 5 |
| 14 | 2016 | Supply chain shared risk self-financing for incremental sales. (2016). Inman, Robert R. In: The Engineering Economist. RePEc:taf:uteexx:v:61:y:2016:i:1:p:23-43. Full description at Econpapers || Download paper | 5 |
| 15 | 2012 | An Exit and Entry Study of Renewable Power Producers: A Real Options Approach. (2012). Min, K ; Wang, Chung-Hsiao ; Lou, Chenlu. In: The Engineering Economist. RePEc:taf:uteexx:v:57:y:2012:i:1:p:55-75. Full description at Econpapers || Download paper | 5 |
| 16 | 2014 | Technical Note: Economic Rates of Return and Investment Analysis. (2014). Robison, Lindon ; Barry, Peter J. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:3:p:231-236. Full description at Econpapers || Download paper | 4 |
| 17 | 2018 | Comparative statics for real options on oil: What stylized facts?. (2018). Lund, Diderik ; Nymoen, Ragnar. In: The Engineering Economist. RePEc:taf:uteexx:v:63:y:2018:i:1:p:54-65. Full description at Econpapers || Download paper | 4 |
| 18 | 2015 | On Reliability Evaluation of Multistate Weighted -out-of- System Using Present Value. (2015). Ibrahim, Yousef M ; Gunawan, Indra ; Khorshidi, Hadi Akbarzade. In: The Engineering Economist. RePEc:taf:uteexx:v:60:y:2015:i:1:p:22-39. Full description at Econpapers || Download paper | 4 |
| 19 | 2018 | Cash flow at risk valuation of mining project using Monte Carlo simulations with stochastic processes calibrated on historical data. (2018). Kumral, Mustafa ; Sauvageau, Mathieu. In: The Engineering Economist. RePEc:taf:uteexx:v:63:y:2018:i:3:p:171-187. Full description at Econpapers || Download paper | 4 |
| 20 | 2014 | Capital Budgeting and Shareholdersâ Value: Investment Projects Versus Courses of Action. (2014). Bosch-Badia, Maria Teresa ; Tarrazon-Rodon, Maria Antonia ; Montllor-Serrats, Joan. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:3:p:207-230. Full description at Econpapers || Download paper | 4 |
| 21 | Prepurchase financing pool: Revealing the IRR problem. (2018). Kimura, Herbert ; Sobreiro, Vinicius Amorim ; Lima, Jessica. In: The Engineering Economist. RePEc:taf:uteexx:v:63:y:2018:i:2:p:158-170. Full description at Econpapers || Download paper | 4 | |
| 22 | 2011 | Dynamic Cash Management of Warranty Reserves. (2011). Gurgur, Cigdem. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:1:p:1-27. Full description at Econpapers || Download paper | 4 |
| 23 | 2017 | Analyzing operational real options in metal mining investments with a system dynamic model. (2017). Collan, Mikael ; Luukka, Pasi ; Savolainen, Jyrki. In: The Engineering Economist. RePEc:taf:uteexx:v:62:y:2017:i:1:p:54-72. Full description at Econpapers || Download paper | 4 |
| 24 | 2011 | Real Options Estimate Using Probabilistic Present Worth Analysis. (2011). Parasu, Praneeth ; Carmichael, David ; Hersh, Ariel. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:4:p:295-320. Full description at Econpapers || Download paper | 4 |
| 25 | 2012 | The Limited Relevance of the Multiple s. (2012). Kroll, Yoram ; Ben-Horin, Moshe. In: The Engineering Economist. RePEc:taf:uteexx:v:57:y:2012:i:2:p:101-118. Full description at Econpapers || Download paper | 4 |
| 26 | 2013 | Optimal Capital Structure and Financial Risk of Project Finance Investments: A Simulation Optimization Model With Chance Constraints. (2013). Duffey, Michael ; Donkor, Emmanuel. In: The Engineering Economist. RePEc:taf:uteexx:v:58:y:2013:i:1:p:19-34. Full description at Econpapers || Download paper | 4 |
| 27 | 2011 | Integrating Real Options with Managerial Cash Flow Estimates. (2011). Lawryshyn, Yuri ; Barton, Kelsey. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:3:p:254-273. Full description at Econpapers || Download paper | 4 |
| 28 | 2014 | Joint Optimization of Asset and Inventory Management in a ProductâService System. (2014). Wu, Xiang ; Ryan, Sarah M. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:2:p:91-115. Full description at Econpapers || Download paper | 4 |
| 29 | 2021 | Average internal rate of return for risky projects. (2021). Magni, Carlo Alberto ; Hazen, Gordon. In: The Engineering Economist. RePEc:taf:uteexx:v:66:y:2021:i:2:p:90-120. Full description at Econpapers || Download paper | 4 |
| 30 | 2018 | Evaluation method of benefits and efficiency of grid investment in China: A case study. (2018). He, Yongxiu ; Liu, Wenya ; Jiao, Jie ; Guan, Jie. In: The Engineering Economist. RePEc:taf:uteexx:v:63:y:2018:i:1:p:66-86. Full description at Econpapers || Download paper | 4 |
| 31 | 2012 | Technical Note: Simulating the Two-Factor Schwartz and Smith Model of Commodity Prices. (2012). Davis, Graham. In: The Engineering Economist. RePEc:taf:uteexx:v:57:y:2012:i:2:p:130-140. Full description at Econpapers || Download paper | 3 |
| 32 | 2014 | Using Analytic Hierarchy/Network Process (AHP/ANP) in Developing Countries: Shortcomings and Suggestions. (2014). Saedi, Ramin ; Khademi, Navid ; Behnia, Kambiz. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:1:p:2-29. Full description at Econpapers || Download paper | 3 |
| 33 | 2017 | Cost analysis of material handling systems in open pit mining: Case study on an iron ore prefeasibility study. (2017). Dunbrack, Tyrrell ; Kumral, Mustafa ; de Werk, Marco ; Ozdemir, Burak ; Ragoub, Bellal. In: The Engineering Economist. RePEc:taf:uteexx:v:62:y:2017:i:4:p:369-386. Full description at Econpapers || Download paper | 3 |
| 34 | 2017 | Evaluating the cost-effectiveness of an early detection of Parkinsons disease through innovative technology. (2017). Huang, Xuemei ; Kilinc, Mehmet Serdar ; Nembhard, Harriet B ; Muoz, David A ; Tucker, Conrad. In: The Engineering Economist. RePEc:taf:uteexx:v:62:y:2017:i:2:p:180-196. Full description at Econpapers || Download paper | 3 |
| 35 | 2012 | Capital Equipment Replacement Under Technological Change. (2012). Arai, Takeshi ; Mardin, Farid. In: The Engineering Economist. RePEc:taf:uteexx:v:57:y:2012:i:2:p:119-129. Full description at Econpapers || Download paper | 3 |
| 36 | 2016 | The IRR of a project with many potential outcomes. (2016). Danielson, Morris G. In: The Engineering Economist. RePEc:taf:uteexx:v:61:y:2016:i:1:p:44-56. Full description at Econpapers || Download paper | 3 |
| 37 | 2013 | Analyzing the Techno-Economic Determinants for the Repowering of Wind Farms. (2013). Rio, Pablo ; Gomez, Guillermo ; Silvosa, Anxo. In: The Engineering Economist. RePEc:taf:uteexx:v:58:y:2013:i:4:p:282-303. Full description at Econpapers || Download paper | 3 |
| 38 | 2017 | Integrating weather and spark spread options for valuing a natural gas-fired power plant with multiple turbines. (2017). Salam, Reaz-Us M ; M. I. M. Wahab, ; Fang, Liping. In: The Engineering Economist. RePEc:taf:uteexx:v:62:y:2017:i:4:p:293-321. Full description at Econpapers || Download paper | 3 |
| 39 | 2013 | Electric Power Plant Valuation Based on Day-Ahead Spark Spreads. (2013). Min, K ; Wang, Chung-Hsiao. In: The Engineering Economist. RePEc:taf:uteexx:v:58:y:2013:i:3:p:157-178. Full description at Econpapers || Download paper | 3 |
| 40 | 2016 | Case study: A conservative approach to green roof benefit quantification and valuation for public buildings. (2016). McRae, Alex M. In: The Engineering Economist. RePEc:taf:uteexx:v:61:y:2016:i:3:p:190-206. Full description at Econpapers || Download paper | 3 |
| 41 | 2019 | Multicriteria risk analysis of commodity-specific dock investments at an inland waterway port. (2019). Whitman, Mackenzie ; Barker, Kash ; Baroud, Hiba. In: The Engineering Economist. RePEc:taf:uteexx:v:64:y:2019:i:4:p:346-367. Full description at Econpapers || Download paper | 3 |
| 42 | 2014 | Adjusted Betas Under Reference-Day Risk. (2014). Stein, Roberto ; Gonzalez, Marcelo ; Rodriguez, Arturo. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:1:p:79-88. Full description at Econpapers || Download paper | 3 |
| 43 | 2017 | Optimizing capital investments under technological change and deterioration: A case study on MRI machine replacement. (2017). Byktahtakan, Esra A ; Des-Bordes, Emmanuel. In: The Engineering Economist. RePEc:taf:uteexx:v:62:y:2017:i:2:p:105-131. Full description at Econpapers || Download paper | 3 |
| 44 | 2012 | A Continuous-Time Examination of End-of-Life Parts Acquisition With Limited Customer Information. (2012). Lowe, Timothy ; Jones, Philip ; Leifker, Nicholas. In: The Engineering Economist. RePEc:taf:uteexx:v:57:y:2012:i:4:p:284-301. Full description at Econpapers || Download paper | 3 |
| 45 | 2017 | Evaluation of a mining project under the joint effect of commodity price and exchange rate uncertainties using real options valuation. (2017). Aminul, MD ; Topal, Erkan ; Lilford, Eric. In: The Engineering Economist. RePEc:taf:uteexx:v:62:y:2017:i:3:p:231-253. Full description at Econpapers || Download paper | 3 |
| 46 | 2012 | Case Study: Energy Industry Economic Impacts from Ohio River Transportation Disruption. (2012). Cooper, Martha ; Guler, Alar ; Johnson, Alan. In: The Engineering Economist. RePEc:taf:uteexx:v:57:y:2012:i:2:p:77-100. Full description at Econpapers || Download paper | 3 |
| 47 | 2015 | Multiple Internal Rate of Return Revisited: Frequency of Occurrences. (2015). Beruvides, Mario G ; Ng, Ean-Harn. In: The Engineering Economist. RePEc:taf:uteexx:v:60:y:2015:i:1:p:75-87. Full description at Econpapers || Download paper | 3 |
| 48 | 2011 | Harnessing Product Complexity: Step 1âEstablishing Product Complexity Dimensions and Indicators. (2011). Orfi, Nihal ; Terpenny, Janis ; Sahin-Sariisik, Asli. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:1:p:59-79. Full description at Econpapers || Download paper | 3 |
| 49 | 2021 | Socioeconomic feasibility of green roofs and walls in public buildings: The case study of primary schools in Portugal. (2021). Teotonio, Ines ; Silva, Cristina Matos ; Almeida, Catarina ; Cruz, Carlos Oliveira. In: The Engineering Economist. RePEc:taf:uteexx:v:66:y:2021:i:1:p:27-50. Full description at Econpapers || Download paper | 3 |
| 50 | 2012 | Minimax Expected Opportunity Loss: A New Criterion for Risk-Based Decision Making. (2012). Tung, Yeou-Koung ; Su, Hsin-Ting. In: The Engineering Economist. RePEc:taf:uteexx:v:57:y:2012:i:4:p:247-273. Full description at Econpapers || Download paper | 2 |
| # | Year | Title | Cited |
|---|---|---|---|
| 1 | 2013 | The Internal Rate of Return Approach and the AIRR Paradigm: A Refutation and a Corroboration. (2013). Magni, Carlo Alberto. In: The Engineering Economist. RePEc:taf:uteexx:v:58:y:2013:i:2:p:73-111. Full description at Econpapers || Download paper | 5 |
| 2 | 2011 | A Cost Function for the Natural Gas Transmission Industry: Further Considerations. (2011). MASSOL, Olivier. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:2:p:95-122. Full description at Econpapers || Download paper | 5 |
| 3 | 2015 | Oil and Gas Exploration Valuation and the Value of Waiting. (2015). Bratvold, Reidar Brumer ; Jafarizadeh, Babak. In: The Engineering Economist. RePEc:taf:uteexx:v:60:y:2015:i:4:p:245-262. Full description at Econpapers || Download paper | 5 |
| 4 | 2021 | Average internal rate of return for risky projects. (2021). Magni, Carlo Alberto ; Hazen, Gordon. In: The Engineering Economist. RePEc:taf:uteexx:v:66:y:2021:i:2:p:90-120. Full description at Econpapers || Download paper | 4 |
| 5 | 2019 | The socioeconomic feasibility of greening rail stations: a case study in lisbon. (2019). Ferreira, Patricia Dinis ; Serro, Joana ; Teotonio, Ines ; Silva, Cristina Matos. In: The Engineering Economist. RePEc:taf:uteexx:v:64:y:2019:i:2:p:167-190. Full description at Econpapers || Download paper | 3 |
| 6 | 2011 | Defending Against a Stockpiling Terrorist. (2011). Zhuang, Jun ; Hausken, Kjell. In: The Engineering Economist. RePEc:taf:uteexx:v:56:y:2011:i:4:p:321-353. Full description at Econpapers || Download paper | 3 |
| 7 | 2014 | Mathematical Analysis of Average Rates of Return and Investment Decisions: The Missing Link. (2014). Magni, Carlo Alberto. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:3:p:175-206. Full description at Econpapers || Download paper | 2 |
| 8 | 2013 | Optimal Capital Structure and Financial Risk of Project Finance Investments: A Simulation Optimization Model With Chance Constraints. (2013). Duffey, Michael ; Donkor, Emmanuel. In: The Engineering Economist. RePEc:taf:uteexx:v:58:y:2013:i:1:p:19-34. Full description at Econpapers || Download paper | 2 |
| 9 | 2014 | Using Analytic Hierarchy/Network Process (AHP/ANP) in Developing Countries: Shortcomings and Suggestions. (2014). Saedi, Ramin ; Khademi, Navid ; Behnia, Kambiz. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:1:p:2-29. Full description at Econpapers || Download paper | 2 |
| 10 | 2019 | Multicriteria risk analysis of commodity-specific dock investments at an inland waterway port. (2019). Whitman, Mackenzie ; Barker, Kash ; Baroud, Hiba. In: The Engineering Economist. RePEc:taf:uteexx:v:64:y:2019:i:4:p:346-367. Full description at Econpapers || Download paper | 2 |
| 11 | 2015 | Estimating Size and Scope Economies in the Portuguese Water Sector Using the Most Appropriate Functional Form. (2015). Marques, RC ; Carvalho, Pedro. In: The Engineering Economist. RePEc:taf:uteexx:v:60:y:2015:i:2:p:109-137. Full description at Econpapers || Download paper | 2 |
| 12 | 2014 | Equipment Replacement Analysis: A Literature Review and Directions for Future Research. (2014). Hartman, Joseph C ; Tan, Chin Hon. In: The Engineering Economist. RePEc:taf:uteexx:v:59:y:2014:i:2:p:136-153. Full description at Econpapers || Download paper | 2 |
| 13 | 2018 | Evaluation method of benefits and efficiency of grid investment in China: A case study. (2018). He, Yongxiu ; Liu, Wenya ; Jiao, Jie ; Guan, Jie. In: The Engineering Economist. RePEc:taf:uteexx:v:63:y:2018:i:1:p:66-86. Full description at Econpapers || Download paper | 2 |
| 14 | 2021 | Socioeconomic feasibility of green roofs and walls in public buildings: The case study of primary schools in Portugal. (2021). Teotonio, Ines ; Silva, Cristina Matos ; Almeida, Catarina ; Cruz, Carlos Oliveira. In: The Engineering Economist. RePEc:taf:uteexx:v:66:y:2021:i:1:p:27-50. Full description at Econpapers || Download paper | 2 |
| 15 | 2018 | Partitioning transaction vectors into pure investments. (2018). Cuthbert, James Rutherford. In: The Engineering Economist. RePEc:taf:uteexx:v:63:y:2018:i:2:p:143-152. Full description at Econpapers || Download paper | 2 |
| Year | Title | |
|---|---|---|
| 2024 | Agricultural commodities market reaction to COVID-19. (2024). Iuga, Iulia ; Mudakkar, Syeda Rabab ; Dragolea, Larisa Loredana. In: Research in International Business and Finance. RePEc:eee:riibaf:v:69:y:2024:i:c:s0275531924000801. Full description at Econpapers || Download paper | |
| 2024 | Economic benefit analysis of lithium battery recycling based on machine learning algorithm. (2024). Zhang, Jie. In: PLOS ONE. RePEc:plo:pone00:0303933. Full description at Econpapers || Download paper |
| Year | Citing document |
|---|
| Year | Citing document | |
|---|---|---|
| 2021 | Economic profitability and (non)additivity of residual income. (2021). Magni, Carlo Alberto. In: Annals of Finance. RePEc:kap:annfin:v:17:y:2021:i:4:d:10.1007_s10436-021-00388-2. Full description at Econpapers || Download paper |