Dar-Li Yang : Citation Profile


Are you Dar-Li Yang?

7

H index

6

i10 index

137

Citations

RESEARCH PRODUCTION:

17

Articles

RESEARCH ACTIVITY:

   13 years (2006 - 2019). See details.
   Cites by year: 10
   Journals where Dar-Li Yang has often published
   Relations with other researchers
   Recent citing documents: 7.    Total self citations: 5 (3.52 %)

MORE DETAILS IN:
ABOUT THIS REPORT:

   Permalink: http://citec.repec.org/pya320
   Updated: 2024-12-03    RAS profile: 2020-06-20    
   Missing citations? Add them    Incorrect content? Let us know

Relations with other researchers


Works with:

Authors registered in RePEc who have co-authored more than one work in the last five years with Dar-Li Yang.

Is cited by:

Sethi, Suresh (1)

alizadeh, reza (1)

Cites to:

Womer, Norman (5)

Sethi, Suresh (1)

Wu, Chin-Chia (1)

Main data


Where Dar-Li Yang has published?


Journals with more than one article published# docs
Journal of the Operational Research Society7
European Journal of Operational Research2
International Journal of Production Economics2
Omega2

Recent works citing Dar-Li Yang (2024 and 2023)


YearTitle of citing document
2023An asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problem. (2023). Neufeld, Janis S ; Gao, Liang ; Pan, Quan-Ke ; He, Xuan. In: European Journal of Operational Research. RePEc:eee:ejores:v:310:y:2023:i:2:p:597-610.

Full description at Econpapers || Download paper

2023Single-machine scheduling with product category-based learning and forgetting effects. (2023). Tauer, Bjorn ; Heuser, Patricia. In: Omega. RePEc:eee:jomega:v:115:y:2023:i:c:s0305048322001931.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

2023A bi-objective re-entrant permutation flow shop scheduling problem: minimizing the makespan and maximum tardiness. (2023). Jolai, Fariborz ; Tavakkoli-Moghaddam, Reza ; Fasihi, Maedeh. In: Operational Research. RePEc:spr:operea:v:23:y:2023:i:2:d:10.1007_s12351-023-00770-0.

Full description at Econpapers || Download paper

Works by Dar-Li Yang:


YearTitleTypeCited
2006Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect In: European Journal of Operational Research.
[Full Text][Citation analysis]
article33
2008Multi-family scheduling in a two-machine reentrant flow shop with setups In: European Journal of Operational Research.
[Full Text][Citation analysis]
article7
2010Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities In: Omega.
[Full Text][Citation analysis]
article20
2015Single machine total completion time scheduling problem with workload-dependent maintenance duration In: Omega.
[Full Text][Citation analysis]
article9
2012Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity In: International Journal of Production Economics.
[Full Text][Citation analysis]
article20
2014Scheduling problems with multiple due windows assignment and controllable processing times on a single machine In: International Journal of Production Economics.
[Full Text][Citation analysis]
article11
2019Minimizing Makespan in A Two-Machine Flowshop Problem with Processing Time Linearly Dependent on Job Waiting Time In: Sustainability.
[Full Text][Citation analysis]
article1
2007Single-machine scheduling with an actual time-dependent learning effect In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article10
2008Reply to Chung-Lun Li In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article0
2008Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article10
2008A note on due-date assignment and single-machine scheduling with deteriorating jobs In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article0
2009A note on unrelated parallel machine scheduling with time-dependent processing times In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article3
2010Single-machine scheduling with a sum-of-actual-processing-time-based learning effect In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article0
2012Single-machine scheduling problems with past-sequence-dependent delivery times and position-dependent processing times In: Journal of the Operational Research Society.
[Full Text][Citation analysis]
article2
2009Single-machine scheduling with both deterioration and learning effects In: Annals of Operations Research.
[Full Text][Citation analysis]
article7
2011Single-machine scheduling with deteriorating jobs In: International Journal of Systems Science.
[Full Text][Citation analysis]
article4
2009A TWO-STAGE FLOWSHOP SCHEDULING WITH LIMITED BUFFER STORAGE In: Asia-Pacific Journal of Operational Research (APJOR).
[Full Text][Citation analysis]
article0

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated November, 3 2024. Contact: CitEc Team