Is this page useful for you? Then, help us to keep the service working. Please have a look to our donations page ... Thanks for your help!!

European Journal of Industrial Engineering / Inderscience Enterprises Ltd


0.05

Impact Factor

0.06

5-Years IF

4

5-Years H index

Main indicators


Raw data


IF AIF IF5 DOC CDO CCU CIF CIT D2Y C2Y D5Y C5Y %SC CiY II AII
19900.1000 (%)0.04
19910.09000 (%)0.04
19920.1000 (%)0.04
19930.11000 (%)0.05
19940.12000 (%)0.05
19950.19000 (%)0.07
19960.22000 (%)0.09
19970.27000 (%)0.09
19980.27000 (%)0.1
19990.31000 (%)0.13
20000.4000 (%)0.15
20010.4000 (%)0.15
20020.42000 (%)0.18
20030.44000 (%)0.18
20040.49000 (%)0.2
20050.53000 (%)0.21
20060.51000 (%)0.2
20070.4424241000 (%)0.18
20080.4724481924242 (10.5%)0.2
20090.040.470.04237120.03144824822 (14.3%)0.19
20100.060.440.06239440.04114737142 (18.2%)0.16
20110.040.510.052411870.066462945 (%)10.040.2
20120.090.560.1136154150.110474118131 (10%)0.21
20130.030.660.053018490.051060213062 (20%)10.030.23
20140.060.670.0529213130.0656641367 (%)0.22
20150.050.820.0630243220.09459314291 (25%)0.27
IF: Impact Factor: C2Y / D2Y
AIF: Average Impact Factor for series in RePEc in year y
IF5: Impact Factor: C5Y / D5Y
DOC: Number of documents published in year y
CDO: Cumulative number of documents published until year y
CCU: Cumulative number of citations to papers published until year y
CIF: Cumulative impact factor
CIT: Number of citations to papers published in year y
D2Y: Number of articles published in y-1 plus y-2
C2Y: Cites in y to articles published in y-1 plus y-2
D5Y: Number of articles published in y-1 until y-5
C5Y: Cites in y to articles published in y-1 until y-5
%SC: Percentage of selft citations in y to articles published in y-1 plus y-2
CiY: Cites in year y to documents published in year y
II: Immediacy Index: CiY / Documents.
AII: Average Immediacy Index for series in RePEc in year y

 

50 most cited documents in this series:


#YearTitleCited
12008The splittable pickup and delivery problem with reloads. (2008). Quilliot, A. ; Lacroix, M. ; H. L. M. Kerivin, ; Mahjoub, A. R.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:2:y:2008:i:2:p:112-133.

Full description at Econpapers || Download paper

5
22008Operating theatre scheduling using Lagrangian relaxation. (2008). Augusto, V. ; Xie, X. ; Perdomo, V.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:2:y:2008:i:2:p:172-189.

Full description at Econpapers || Download paper

4
32013Retailers optimal order and credit policies when a supplier offers either a cash discount or a delay payment linked to order quantity. (2013). Yang, Chih-Te ; Pan, Qinhua ; Ouyang, Liang-Yuh ; Teng, Jinn-Tsair . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:3:p:370-392.

Full description at Econpapers || Download paper

4
42009On price increases and temporary price reductions with partial backordering. (2009). Sharma, Sanjay . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:3:y:2009:i:1:p:70-89.

Full description at Econpapers || Download paper

4
52008On the choice of a demand distribution for inventory management models. (2008). Janssens, Gerrit K. ; Ramaekers, Katrien . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:2:y:2008:i:4:p:479-491.

Full description at Econpapers || Download paper

3
62009Long-term electricity demand forecasting for power system planning using economic, demographic and climatic variables. (2009). Elkamel, A. ; Surit, R. ; Douglas, P. L. ; Chui, F. ; Croiset, E. ; El Kamel, A.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:3:y:2009:i:3:p:277-304.

Full description at Econpapers || Download paper

3
72008A novel differential evolution algorithm for no-idle permutation flow-shop scheduling problems. (2008). Wang, Ling ; Pan, Quan-Ke . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:2:y:2008:i:3:p:279-297.

Full description at Econpapers || Download paper

3
82010Quantifying barriers to implementing Total Quality Management (TQM). (2010). Attri, Rajesh ; Raj, Tilak . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:4:y:2010:i:3:p:308-335.

Full description at Econpapers || Download paper

2
92014Stochastic bicriteria single machine scheduling with sequence-dependent job attributes and job-dependent learning effects. (2014). Soroush, H. M.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:8:y:2014:i:4:p:421-456.

Full description at Econpapers || Download paper

2
102009EOQ extensions exploiting the Lambert W function. (2009). Roger D. H. Warburton, . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:3:y:2009:i:1:p:45-69.

Full description at Econpapers || Download paper

2
112010Utility function-based patient prioritisation in the emergency department. (2010). Claudio, David ; Okudan, Gul E.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:4:y:2010:i:1:p:59-77.

Full description at Econpapers || Download paper

2
122015Contracting under asymmetric customer returns information and market valuation with advertising-dependent demand. (2015). Huang, Song ; Yang, Jun . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:9:y:2015:i:4:p:538-560.

Full description at Econpapers || Download paper

2
132014Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems. (2014). Salmasi, Nasser ; Keshavarz, Taha . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:8:y:2014:i:3:p:366-387.

Full description at Econpapers || Download paper

2
142010A win-win collaboration approach for a two-echelon supply chain: a case study in the pulp and paper industry. (2010). Langevin, Andre ; D'Amours, Sophie ; Lehoux, Nadia . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:4:y:2010:i:4:p:493-514.

Full description at Econpapers || Download paper

2
152009Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms. (2009). Velez-Gallego, Mario C. ; Damodaran, Purushothaman ; Hirani, Neal S.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:3:y:2009:i:2:p:187-206.

Full description at Econpapers || Download paper

2
162013Single-machine group scheduling with a general learning effect. (2013). Wu, Chin-Chia ; Yin, Yunqiang ; Chen, Juei-Chao . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:3:p:350-369.

Full description at Econpapers || Download paper

2
172007Quantification of risk mitigation environment of supply chains using graph theory and matrix methods. (2007). Banwet, D. K. ; Shankar, Ravi ; Faisal, Mohd Nishat . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:1:y:2007:i:1:p:22-39.

Full description at Econpapers || Download paper

2
182012Permutation flowshops in group scheduling with sequence-dependent setup times. (2012). Naderi, B. ; Salmasi, Nasser . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:6:y:2012:i:2:p:177-198.

Full description at Econpapers || Download paper

2
192013An environment-driven, function-based approach to dynamic single-machine scheduling. (2013). Atighehchian, Arezoo ; Sepehri, Mohammad Mehdi . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:1:p:100-118.

Full description at Econpapers || Download paper

2
202013Economic order quantity for a power demand pattern system with deteriorating items. (2013). Febles-Acosta, Jaime ; la Rosa, Manuel Gonzlez-De ; Sicilia, Joaqun . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:5:p:577-593.

Full description at Econpapers || Download paper

2
212007Order oriented slotting: a new assignment strategy for warehouses. (2007). Schuur, Peter C. ; Heragu, Sunderesh S. ; Mantel, Ronald J.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:1:y:2007:i:3:p:301-316.

Full description at Econpapers || Download paper

2
222013Development of lower bounds for the scheduling of setup tasks in serial production lines. (2013). Pessan, Cdric ; Haouari, Mohamed ; Nron, Emmanuel . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:5:p:558-576.

Full description at Econpapers || Download paper

2
232007Controlling bullwhip and inventory variability with the golden smoothing rule. (2007). Towill, Denis R. ; Van De Velde, Wim ; Disney, Stephen M. ; Lambrecht, Marc R. ; Farasyn, Ingrid . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:1:y:2007:i:3:p:241-265.

Full description at Econpapers || Download paper

2
242011An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server. (2011). Samarghandi, Hamed ; ElMekkawy, Tarek Y.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:5:y:2011:i:2:p:111-131.

Full description at Econpapers || Download paper

2
252009Restricted job completion time variance minimisation on identical parallel machines. (2009). Sawhney, Rapinder ; Chen, Yuerong ; Li, Xueping . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:3:y:2009:i:3:p:261-276.

Full description at Econpapers || Download paper

1
262013Minimising maximum lateness in a single machine scheduling problem with processing time-based aging effects. (2013). Rudek, Radosaw . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:2:p:206-223.

Full description at Econpapers || Download paper

1
272016A simulation framework for studying blocking effects in warehouse systems with autonomous vehicles. (2016). Roy, Debjit ; Malmborg, Charles J ; Heragu, Sunderesh S ; Krishnamurthy, Ananth . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:10:y:2016:i:1:p:51-80.

Full description at Econpapers || Download paper

1
282007Heuristics for the single machine scheduling problem with early and quadratic tardy penalties. (2007). JORGE M. S. VALENTE, ; Jorge M. S. Valente, . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:1:y:2007:i:4:p:431-448.

Full description at Econpapers || Download paper

1
292012Optimal ordering policy in response to a temporary sale price when retailers warehouse capacity is limited. (2012). Yang, Chih-Te ; Ouyang, Liang-Yuh ; Wu, Kun-Shan ; Yen, Hsiu-Feng . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:6:y:2012:i:1:p:26-49.

Full description at Econpapers || Download paper

1
302012Heuristics for the response time variability problem. (2012). Pastor, Rafael ; Kubiak, Wieslaw . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:6:y:2012:i:6:p:751-764.

Full description at Econpapers || Download paper

1
312013The effect of inspection error on quality and producer losses: the case of nominal-the-best type quality characteristic and rework. (2013). Batmaz, anci ; Dolgun, Leman Esra ; Kksal, Glser ; Taeli, Aysun . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:4:p:497-528.

Full description at Econpapers || Download paper

1
322007Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups. (2007). Ram, Bala ; Yu, Xuefeng ; Jiang, Xiaochun. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:1:y:2007:i:2:p:182-199.

Full description at Econpapers || Download paper

1
332011Cell formation using a simulated annealing algorithm with variable neighbourhood. (2011). Lu, Chung-Cheng ; Lin, Shih-Wei ; Ying, Kuo-Ching . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:5:y:2011:i:1:p:22-42.

Full description at Econpapers || Download paper

1
342012The pipeline and valve location problem. (2012). Laporte, Gilbert ; Marta M. B. Pascoal, . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:6:y:2012:i:3:p:301-321.

Full description at Econpapers || Download paper

1
352009Optimal lot sizing for deteriorating items with triangle-shaped demand and uncertain lead time. (2009). Teng, Hui-Ming ; Hsu, Ping-Hui ; Wee, Hui-Ming . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:3:y:2009:i:3:p:247-260.

Full description at Econpapers || Download paper

1
362013Investment timing for a dual channel supply chain. (2013). Yao, Tao ; Moon, Yongma . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:2:p:148-174.

Full description at Econpapers || Download paper

1
372010Preventive replacement models: an overview and their application in process industries. (2010). Das, A. N. ; Sarmah, S. P.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:4:y:2010:i:3:p:280-307.

Full description at Econpapers || Download paper

1
382007Operator staffing and scheduling for an IT-help call centre. (2007). Alfares, Hesham K.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:1:y:2007:i:4:p:414-430.

Full description at Econpapers || Download paper

1
392011A hybrid CP/MILP method for scheduling with energy costs. (2011). Hat, Alain ; Artigues, Christian . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:5:y:2011:i:4:p:471-489.

Full description at Econpapers || Download paper

1
402012Disruptions in the airline industry: math-heuristics for re-assigning aircraft and passengers simultaneously. (2012). Wilbaut, Christophe ; Hanafi, Sad ; Mansi, Rad ; Clautiaux, Franois . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:6:y:2012:i:6:p:690-712.

Full description at Econpapers || Download paper

1
412010Monte Carlo simulation methods for dynamic line layout problems with nonlinear movement costs. (2010). Malmborg, Charles J. ; Wai Kin Victor Chan, ; Wai Kin Victor Chan, . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:4:y:2010:i:1:p:40-58.

Full description at Econpapers || Download paper

1
422007The effective variance control chart for monitoring the dispersion process with missing data. (2007). Garcia-Diaz, Carlos J.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:1:y:2007:i:1:p:40-55.

Full description at Econpapers || Download paper

1
432015Scheduling with job-dependent past-sequence-dependent setup times and job-dependent position-based learning effects on a single processor. (2015). Soroush, H. M.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:9:y:2015:i:3:p:277-307.

Full description at Econpapers || Download paper

1
442012Minimising makespan for multistage hybrid flowshop scheduling problems with multiprocessor tasks by a hybrid immune algorithm. (2012). Ying, Kuo-Ching . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:6:y:2012:i:2:p:199-215.

Full description at Econpapers || Download paper

1
452013An optimisation design of the combined np-CUSUM scheme for attributes. (2013). Yu, Fong-Jung ; Wu, Zhang ; Haridy, Salah ; Shamsuzzaman, Mohammad . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:1:p:16-37.

Full description at Econpapers || Download paper

1
462010Scheduling multiprocessor tasks to minimise the makespan on two dedicated processors. (2010). Manaa, Adel ; Chu, Chengbin . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:4:y:2010:i:3:p:265-279.

Full description at Econpapers || Download paper

1
472014A stochastic profit-maximising economic lot scheduling problem with price optimisation. (2014). Crdenas-Barrn, Leopoldo Eduardo ; Smith, Neale R. ; Salvietti, Luciano. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:8:y:2014:i:2:p:193-221.

Full description at Econpapers || Download paper

1
482007Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times. (2007). Wang, Gary G. ; ElMekkawy, Tarek Y. ; Hendizadeh, Hamed S.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:1:y:2007:i:4:p:391-413.

Full description at Econpapers || Download paper

1
492011Multiproduct EPQ model with single machine, backordering and immediate rework process. (2011). Taleizadeh, Ata Allah ; Seyed Taghi Akhavan Niaki, ; Sadjadi, Seyed Jafar . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:5:y:2011:i:4:p:388-411.

Full description at Econpapers || Download paper

1
502008Multi-item, economic order quantity model with permissible delay in payments and a budget constraint. (2008). Chandrasekhar, Ashok ; Mohan, Srimathy . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:2:y:2008:i:4:p:446-460.

Full description at Econpapers || Download paper

1

50 most relevant documents in this series (papers most cited in the last two years)


#YearTitleCited
12008The splittable pickup and delivery problem with reloads. (2008). Quilliot, A. ; Lacroix, M. ; H. L. M. Kerivin, ; Mahjoub, A. R.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:2:y:2008:i:2:p:112-133.

Full description at Econpapers || Download paper

4
22013Retailers optimal order and credit policies when a supplier offers either a cash discount or a delay payment linked to order quantity. (2013). Yang, Chih-Te ; Pan, Qinhua ; Ouyang, Liang-Yuh ; Teng, Jinn-Tsair . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:3:p:370-392.

Full description at Econpapers || Download paper

4
32008Operating theatre scheduling using Lagrangian relaxation. (2008). Augusto, V. ; Xie, X. ; Perdomo, V.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:2:y:2008:i:2:p:172-189.

Full description at Econpapers || Download paper

3
42013Economic order quantity for a power demand pattern system with deteriorating items. (2013). Febles-Acosta, Jaime ; la Rosa, Manuel Gonzlez-De ; Sicilia, Joaqun . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:5:p:577-593.

Full description at Econpapers || Download paper

2
52012Permutation flowshops in group scheduling with sequence-dependent setup times. (2012). Naderi, B. ; Salmasi, Nasser . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:6:y:2012:i:2:p:177-198.

Full description at Econpapers || Download paper

2
62014Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems. (2014). Salmasi, Nasser ; Keshavarz, Taha . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:8:y:2014:i:3:p:366-387.

Full description at Econpapers || Download paper

2
72010Utility function-based patient prioritisation in the emergency department. (2010). Claudio, David ; Okudan, Gul E.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:4:y:2010:i:1:p:59-77.

Full description at Econpapers || Download paper

2
82015Contracting under asymmetric customer returns information and market valuation with advertising-dependent demand. (2015). Huang, Song ; Yang, Jun . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:9:y:2015:i:4:p:538-560.

Full description at Econpapers || Download paper

2
92010Quantifying barriers to implementing Total Quality Management (TQM). (2010). Attri, Rajesh ; Raj, Tilak . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:4:y:2010:i:3:p:308-335.

Full description at Econpapers || Download paper

2
102013Development of lower bounds for the scheduling of setup tasks in serial production lines. (2013). Pessan, Cdric ; Haouari, Mohamed ; Nron, Emmanuel . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:5:p:558-576.

Full description at Econpapers || Download paper

2
112014Stochastic bicriteria single machine scheduling with sequence-dependent job attributes and job-dependent learning effects. (2014). Soroush, H. M.. In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:8:y:2014:i:4:p:421-456.

Full description at Econpapers || Download paper

2
122013An environment-driven, function-based approach to dynamic single-machine scheduling. (2013). Atighehchian, Arezoo ; Sepehri, Mohammad Mehdi . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:1:p:100-118.

Full description at Econpapers || Download paper

2
132013Single-machine group scheduling with a general learning effect. (2013). Wu, Chin-Chia ; Yin, Yunqiang ; Chen, Juei-Chao . In: European Journal of Industrial Engineering. RePEc:ids:eujine:v:7:y:2013:i:3:p:350-369.

Full description at Econpapers || Download paper

2

Citing documents used to compute impact factor 3:


YearTitle
2015The third comprehensive survey on scheduling problems with setup times/costs. (2015). Allahverdi, Ali . In: European Journal of Operational Research. RePEc:eee:ejores:v:246:y:2015:i:2:p:345-378.

Full description at Econpapers || Download paper

2015The third comprehensive survey on scheduling problems with setup times/costs. (2015). Allahverdi, Ali . In: European Journal of Operational Research. RePEc:eee:ejores:v:246:y:2015:i:2:p:345-378.

Full description at Econpapers || Download paper

2015A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment. (2015). Zia, Nadia Pourmohammad ; Taleizadeh, Ata Allah . In: Transportation Research Part E: Logistics and Transportation Review. RePEc:eee:transe:v:82:y:2015:i:c:p:19-37.

Full description at Econpapers || Download paper

Recent citations (cites in year: CiY)


Recent citations received in 2015

YearCiting document

Recent citations received in 2014

YearCiting document

Recent citations received in 2013

YearCiting document
2013Optimal average sample number of the SPRT chart for monitoring fraction nonconforming. (2013). Lee, Ka Man ; Wu, Zhang ; Haridy, Salah ; Bhuiyan, Nadia . In: European Journal of Operational Research. RePEc:eee:ejores:v:229:y:2013:i:2:p:411-421.

Full description at Econpapers || Download paper

Recent citations received in 2012

YearCiting document

Warning!! This is still an experimental service. The results of this service should be interpreted with care, especially in research assessment exercises. The processing of documents is automatic. There still are errors and omissions in the identification of references. We are working to improve the software to increase the accuracy of the results.

Source data used to compute the impact factor of RePEc series.

CitEc is a RePEc service, providing citation data for Economics since 2001. Sponsored by INOMICS. Last updated December, 1 2016. Contact: CitEc Team