[Raw data] [50 most cited papers] [50 most relevant papers] [cites used to compute IF] [Recent citations ][Frequent citing series ] [more data in EconPapers] [trace new citations] [Missing citations? Add them now] [Incorrect content? Let us know]
IF | AIF | CIF | IF5 | DOC | CDO | CIT | NCI | CCU | D2Y | C2Y | D5Y | C5Y | SC | %SC | CiY | II | AII | |
2016 | 0 | 0.53 | 0.08 | 0 | 24 | 24 | 94 | 2 | 2 | 0 | 0 | 0 | 2 | 0.08 | 0.21 | |||
2017 | 0.79 | 0.55 | 0.28 | 0.79 | 45 | 69 | 107 | 19 | 21 | 24 | 19 | 24 | 19 | 0 | 0 | 0.21 | ||
2018 | 0.39 | 0.57 | 0.25 | 0.39 | 46 | 115 | 59 | 29 | 50 | 69 | 27 | 69 | 27 | 5 | 17.2 | 2 | 0.04 | 0.24 |
2019 | 0.48 | 0.6 | 0.38 | 0.48 | 46 | 161 | 55 | 60 | 111 | 91 | 44 | 115 | 55 | 7 | 11.7 | 2 | 0.04 | 0.24 |
2020 | 0.21 | 0.73 | 0.37 | 0.37 | 47 | 208 | 40 | 77 | 188 | 92 | 19 | 161 | 59 | 19 | 24.7 | 9 | 0.19 | 0.34 |
2021 | 0.33 | 1.02 | 0.36 | 0.33 | 41 | 249 | 7 | 90 | 278 | 93 | 31 | 208 | 68 | 24 | 26.7 | 4 | 0.1 | 0.38 |
IF: | Two years Impact Factor: C2Y / D2Y |
AIF: | Average Impact Factor for all series in RePEc in year y |
CIF: | Cumulative impact factor |
IF5: | Five years Impact Factor: C5Y / D5Y |
DOC: | Number of documents published in year y |
CDO: | Cumulative number of documents published until year y |
CIT: | Number of citations to papers published in year y |
NCI: | Number of citations in year y |
CCU: | Cumulative number of citations to papers published until year y |
D2Y: | Number of articles published in y-1 plus y-2 |
C2Y: | Cites in y to articles published in y-1 plus y-2 |
D5Y: | Number of articles published in y-1 until y-5 |
C5Y: | Cites in y to articles published in y-1 until y-5 |
SC: | selft citations in y to articles published in y-1 plus y-2 |
%SC: | Percentage of selft citations in y to articles published in y-1 plus y-2 |
CiY: | Cites in year y to documents published in year y |
II: | Immediacy Index: CiY / Documents. |
AII: | Average Immediacy Index for series in RePEc in year y |
# | Year | Title | Cited |
---|---|---|---|
1 | 2016 | Scheduling operating rooms: achievements, challenges and pitfalls. (2016). Cardoen, Brecht ; Rademakers, Frank E ; Vansteenkiste, Nancy ; Demeulemeester, Erik ; van Riet, Carla ; Samudra, Michael . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:5:d:10.1007_s10951-016-0489-6. Full description at Econpapers || Download paper | 37 |
2 | 2016 | Scheduling for electricity cost in a smart grid. (2016). , Prudence ; Hon, Wing-Kai ; Liu, Hsiang-Hsuan ; David, ; Burcea, Mihai . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0447-8. Full description at Econpapers || Download paper | 22 |
3 | 2017 | Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs. (2017). Madas, Michael A ; Androutsopoulos, Konstantinos N ; Zografos, Konstantinos G. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0496-7. Full description at Econpapers || Download paper | 18 |
4 | 2017 | Real-time management of berth allocation with stochastic arrival and handling times. (2017). Umang, Nitish ; Erera, Alan L ; Bierlaire, Michel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0480-2. Full description at Econpapers || Download paper | 13 |
5 | 2016 | Scheduling on parallel identical machines with late work criterion: Offline and online cases. (2016). Blazewicz, Jacek ; Han, Xin ; Sterna, Malgorzata ; Chen, Xin. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0464-7. Full description at Econpapers || Download paper | 10 |
6 | 2017 | Mathematical models for the berth allocation problem in dry bulk terminals. (2017). Ernst, Andreas T ; Taherkhani, Gita ; Singh, Gaurav ; Ouz, Ceyda. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0510-8. Full description at Econpapers || Download paper | 9 |
7 | 2018 | Case mix classification and a benchmark set for surgery scheduling. (2018). Leeftink, Greanne ; Hans, Erwin W. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0539-8. Full description at Econpapers || Download paper | 8 |
8 | 2018 | A survey on how the structure of precedence constraints may change the complexity class of scheduling problems. (2018). Prot, D ; Bellenguez-Morineau, O. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0519-z. Full description at Econpapers || Download paper | 8 |
9 | 2019 | Journal of scheduling (2019). (2019). Burke, Edmund ; Pinedo, Michael. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-019-00603-z. Full description at Econpapers || Download paper | 7 |
10 | 2020 | The optimal design of round-robin tournaments with three players. (2020). Krumer, Alex ; Sela, Aner ; Megidish, Reut. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-019-00624-8. Full description at Econpapers || Download paper | 7 |
11 | 2020 | Single-machine scheduling with multi-agents to minimize total weighted late work. (2020). Li, Shi-Sheng ; Yuan, Jin-Jiang. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-020-00646-7. Full description at Econpapers || Download paper | 7 |
12 | 2017 | An exact extended formulation for the unrelated parallel machine total weighted completion time problem. (2017). Bulbul, Kerem ; En, Halil. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-016-0485-x. Full description at Econpapers || Download paper | 6 |
13 | 2017 | A parameterized complexity view on non-preemptively scheduling interval-constrained jobs: few machines, small looseness, and small slack. (2017). Bevern, Rene ; Such, Ondej ; Niedermeier, Rolf. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0478-9. Full description at Econpapers || Download paper | 6 |
14 | 2019 | A unified heuristic and an annotated bibliography for a large class of earlinessâtardiness scheduling problems. (2019). Kramer, Arthur ; Subramanian, Anand. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-017-0549-6. Full description at Econpapers || Download paper | 5 |
15 | 2017 | Scheduling shipments in closed-loop sortation conveyors. (2017). Briskorn, Dirk ; Boysen, Nils ; Emde, Simon. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0498-5. Full description at Econpapers || Download paper | 5 |
16 | 2017 | Unary NP-hardness of minimizing the number of tardy jobs with deadlines. (2017). Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:2:d:10.1007_s10951-016-0479-8. Full description at Econpapers || Download paper | 5 |
17 | 2019 | A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem. (2019). Hill, Alessandro ; Goycoolea, Marcos ; Voss, Stefan ; Lalla-Ruiz, Eduardo. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0578-9. Full description at Econpapers || Download paper | 5 |
18 | 2019 | The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs. (2019). Chen, Rubing ; Gao, Yuan ; Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0598-5. Full description at Econpapers || Download paper | 5 |
19 | 2017 | Scheduling reclaimers serving a stock pad at a coal terminal. (2017). Kalinowski, Thomas ; Martin, ; Kapoor, Reena . In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0495-8. Full description at Econpapers || Download paper | 5 |
20 | 2017 | Finding an optimal Nash equilibrium to the multi-agent project scheduling problem. (2017). Briand, Cyril ; Cha, Pemysl ; Ngueveu, Sandra Ulrich. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0516-2. Full description at Econpapers || Download paper | 5 |
21 | 2019 | The proactive and reactive resource-constrained project scheduling problem. (2019). Davari, Morteza ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-017-0553-x. Full description at Econpapers || Download paper | 4 |
22 | 2018 | Approaches to modeling train scheduling problems as job-shop problems with blocking constraints. (2018). Lange, Julia ; Werner, Frank. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0526-0. Full description at Econpapers || Download paper | 4 |
23 | 2016 | A genetic algorithm for the robust resource leveling problem. (2016). Li, Hongbo ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0457-6. Full description at Econpapers || Download paper | 4 |
24 | 2017 | An integrated model for the transshipment yard scheduling problem. (2017). Cichenski, Mateusz ; Blazewicz, Jacek ; Singh, Gaurav ; Pesch, Erwin ; Pawlak, Grzegorz ; Jaehn, Florian. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0470-4. Full description at Econpapers || Download paper | 4 |
25 | 2019 | Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs. (2019). Hung, Hui-Chih ; Wei, Jun-Min ; Posner, Marc E. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:4:d:10.1007_s10951-018-0584-y. Full description at Econpapers || Download paper | 4 |
26 | 2017 | Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs. (2017). Wu, Chin-Chia ; Wang, Du-Juan ; Yin, Yunqiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-017-0511-7. Full description at Econpapers || Download paper | 4 |
27 | 2017 | Continuous-time production, distribution and financial planning with periodic liquidity balancing. (2017). Albrecht, Wolfgang ; Steinrucke, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0488-7. Full description at Econpapers || Download paper | 4 |
28 | 2018 | Scheduling meets n-fold integer programming. (2018). Knop, Duan ; Kouteck, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0550-0. Full description at Econpapers || Download paper | 4 |
29 | 2020 | A review of four decades of time-dependent scheduling: main results, new topics, and open problems. (2020). Gawiejnowicz, Stanisaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:1:d:10.1007_s10951-019-00630-w. Full description at Econpapers || Download paper | 4 |
30 | 2018 | New strategies for stochastic resource-constrained project scheduling. (2018). Rostami, Salim ; Leus, Roel ; Creemers, Stefan. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:3:d:10.1007_s10951-016-0505-x. Full description at Econpapers || Download paper | 4 |
31 | 2016 | A new approximation algorithm for multi-agent scheduling to minimize makespan on two machines. (2016). Zhao, Kejun ; Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0460-y. Full description at Econpapers || Download paper | 4 |
32 | 2019 | Parameterized complexity of a coupled-task scheduling problem. (2019). Bessy, S ; Giroudeau, R. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0581-1. Full description at Econpapers || Download paper | 3 |
33 | 2018 | A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines. (2018). Tan, YI ; Fowler, John W ; Monch, Lars. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0530-4. Full description at Econpapers || Download paper | 3 |
34 | 2018 | Combining two-stage stochastic programming and recoverable robustness to minimize the number of late jobs in the case of uncertain processing times. (2018). Akker, Marjan ; Stoef, Judith ; Hoogeveen, Han. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:6:d:10.1007_s10951-018-0559-z. Full description at Econpapers || Download paper | 3 |
35 | 2018 | Integrated production and outbound distribution scheduling problems with job release dates and deadlines. (2018). Fu, Liang-Liang ; Artigues, Christian ; Aloulou, Mohamed Ali. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:4:d:10.1007_s10951-017-0542-0. Full description at Econpapers || Download paper | 3 |
36 | 2017 | Optimizing railway crew schedules with fairness preferences. (2017). Jutte, Silke ; Thonemann, Ulrich W ; Muller, Daniel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0499-4. Full description at Econpapers || Download paper | 3 |
37 | 2017 | Single machine scheduling with a generalized job-dependent cumulative effect. (2017). Rustogi, Kabir ; Strusevich, Vitaly A. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:6:d:10.1007_s10951-016-0497-6. Full description at Econpapers || Download paper | 3 |
38 | 2019 | Scheduling and rescheduling elective patients in operating rooms to minimise the percentage of tardy patients. (2019). Ballestin, Francisco ; Quintanilla, Sacramento ; Perez, Angeles. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0570-4. Full description at Econpapers || Download paper | 3 |
39 | 2018 | Scheduling electric vehicles and locating charging stations on a path. (2018). Boysen, Nils ; Emde, Simon ; Briskorn, Dirk. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0538-9. Full description at Econpapers || Download paper | 3 |
40 | 2016 | A survey of offline algorithms for energy minimization under deadline constraints. (2016). , Marco ; Hurink, Johann L. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0463-8. Full description at Econpapers || Download paper | 3 |
41 | 2017 | Staff and machine shift scheduling in a German potash mine. (2017). Schulze, Marco ; Zimmermann, Jurgen. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:6:d:10.1007_s10951-017-0527-z. Full description at Econpapers || Download paper | 3 |
42 | 2017 | Crane scheduling in railway yards: an analysis of computational complexity. (2017). Stephan, Konrad ; Boysen, Nils. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0520-6. Full description at Econpapers || Download paper | 3 |
43 | 2019 | Scheduling recurring radiotherapy appointments in an ion beam facility. (2019). Vogl, Petra ; Doerner, Karl F ; Braune, Roland. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0574-0. Full description at Econpapers || Download paper | 3 |
44 | 2018 | An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines. (2018). Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0546-9. Full description at Econpapers || Download paper | 3 |
45 | 2020 | Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling. (2020). Eynde, Rob ; Vanhoucke, Mario. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00651-w. Full description at Econpapers || Download paper | 3 |
46 | 2018 | Solving a wind turbine maintenance scheduling problem. (2018). Froger, Aurelien ; Rousseau, Louis-Martin ; Pinson, Eric ; Mendoza, Jorge E ; Gendreau, Michel. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0513-5. Full description at Econpapers || Download paper | 2 |
47 | 2020 | Single machine scheduling to maximize the number of on-time jobs with generalized due-dates. (2020). Gerstl, Enrique ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00638-7. Full description at Econpapers || Download paper | 2 |
48 | 2016 | On scheduling with non-increasing time slot cost to minimize total weighted completion time. (2016). Zhao, Yingchao ; Li, Minming ; Qi, Xiangtong. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0462-9. Full description at Econpapers || Download paper | 2 |
49 | 2018 | Energy-efficient scheduling and routing via randomized rounding. (2018). Bampis, Evripidis ; Sviridenko, Maxim ; Lucarelli, Giorgio ; Letsios, Dimitrios ; Kononov, Alexander. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-016-0500-2. Full description at Econpapers || Download paper | 2 |
50 | 2019 | Scheduling parallel batching machines in a sequence. (2019). Passchyn, Ward. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0560-6. Full description at Econpapers || Download paper | 2 |
# | Year | Title | Cited |
---|---|---|---|
1 | 2016 | Scheduling operating rooms: achievements, challenges and pitfalls. (2016). Cardoen, Brecht ; Rademakers, Frank E ; Vansteenkiste, Nancy ; Demeulemeester, Erik ; van Riet, Carla ; Samudra, Michael . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:5:d:10.1007_s10951-016-0489-6. Full description at Econpapers || Download paper | 25 |
2 | 2017 | Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs. (2017). Madas, Michael A ; Androutsopoulos, Konstantinos N ; Zografos, Konstantinos G. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0496-7. Full description at Econpapers || Download paper | 10 |
3 | 2016 | Scheduling on parallel identical machines with late work criterion: Offline and online cases. (2016). Blazewicz, Jacek ; Han, Xin ; Sterna, Malgorzata ; Chen, Xin. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0464-7. Full description at Econpapers || Download paper | 8 |
4 | 2020 | Single-machine scheduling with multi-agents to minimize total weighted late work. (2020). Li, Shi-Sheng ; Yuan, Jin-Jiang. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-020-00646-7. Full description at Econpapers || Download paper | 7 |
5 | 2018 | Case mix classification and a benchmark set for surgery scheduling. (2018). Leeftink, Greanne ; Hans, Erwin W. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0539-8. Full description at Econpapers || Download paper | 7 |
6 | 2017 | Real-time management of berth allocation with stochastic arrival and handling times. (2017). Umang, Nitish ; Erera, Alan L ; Bierlaire, Michel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0480-2. Full description at Econpapers || Download paper | 7 |
7 | 2020 | The optimal design of round-robin tournaments with three players. (2020). Krumer, Alex ; Sela, Aner ; Megidish, Reut. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-019-00624-8. Full description at Econpapers || Download paper | 6 |
8 | 2019 | Journal of scheduling (2019). (2019). Burke, Edmund ; Pinedo, Michael. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-019-00603-z. Full description at Econpapers || Download paper | 6 |
9 | 2018 | A survey on how the structure of precedence constraints may change the complexity class of scheduling problems. (2018). Prot, D ; Bellenguez-Morineau, O. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0519-z. Full description at Econpapers || Download paper | 6 |
10 | 2019 | The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs. (2019). Chen, Rubing ; Gao, Yuan ; Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0598-5. Full description at Econpapers || Download paper | 5 |
11 | 2019 | A unified heuristic and an annotated bibliography for a large class of earlinessâtardiness scheduling problems. (2019). Kramer, Arthur ; Subramanian, Anand. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-017-0549-6. Full description at Econpapers || Download paper | 5 |
12 | 2017 | Scheduling reclaimers serving a stock pad at a coal terminal. (2017). Kalinowski, Thomas ; Martin, ; Kapoor, Reena . In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0495-8. Full description at Econpapers || Download paper | 5 |
13 | 2017 | Finding an optimal Nash equilibrium to the multi-agent project scheduling problem. (2017). Briand, Cyril ; Cha, Pemysl ; Ngueveu, Sandra Ulrich. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0516-2. Full description at Econpapers || Download paper | 4 |
14 | 2019 | A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem. (2019). Hill, Alessandro ; Goycoolea, Marcos ; Voss, Stefan ; Lalla-Ruiz, Eduardo. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0578-9. Full description at Econpapers || Download paper | 4 |
15 | 2017 | Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs. (2017). Wu, Chin-Chia ; Wang, Du-Juan ; Yin, Yunqiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-017-0511-7. Full description at Econpapers || Download paper | 4 |
16 | 2019 | The proactive and reactive resource-constrained project scheduling problem. (2019). Davari, Morteza ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-017-0553-x. Full description at Econpapers || Download paper | 4 |
17 | 2016 | A genetic algorithm for the robust resource leveling problem. (2016). Li, Hongbo ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0457-6. Full description at Econpapers || Download paper | 4 |
18 | 2020 | A review of four decades of time-dependent scheduling: main results, new topics, and open problems. (2020). Gawiejnowicz, Stanisaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:1:d:10.1007_s10951-019-00630-w. Full description at Econpapers || Download paper | 4 |
19 | 2018 | Approaches to modeling train scheduling problems as job-shop problems with blocking constraints. (2018). Lange, Julia ; Werner, Frank. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0526-0. Full description at Econpapers || Download paper | 4 |
20 | 2017 | Mathematical models for the berth allocation problem in dry bulk terminals. (2017). Ernst, Andreas T ; Taherkhani, Gita ; Singh, Gaurav ; Ouz, Ceyda. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0510-8. Full description at Econpapers || Download paper | 4 |
21 | 2019 | Scheduling recurring radiotherapy appointments in an ion beam facility. (2019). Vogl, Petra ; Doerner, Karl F ; Braune, Roland. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0574-0. Full description at Econpapers || Download paper | 3 |
22 | 2018 | An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines. (2018). Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0546-9. Full description at Econpapers || Download paper | 3 |
23 | 2018 | Combining two-stage stochastic programming and recoverable robustness to minimize the number of late jobs in the case of uncertain processing times. (2018). Akker, Marjan ; Stoef, Judith ; Hoogeveen, Han. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:6:d:10.1007_s10951-018-0559-z. Full description at Econpapers || Download paper | 3 |
24 | 2019 | Parameterized complexity of a coupled-task scheduling problem. (2019). Bessy, S ; Giroudeau, R. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0581-1. Full description at Econpapers || Download paper | 3 |
25 | 2017 | A parameterized complexity view on non-preemptively scheduling interval-constrained jobs: few machines, small looseness, and small slack. (2017). Bevern, Rene ; Such, Ondej ; Niedermeier, Rolf. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0478-9. Full description at Econpapers || Download paper | 3 |
26 | 2019 | Scheduling and rescheduling elective patients in operating rooms to minimise the percentage of tardy patients. (2019). Ballestin, Francisco ; Quintanilla, Sacramento ; Perez, Angeles. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0570-4. Full description at Econpapers || Download paper | 3 |
27 | 2018 | Scheduling meets n-fold integer programming. (2018). Knop, Duan ; Kouteck, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0550-0. Full description at Econpapers || Download paper | 3 |
28 | 2019 | Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs. (2019). Hung, Hui-Chih ; Wei, Jun-Min ; Posner, Marc E. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:4:d:10.1007_s10951-018-0584-y. Full description at Econpapers || Download paper | 3 |
29 | 2018 | A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines. (2018). Tan, YI ; Fowler, John W ; Monch, Lars. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0530-4. Full description at Econpapers || Download paper | 3 |
30 | 2017 | Unary NP-hardness of minimizing the number of tardy jobs with deadlines. (2017). Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:2:d:10.1007_s10951-016-0479-8. Full description at Econpapers || Download paper | 3 |
31 | 2020 | Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling. (2020). Eynde, Rob ; Vanhoucke, Mario. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00651-w. Full description at Econpapers || Download paper | 3 |
32 | 2017 | An integrated model for the transshipment yard scheduling problem. (2017). Cichenski, Mateusz ; Blazewicz, Jacek ; Singh, Gaurav ; Pesch, Erwin ; Pawlak, Grzegorz ; Jaehn, Florian. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0470-4. Full description at Econpapers || Download paper | 3 |
33 | 2019 | Scheduling parallel batching machines in a sequence. (2019). Passchyn, Ward. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0560-6. Full description at Econpapers || Download paper | 2 |
34 | 2017 | Staff and machine shift scheduling in a German potash mine. (2017). Schulze, Marco ; Zimmermann, Jurgen. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:6:d:10.1007_s10951-017-0527-z. Full description at Econpapers || Download paper | 2 |
35 | 2017 | Crane scheduling in railway yards: an analysis of computational complexity. (2017). Stephan, Konrad ; Boysen, Nils. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0520-6. Full description at Econpapers || Download paper | 2 |
36 | 2016 | On scheduling with non-increasing time slot cost to minimize total weighted completion time. (2016). Zhao, Yingchao ; Li, Minming ; Qi, Xiangtong. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0462-9. Full description at Econpapers || Download paper | 2 |
37 | 2020 | Interference aware scheduling of triple-crossover-cranes. (2020). Briskorn, Dirk ; Zey, Lennart. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-019-00634-6. Full description at Econpapers || Download paper | 2 |
38 | 2018 | Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines. (2018). Kress, Dominik ; Pesch, Erwin ; Barketau, Maksim. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:6:d:10.1007_s10951-018-0561-5. Full description at Econpapers || Download paper | 2 |
39 | 2018 | Solving a wind turbine maintenance scheduling problem. (2018). Froger, Aurelien ; Rousseau, Louis-Martin ; Pinson, Eric ; Mendoza, Jorge E ; Gendreau, Michel. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0513-5. Full description at Econpapers || Download paper | 2 |
40 | 2016 | A new approximation algorithm for multi-agent scheduling to minimize makespan on two machines. (2016). Zhao, Kejun ; Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0460-y. Full description at Econpapers || Download paper | 2 |
41 | 2019 | Daily course pattern formulation and valid inequalities for the curriculum-based course timetabling problem. (2019). Bagger, Niels-Christian Fink ; Desrosiers, Jacques ; Desaulniers, Guy. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0582-0. Full description at Econpapers || Download paper | 2 |
42 | 2016 | Scheduling with time-dependent discrepancy times. (2016). Jaehn, Florian ; Sedding, Helmut A. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-016-0472-2. Full description at Econpapers || Download paper | 2 |
43 | 2018 | New strategies for stochastic resource-constrained project scheduling. (2018). Rostami, Salim ; Leus, Roel ; Creemers, Stefan. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:3:d:10.1007_s10951-016-0505-x. Full description at Econpapers || Download paper | 2 |
44 | 2017 | Continuous-time production, distribution and financial planning with periodic liquidity balancing. (2017). Albrecht, Wolfgang ; Steinrucke, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0488-7. Full description at Econpapers || Download paper | 2 |
45 | 2020 | An optimal online algorithm for scheduling with general machine cost functions. (2020). Akaria, Islam ; Epstein, Leah. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:2:d:10.1007_s10951-019-00629-3. Full description at Econpapers || Download paper | 2 |
46 | 2018 | Energy-efficient scheduling and routing via randomized rounding. (2018). Bampis, Evripidis ; Sviridenko, Maxim ; Lucarelli, Giorgio ; Letsios, Dimitrios ; Kononov, Alexander. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-016-0500-2. Full description at Econpapers || Download paper | 2 |
47 | 2020 | Single machine scheduling to maximize the number of on-time jobs with generalized due-dates. (2020). Gerstl, Enrique ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00638-7. Full description at Econpapers || Download paper | 2 |
48 | 2019 | Single-machine common due date total earliness/tardiness scheduling with machine unavailability. (2019). Bulbul, Kerem ; En, Halil ; Kedad-Sidhoum, Safia. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0585-x. Full description at Econpapers || Download paper | 2 |
49 | 2017 | Optimizing railway crew schedules with fairness preferences. (2017). Jutte, Silke ; Thonemann, Ulrich W ; Muller, Daniel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0499-4. Full description at Econpapers || Download paper | 2 |
50 | 2017 | An exact extended formulation for the unrelated parallel machine total weighted completion time problem. (2017). Bulbul, Kerem ; En, Halil. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-016-0485-x. Full description at Econpapers || Download paper | 2 |
Year | Title | |
---|---|---|
2021 | Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates. (2021). Mor, Baruch ; Shabtay, Dvir ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00697-4. Full description at Econpapers || Download paper | |
2021 | Three notes on scheduling unit-length jobs with precedence constraints to minimize the total completion time. (2021). Wang, Tianyu ; Bellenguez, Odile. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00702-w. Full description at Econpapers || Download paper | |
2021 | A note on the single machine CON and CONW problems with lot scheduling. (2021). Mor, Baruch ; Mosheiov, Gur. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:42:y:2021:i:2:d:10.1007_s10878-021-00709-1. Full description at Econpapers || Download paper | |
2021 | Minimizing total late work on a single machine with generalized due-dates. (2021). Shabtay, Dvir ; Oron, Daniel ; Mosheiov, Gur. In: European Journal of Operational Research. RePEc:eee:ejores:v:293:y:2021:i:3:p:837-846. Full description at Econpapers || Download paper | |
2021 | Applying âPeeling Onionâ approach for competitive analysis in online scheduling with rejection. (2021). Guo, Sainan ; Ma, Ran. In: European Journal of Operational Research. RePEc:eee:ejores:v:290:y:2021:i:1:p:57-67. Full description at Econpapers || Download paper | |
2021 | Minimizing total completion time in the two-machine no-idle no-wait flow shop problem. (2021). Salassa, Fabio ; Grosso, Andrea ; della Croce, Federico. In: Journal of Heuristics. RePEc:spr:joheur:v:27:y:2021:i:1:d:10.1007_s10732-019-09430-z. Full description at Econpapers || Download paper | |
2021 | Four decades of research on the open-shop scheduling problem to minimize the makespan. (2021). Cheng, T. C. E., ; Salehipour, Amir ; Khatami, Mostafa ; Ahmadian, Mohammad Mahdi. In: European Journal of Operational Research. RePEc:eee:ejores:v:295:y:2021:i:2:p:399-426. Full description at Econpapers || Download paper | |
2021 | Optimally rescheduling jobs with a Last-In-First-Out buffer. (2021). Nicosia, Gaia ; Righini, Giovanni ; Resch, Julia ; Pferschy, Ulrich ; Pacifici, Andrea. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00707-5. Full description at Econpapers || Download paper | |
2021 | A digital twins concept model for integrated maintenance: a case study for crane operation. (2021). Duarte, Yorlandys Salgado ; Szpytko, Janusz. In: Journal of Intelligent Manufacturing. RePEc:spr:joinma:v:32:y:2021:i:7:d:10.1007_s10845-020-01689-5. Full description at Econpapers || Download paper | |
2021 | Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs. (2021). Du, Jiangze ; Mei, Jiajie ; Wan, Long. In: European Journal of Operational Research. RePEc:eee:ejores:v:290:y:2021:i:1:p:26-35. Full description at Econpapers || Download paper | |
2021 | Pareto?optimization of three?agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work. (2021). Chiu, Tai ; To, Chi ; Yuan, Jinjiang ; Zhang, Yuan. In: Naval Research Logistics (NRL). RePEc:wly:navres:v:68:y:2021:i:3:p:378-393. Full description at Econpapers || Download paper | |
2021 | Solution methods for scheduling problems with sequence-dependent deterioration and maintenance events. (2021). , Nilson ; Iori, Manuel ; Delorme, Maxence. In: European Journal of Operational Research. RePEc:eee:ejores:v:295:y:2021:i:3:p:823-837. Full description at Econpapers || Download paper | |
2021 | A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource. (2021). Hashimoto, Susumu ; Mizuno, Shinji. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:3:d:10.1007_s10951-021-00681-y. Full description at Econpapers || Download paper | |
2021 | . Full description at Econpapers || Download paper | |
2021 | Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work. (2021). He, Ruyan ; T. C. E. Cheng, ; Yuan, Jinjiang. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:41:y:2021:i:2:d:10.1007_s10878-021-00697-2. Full description at Econpapers || Download paper | |
2021 | Late and early work scheduling: A survey. (2021). Sterna, Magorzata. In: Omega. RePEc:eee:jomega:v:104:y:2021:i:c:s0305048321000621. Full description at Econpapers || Download paper | |
2021 | Routing two stacking cranes with predetermined container sequences. (2021). Briskorn, Dirk. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:4:d:10.1007_s10951-021-00689-4. Full description at Econpapers || Download paper | |
2021 | The impact of flexibility on engineer-to-order production planning. (2021). Kolisch, Rainer ; Brachmann, Robert. In: International Journal of Production Economics. RePEc:eee:proeco:v:239:y:2021:i:c:s0925527321001596. Full description at Econpapers || Download paper | |
2021 | New results for scheduling to minimize tardiness on one machine with rejection and related problems. (2021). Koulamas, Christos ; Steiner, George. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:1:d:10.1007_s10951-020-00671-6. Full description at Econpapers || Download paper | |
2021 | A robust optimization approach for the multi-mode resource-constrained project scheduling problem. (2021). Cohen, Izack ; Balouka, Noemie. In: European Journal of Operational Research. RePEc:eee:ejores:v:291:y:2021:i:2:p:457-470. Full description at Econpapers || Download paper | |
2021 | Underground mine scheduling under uncertainty. (2021). Brickey, Andrea ; Newman, Alexandra ; Pagnoncelli, Bernardo K ; Goycoolea, Marcos ; Lamas, Patricio ; Blake, Lewis R ; Nesbitt, Peter. In: European Journal of Operational Research. RePEc:eee:ejores:v:294:y:2021:i:1:p:340-352. Full description at Econpapers || Download paper | |
2021 | . Full description at Econpapers || Download paper | |
2021 | Integrated planning of berth allocation and vessel sequencing in a seaport with one-way navigation channel. (2021). Wang, Yadong ; Sheng, Dian ; Li, Zhi-Chun ; Liu, Baoli. In: Transportation Research Part B: Methodological. RePEc:eee:transb:v:143:y:2021:i:c:p:23-47. Full description at Econpapers || Download paper | |
2021 | An integrated model for vessel traffic and deballasting scheduling in coal export terminals. (2021). Feng, Peng ; Xu, Xinglu ; Jiang, Ying ; Wang, Wenyuan ; Cao, Zhen ; Guo, Zijian. In: Transportation Research Part E: Logistics and Transportation Review. RePEc:eee:transe:v:152:y:2021:i:c:s1366554521001769. Full description at Econpapers || Download paper | |
2021 | Scheduling coupled tasks with exact delays for minimum total job completion time. (2021). Chen, BO ; Zhang, Xiandong. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:2:d:10.1007_s10951-020-00668-1. Full description at Econpapers || Download paper | |
2021 | Coupled task scheduling with time-dependent processing times. (2021). Khatami, Mostafa ; Salehipour, Amir. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:2:d:10.1007_s10951-020-00675-2. Full description at Econpapers || Download paper | |
2021 | Parallel machine scheduling with minimum number of tardy jobs: Approximation and exponential algorithms. (2021). Ploton, Olivier ; Tkindt, Vincent ; della Croce, Federico. In: Applied Mathematics and Computation. RePEc:eee:apmaco:v:397:y:2021:i:c:s0096300320308419. Full description at Econpapers || Download paper | |
2021 | Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization. (2021). Lacomme, Philippe ; Iori, Manuel ; Kramer, Arthur. In: European Journal of Operational Research. RePEc:eee:ejores:v:289:y:2021:i:3:p:825-840. Full description at Econpapers || Download paper | |
2021 | Integer programming formulations in sequencing with total earliness and tardiness penalties, arbitrary due dates, and no idle time: A concise review and extension. (2021). Womer, Keith ; Wang, Haibo ; Li, Haitao ; Alidaee, Bahram. In: Omega. RePEc:eee:jomega:v:103:y:2021:i:c:s0305048321000554. Full description at Econpapers || Download paper | |
2021 | Optimal Seedings in Interdependent Contests. (2021). Sela, Aner ; Rabi, Ishay ; Cohen, Chen. In: Working Papers. RePEc:bgu:wpaper:2108. Full description at Econpapers || Download paper | |
2021 | Sequential round-robin tournaments with multiple prizes. (2021). Sahm, Marco ; Lauber, Arne ; Laica, Christoph. In: Games and Economic Behavior. RePEc:eee:gamebe:v:129:y:2021:i:c:p:421-448. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2021 | Job Scheduling under Time-of-Use Energy Tariffs for Sustainable Manufacturing: A Survey. (2021). Ronco, Roberto ; Pesenti, Raffaele ; Catanzaro, Daniele. In: LIDAM Discussion Papers CORE. RePEc:cor:louvco:2021019. Full description at Econpapers || Download paper | |
2021 | . Full description at Econpapers || Download paper | |
2021 | Optimally rescheduling jobs with a Last-In-First-Out buffer. (2021). Nicosia, Gaia ; Righini, Giovanni ; Resch, Julia ; Pferschy, Ulrich ; Pacifici, Andrea. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00707-5. Full description at Econpapers || Download paper | |
2021 | Projektmanagementsoftware und Scheduling: Aktuelle Bestandsaufnahme von Funktionalitäten und Identifikation von Potenzialen. (2021). Schultmann, Frank ; Volk, Rebekka ; Winkler, Franziska ; Gehring, Marco. In: Working Paper Series in Production and Energy. RePEc:zbw:kitiip:60. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2020 | Effort Comparisons for a Class of Four-Player Tournaments. (2020). SaÄlam, ÃaÄrı ; Caglayan, Deren ; Saglam, Cagri ; Keskin, Kerim ; Karagozoglu, Emin. In: CESifo Working Paper Series. RePEc:ces:ceswps:_8761. Full description at Econpapers || Download paper | |
2020 | Strategic Manipulations in Round-Robin Tournaments. (2020). Krumer, Alex ; Megidish, Reut ; Sela, Aner. In: CEPR Discussion Papers. RePEc:cpr:ceprdp:14412. Full description at Econpapers || Download paper | |
2020 | Scheduling spatially distributed jobs with degradation: Application to pothole repair. (2020). Batta, Rajan ; Aarabi, Fatemeh. In: Socio-Economic Planning Sciences. RePEc:eee:soceps:v:72:y:2020:i:c:s0038012119304719. Full description at Econpapers || Download paper | |
2020 | . Full description at Econpapers || Download paper | |
2020 | A Framework for Capacity and Operations Planning in Services Organizations Employing Workers with Intellectual Disabilities. (2020). Ruiz, Angel ; Maheut, Julien ; Garcia-Sabater, Jose Pedro. In: Sustainability. RePEc:gam:jsusta:v:12:y:2020:i:22:p:9713-:d:448726. Full description at Econpapers || Download paper | |
2020 | . Full description at Econpapers || Download paper | |
2020 | Multiprocessor open shop problem: literature review and future directions. (2020). Adak, Zeynep ; Bulkan, Serol ; Ariolu, Mahmure Ovul. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:40:y:2020:i:2:d:10.1007_s10878-020-00591-3. Full description at Econpapers || Download paper | |
2020 | New results for an open time-dependent scheduling problem. (2020). Gawiejnowicz, Stanisaw ; Kurc, Wiesaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-020-00662-7. Full description at Econpapers || Download paper | |
2020 | Scheduling jobs with a V-shaped time-dependent processing time. (2020). Sedding, Helmut A. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-020-00665-4. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2019 | Discrete and continuous-time formulations for dealing with break periods: Preemptive and non-preemptive scheduling. (2019). Harjunkoski, Iiro ; Castro, Pedro M ; Grossmann, Ignacio E. In: European Journal of Operational Research. RePEc:eee:ejores:v:278:y:2019:i:2:p:563-577. Full description at Econpapers || Download paper | |
2019 | Managing Navigation Channel Traffic and Anchorage Area Utilization of a Container Port. (2019). Xu, Zhou ; Li, Chung-Lun ; Jia, Shuai. In: Transportation Science. RePEc:inm:ortrsc:v:53:y:2019:i:3:p:728-745. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2018 | Planning of Electric Vehicle Charging Infrastructure for Urban Areas with Tight Land Supply. (2018). Yang, Lin ; Guo, Chunlin. In: Energies. RePEc:gam:jeners:v:11:y:2018:i:9:p:2314-:d:167366. Full description at Econpapers || Download paper | |
2018 | An empirical study on solving an integrated production and distribution problem with a hybrid strategy. (2018). Tsai, Sang-Bing ; Wang, Kai ; Lu, Hui ; Xu, Guangshu ; Zhou, LI ; Li, Feng. In: PLOS ONE. RePEc:plo:pone00:0206806. Full description at Econpapers || Download paper |