[Raw data] [50 most cited papers] [50 most relevant papers] [cites used to compute IF] [Recent citations ][Frequent citing series ] [more data in EconPapers] [trace new citations] [Missing citations? Add them now] [Incorrect content? Let us know]
IF | AIF | CIF | IF5 | DOC | CDO | CIT | NCI | CCU | D2Y | C2Y | D5Y | C5Y | SC | %SC | CiY | II | AII | |
2016 | 0 | 0.53 | 0.08 | 0 | 24 | 24 | 103 | 2 | 2 | 0 | 0 | 0 | 2 | 0.08 | 0.21 | |||
2017 | 0.79 | 0.54 | 0.28 | 0.79 | 45 | 69 | 129 | 19 | 21 | 24 | 19 | 24 | 19 | 0 | 0 | 0.22 | ||
2018 | 0.39 | 0.56 | 0.25 | 0.39 | 46 | 115 | 75 | 29 | 50 | 69 | 27 | 69 | 27 | 5 | 17.2 | 2 | 0.04 | 0.24 |
2019 | 0.49 | 0.58 | 0.39 | 0.49 | 46 | 161 | 77 | 61 | 112 | 91 | 45 | 115 | 56 | 7 | 11.5 | 2 | 0.04 | 0.23 |
2020 | 0.21 | 0.7 | 0.37 | 0.37 | 47 | 208 | 72 | 77 | 189 | 92 | 19 | 161 | 59 | 19 | 24.7 | 9 | 0.19 | 0.33 |
2021 | 0.34 | 0.87 | 0.37 | 0.33 | 41 | 249 | 16 | 91 | 280 | 93 | 32 | 208 | 68 | 24 | 26.4 | 4 | 0.1 | 0.32 |
2022 | 0.32 | 1 | 0.38 | 0.36 | 41 | 290 | 15 | 110 | 390 | 88 | 28 | 225 | 80 | 16 | 14.5 | 1 | 0.02 | 0.31 |
IF: | Two years Impact Factor: C2Y / D2Y |
AIF: | Average Impact Factor for all series in RePEc in year y |
CIF: | Cumulative impact factor |
IF5: | Five years Impact Factor: C5Y / D5Y |
DOC: | Number of documents published in year y |
CDO: | Cumulative number of documents published until year y |
CIT: | Number of citations to papers published in year y |
NCI: | Number of citations in year y |
CCU: | Cumulative number of citations to papers published until year y |
D2Y: | Number of articles published in y-1 plus y-2 |
C2Y: | Cites in y to articles published in y-1 plus y-2 |
D5Y: | Number of articles published in y-1 until y-5 |
C5Y: | Cites in y to articles published in y-1 until y-5 |
SC: | selft citations in y to articles published in y-1 plus y-2 |
%SC: | Percentage of selft citations in y to articles published in y-1 plus y-2 |
CiY: | Cites in year y to documents published in year y |
II: | Immediacy Index: CiY / Documents. |
AII: | Average Immediacy Index for series in RePEc in year y |
# | Year | Title | Cited |
---|---|---|---|
1 | 2016 | Scheduling operating rooms: achievements, challenges and pitfalls. (2016). Cardoen, Brecht ; Rademakers, Frank E ; Vansteenkiste, Nancy ; Demeulemeester, Erik ; van Riet, Carla ; Samudra, Michael . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:5:d:10.1007_s10951-016-0489-6. Full description at Econpapers || Download paper | 41 |
2 | 2016 | Scheduling for electricity cost in a smart grid. (2016). , Prudence ; Hon, Wing-Kai ; Liu, Hsiang-Hsuan ; David, ; Burcea, Mihai . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0447-8. Full description at Econpapers || Download paper | 22 |
3 | 2017 | Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs. (2017). Madas, Michael A ; Androutsopoulos, Konstantinos N ; Zografos, Konstantinos G. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0496-7. Full description at Econpapers || Download paper | 21 |
4 | 2017 | Real-time management of berth allocation with stochastic arrival and handling times. (2017). Umang, Nitish ; Erera, Alan L ; Bierlaire, Michel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0480-2. Full description at Econpapers || Download paper | 18 |
5 | 2020 | The optimal design of round-robin tournaments with three players. (2020). Krumer, Alex ; Sela, Aner ; Megidish, Reut. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-019-00624-8. Full description at Econpapers || Download paper | 13 |
6 | 2020 | Single-machine scheduling with multi-agents to minimize total weighted late work. (2020). Li, Shi-Sheng ; Yuan, Jin-Jiang. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-020-00646-7. Full description at Econpapers || Download paper | 12 |
7 | 2016 | Scheduling on parallel identical machines with late work criterion: Offline and online cases. (2016). Blazewicz, Jacek ; Han, Xin ; Sterna, Malgorzata ; Chen, Xin. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0464-7. Full description at Econpapers || Download paper | 11 |
8 | 2017 | Mathematical models for the berth allocation problem in dry bulk terminals. (2017). Ernst, Andreas T ; Taherkhani, Gita ; Singh, Gaurav ; Ouz, Ceyda. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0510-8. Full description at Econpapers || Download paper | 11 |
9 | 2018 | A survey on how the structure of precedence constraints may change the complexity class of scheduling problems. (2018). Prot, D ; Bellenguez-Morineau, O. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0519-z. Full description at Econpapers || Download paper | 9 |
10 | 2019 | Journal of scheduling (2019). (2019). Burke, Edmund ; Pinedo, Michael. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-019-00603-z. Full description at Econpapers || Download paper | 9 |
11 | 2018 | Case mix classification and a benchmark set for surgery scheduling. (2018). Leeftink, Greanne ; Hans, Erwin W. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0539-8. Full description at Econpapers || Download paper | 9 |
12 | 2017 | A parameterized complexity view on non-preemptively scheduling interval-constrained jobs: few machines, small looseness, and small slack. (2017). Bevern, Rene ; Such, Ondej ; Niedermeier, Rolf. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0478-9. Full description at Econpapers || Download paper | 8 |
13 | 2017 | Scheduling shipments in closed-loop sortation conveyors. (2017). Briskorn, Dirk ; Boysen, Nils ; Emde, Simon. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0498-5. Full description at Econpapers || Download paper | 7 |
14 | 2019 | The proactive and reactive resource-constrained project scheduling problem. (2019). Davari, Morteza ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-017-0553-x. Full description at Econpapers || Download paper | 7 |
15 | 2017 | Unary NP-hardness of minimizing the number of tardy jobs with deadlines. (2017). Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:2:d:10.1007_s10951-016-0479-8. Full description at Econpapers || Download paper | 7 |
16 | 2020 | A review of four decades of time-dependent scheduling: main results, new topics, and open problems. (2020). Gawiejnowicz, Stanisaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:1:d:10.1007_s10951-019-00630-w. Full description at Econpapers || Download paper | 7 |
17 | 2019 | The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs. (2019). Chen, Rubing ; Gao, Yuan ; Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0598-5. Full description at Econpapers || Download paper | 7 |
18 | 2017 | Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs. (2017). Wu, Chin-Chia ; Wang, Du-Juan ; Yin, Yunqiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-017-0511-7. Full description at Econpapers || Download paper | 6 |
19 | 2017 | An exact extended formulation for the unrelated parallel machine total weighted completion time problem. (2017). Bulbul, Kerem ; En, Halil. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-016-0485-x. Full description at Econpapers || Download paper | 6 |
20 | 2018 | Approaches to modeling train scheduling problems as job-shop problems with blocking constraints. (2018). Lange, Julia ; Werner, Frank. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0526-0. Full description at Econpapers || Download paper | 6 |
21 | 2019 | A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem. (2019). Hill, Alessandro ; Goycoolea, Marcos ; Voss, Stefan ; Lalla-Ruiz, Eduardo. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0578-9. Full description at Econpapers || Download paper | 6 |
22 | 2018 | Scheduling meets n-fold integer programming. (2018). Knop, Duan ; Kouteck, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0550-0. Full description at Econpapers || Download paper | 5 |
23 | 2018 | New strategies for stochastic resource-constrained project scheduling. (2018). Rostami, Salim ; Leus, Roel ; Creemers, Stefan. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:3:d:10.1007_s10951-016-0505-x. Full description at Econpapers || Download paper | 5 |
24 | 2020 | Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling. (2020). Eynde, Rob ; Vanhoucke, Mario. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00651-w. Full description at Econpapers || Download paper | 5 |
25 | 2019 | Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs. (2019). Hung, Hui-Chih ; Wei, Jun-Min ; Posner, Marc E. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:4:d:10.1007_s10951-018-0584-y. Full description at Econpapers || Download paper | 5 |
26 | 2018 | A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines. (2018). Tan, YI ; Fowler, John W ; Monch, Lars. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0530-4. Full description at Econpapers || Download paper | 5 |
27 | 2018 | Combining two-stage stochastic programming and recoverable robustness to minimize the number of late jobs in the case of uncertain processing times. (2018). Akker, Marjan ; Stoef, Judith ; Hoogeveen, Han. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:6:d:10.1007_s10951-018-0559-z. Full description at Econpapers || Download paper | 5 |
28 | 2020 | Single machine scheduling to maximize the number of on-time jobs with generalized due-dates. (2020). Gerstl, Enrique ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00638-7. Full description at Econpapers || Download paper | 5 |
29 | 2017 | Scheduling reclaimers serving a stock pad at a coal terminal. (2017). Kalinowski, Thomas ; Martin, ; Kapoor, Reena . In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0495-8. Full description at Econpapers || Download paper | 5 |
30 | 2017 | Finding an optimal Nash equilibrium to the multi-agent project scheduling problem. (2017). Briand, Cyril ; Cha, Pemysl ; Ngueveu, Sandra Ulrich. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0516-2. Full description at Econpapers || Download paper | 5 |
31 | 2019 | A unified heuristic and an annotated bibliography for a large class of earlinessâtardiness scheduling problems. (2019). Kramer, Arthur ; Subramanian, Anand. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-017-0549-6. Full description at Econpapers || Download paper | 5 |
32 | 2016 | A genetic algorithm for the robust resource leveling problem. (2016). Li, Hongbo ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0457-6. Full description at Econpapers || Download paper | 5 |
33 | 2019 | Scheduling and rescheduling elective patients in operating rooms to minimise the percentage of tardy patients. (2019). Ballestin, Francisco ; Quintanilla, Sacramento ; Perez, Angeles. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0570-4. Full description at Econpapers || Download paper | 5 |
34 | 2019 | Scheduling recurring radiotherapy appointments in an ion beam facility. (2019). Vogl, Petra ; Doerner, Karl F ; Braune, Roland. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0574-0. Full description at Econpapers || Download paper | 4 |
35 | 2017 | Continuous-time production, distribution and financial planning with periodic liquidity balancing. (2017). Albrecht, Wolfgang ; Steinrucke, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0488-7. Full description at Econpapers || Download paper | 4 |
36 | 2019 | On the parameterized tractability of the just-in-time flow-shop scheduling problem. (2019). Hermelin, Danny ; Talmon, Nimrod ; Shabtay, Dvir. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:6:d:10.1007_s10951-019-00617-7. Full description at Econpapers || Download paper | 4 |
37 | 2018 | Scheduling electric vehicles and locating charging stations on a path. (2018). Boysen, Nils ; Emde, Simon ; Briskorn, Dirk. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0538-9. Full description at Econpapers || Download paper | 4 |
38 | 2019 | Parameterized complexity of a coupled-task scheduling problem. (2019). Bessy, S ; Giroudeau, R. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0581-1. Full description at Econpapers || Download paper | 4 |
39 | 2016 | A survey of offline algorithms for energy minimization under deadline constraints. (2016). , Marco ; Hurink, Johann L. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0463-8. Full description at Econpapers || Download paper | 4 |
40 | 2017 | Staff and machine shift scheduling in a German potash mine. (2017). Schulze, Marco ; Zimmermann, Jurgen. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:6:d:10.1007_s10951-017-0527-z. Full description at Econpapers || Download paper | 4 |
41 | 2018 | An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines. (2018). Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0546-9. Full description at Econpapers || Download paper | 4 |
42 | 2017 | An exact algorithm for parallel machine scheduling with conflicts. (2017). Kowalczyk, Daniel ; Leus, Roel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-016-0482-0. Full description at Econpapers || Download paper | 4 |
43 | 2016 | A new approximation algorithm for multi-agent scheduling to minimize makespan on two machines. (2016). Zhao, Kejun ; Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0460-y. Full description at Econpapers || Download paper | 4 |
44 | 2018 | Integrated production and outbound distribution scheduling problems with job release dates and deadlines. (2018). Fu, Liang-Liang ; Artigues, Christian ; Aloulou, Mohamed Ali. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:4:d:10.1007_s10951-017-0542-0. Full description at Econpapers || Download paper | 4 |
45 | 2019 | Inductive $$k$$ k -independent graphs and c-colorable subgraphs in scheduling: a review. (2019). Bentert, Matthias ; Niedermeier, Rolf ; Bevern, Rene . In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0595-8. Full description at Econpapers || Download paper | 4 |
46 | 2019 | Single-machine common due date total earliness/tardiness scheduling with machine unavailability. (2019). Bulbul, Kerem ; En, Halil ; Kedad-Sidhoum, Safia. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0585-x. Full description at Econpapers || Download paper | 4 |
47 | 2017 | An integrated model for the transshipment yard scheduling problem. (2017). Cichenski, Mateusz ; Blazewicz, Jacek ; Singh, Gaurav ; Pesch, Erwin ; Pawlak, Grzegorz ; Jaehn, Florian. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0470-4. Full description at Econpapers || Download paper | 4 |
48 | 2020 | Mixed batch scheduling on identical machines. (2020). Wang, Jun-Qiang ; Liu, Zhixin ; Fan, Guo-Qiang . In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-019-00623-9. Full description at Econpapers || Download paper | 3 |
49 | 2020 | Flowshop scheduling with learning effect and job rejection. (2020). Mor, Baruch ; Shapira, Dana ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-019-00612-y. Full description at Econpapers || Download paper | 3 |
50 | 2017 | Crane scheduling in railway yards: an analysis of computational complexity. (2017). Stephan, Konrad ; Boysen, Nils. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0520-6. Full description at Econpapers || Download paper | 3 |
# | Year | Title | Cited |
---|---|---|---|
1 | 2016 | Scheduling operating rooms: achievements, challenges and pitfalls. (2016). Cardoen, Brecht ; Rademakers, Frank E ; Vansteenkiste, Nancy ; Demeulemeester, Erik ; van Riet, Carla ; Samudra, Michael . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:5:d:10.1007_s10951-016-0489-6. Full description at Econpapers || Download paper | 20 |
2 | 2017 | Real-time management of berth allocation with stochastic arrival and handling times. (2017). Umang, Nitish ; Erera, Alan L ; Bierlaire, Michel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0480-2. Full description at Econpapers || Download paper | 11 |
3 | 2020 | Single-machine scheduling with multi-agents to minimize total weighted late work. (2020). Li, Shi-Sheng ; Yuan, Jin-Jiang. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-020-00646-7. Full description at Econpapers || Download paper | 11 |
4 | 2020 | The optimal design of round-robin tournaments with three players. (2020). Krumer, Alex ; Sela, Aner ; Megidish, Reut. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-019-00624-8. Full description at Econpapers || Download paper | 9 |
5 | 2017 | Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs. (2017). Madas, Michael A ; Androutsopoulos, Konstantinos N ; Zografos, Konstantinos G. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0496-7. Full description at Econpapers || Download paper | 8 |
6 | 2019 | Journal of scheduling (2019). (2019). Burke, Edmund ; Pinedo, Michael. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-019-00603-z. Full description at Econpapers || Download paper | 7 |
7 | 2019 | The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs. (2019). Chen, Rubing ; Gao, Yuan ; Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0598-5. Full description at Econpapers || Download paper | 6 |
8 | 2018 | A survey on how the structure of precedence constraints may change the complexity class of scheduling problems. (2018). Prot, D ; Bellenguez-Morineau, O. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0519-z. Full description at Econpapers || Download paper | 6 |
9 | 2019 | The proactive and reactive resource-constrained project scheduling problem. (2019). Davari, Morteza ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-017-0553-x. Full description at Econpapers || Download paper | 6 |
10 | 2019 | Scheduling and rescheduling elective patients in operating rooms to minimise the percentage of tardy patients. (2019). Ballestin, Francisco ; Quintanilla, Sacramento ; Perez, Angeles. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0570-4. Full description at Econpapers || Download paper | 5 |
11 | 2020 | Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling. (2020). Eynde, Rob ; Vanhoucke, Mario. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00651-w. Full description at Econpapers || Download paper | 5 |
12 | 2019 | A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem. (2019). Hill, Alessandro ; Goycoolea, Marcos ; Voss, Stefan ; Lalla-Ruiz, Eduardo. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0578-9. Full description at Econpapers || Download paper | 5 |
13 | 2020 | Single machine scheduling to maximize the number of on-time jobs with generalized due-dates. (2020). Gerstl, Enrique ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00638-7. Full description at Econpapers || Download paper | 5 |
14 | 2018 | Approaches to modeling train scheduling problems as job-shop problems with blocking constraints. (2018). Lange, Julia ; Werner, Frank. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0526-0. Full description at Econpapers || Download paper | 5 |
15 | 2018 | Combining two-stage stochastic programming and recoverable robustness to minimize the number of late jobs in the case of uncertain processing times. (2018). Akker, Marjan ; Stoef, Judith ; Hoogeveen, Han. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:6:d:10.1007_s10951-018-0559-z. Full description at Econpapers || Download paper | 5 |
16 | 2018 | Case mix classification and a benchmark set for surgery scheduling. (2018). Leeftink, Greanne ; Hans, Erwin W. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0539-8. Full description at Econpapers || Download paper | 5 |
17 | 2017 | A parameterized complexity view on non-preemptively scheduling interval-constrained jobs: few machines, small looseness, and small slack. (2017). Bevern, Rene ; Such, Ondej ; Niedermeier, Rolf. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0478-9. Full description at Econpapers || Download paper | 5 |
18 | 2016 | Scheduling on parallel identical machines with late work criterion: Offline and online cases. (2016). Blazewicz, Jacek ; Han, Xin ; Sterna, Malgorzata ; Chen, Xin. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0464-7. Full description at Econpapers || Download paper | 5 |
19 | 2019 | Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs. (2019). Hung, Hui-Chih ; Wei, Jun-Min ; Posner, Marc E. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:4:d:10.1007_s10951-018-0584-y. Full description at Econpapers || Download paper | 4 |
20 | 2018 | Scheduling meets n-fold integer programming. (2018). Knop, Duan ; Kouteck, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0550-0. Full description at Econpapers || Download paper | 4 |
21 | 2017 | Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs. (2017). Wu, Chin-Chia ; Wang, Du-Juan ; Yin, Yunqiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-017-0511-7. Full description at Econpapers || Download paper | 4 |
22 | 2019 | Inductive $$k$$ k -independent graphs and c-colorable subgraphs in scheduling: a review. (2019). Bentert, Matthias ; Niedermeier, Rolf ; Bevern, Rene . In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0595-8. Full description at Econpapers || Download paper | 4 |
23 | 2020 | A review of four decades of time-dependent scheduling: main results, new topics, and open problems. (2020). Gawiejnowicz, Stanisaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:1:d:10.1007_s10951-019-00630-w. Full description at Econpapers || Download paper | 4 |
24 | 2017 | Unary NP-hardness of minimizing the number of tardy jobs with deadlines. (2017). Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:2:d:10.1007_s10951-016-0479-8. Full description at Econpapers || Download paper | 4 |
25 | 2019 | A unified heuristic and an annotated bibliography for a large class of earlinessâtardiness scheduling problems. (2019). Kramer, Arthur ; Subramanian, Anand. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-017-0549-6. Full description at Econpapers || Download paper | 4 |
26 | 2019 | Single-machine common due date total earliness/tardiness scheduling with machine unavailability. (2019). Bulbul, Kerem ; En, Halil ; Kedad-Sidhoum, Safia. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0585-x. Full description at Econpapers || Download paper | 4 |
27 | 2018 | A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines. (2018). Tan, YI ; Fowler, John W ; Monch, Lars. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0530-4. Full description at Econpapers || Download paper | 4 |
28 | 2019 | On the parameterized tractability of the just-in-time flow-shop scheduling problem. (2019). Hermelin, Danny ; Talmon, Nimrod ; Shabtay, Dvir. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:6:d:10.1007_s10951-019-00617-7. Full description at Econpapers || Download paper | 4 |
29 | 2019 | Daily course pattern formulation and valid inequalities for the curriculum-based course timetabling problem. (2019). Bagger, Niels-Christian Fink ; Desrosiers, Jacques ; Desaulniers, Guy. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0582-0. Full description at Econpapers || Download paper | 3 |
30 | 2017 | Staff and machine shift scheduling in a German potash mine. (2017). Schulze, Marco ; Zimmermann, Jurgen. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:6:d:10.1007_s10951-017-0527-z. Full description at Econpapers || Download paper | 3 |
31 | 2020 | Flowshop scheduling with learning effect and job rejection. (2020). Mor, Baruch ; Shapira, Dana ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-019-00612-y. Full description at Econpapers || Download paper | 3 |
32 | 2016 | A genetic algorithm for the robust resource leveling problem. (2016). Li, Hongbo ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0457-6. Full description at Econpapers || Download paper | 3 |
33 | 2020 | A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering. (2020). Akbarzadeh, Babak ; Maenhout, Broos ; Reisi-Nafchi, Mohammad ; Moslehi, Ghasem. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:2:d:10.1007_s10951-020-00639-6. Full description at Econpapers || Download paper | 3 |
34 | 2020 | Mixed batch scheduling on identical machines. (2020). Wang, Jun-Qiang ; Liu, Zhixin ; Fan, Guo-Qiang . In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-019-00623-9. Full description at Econpapers || Download paper | 3 |
35 | 2019 | Scheduling recurring radiotherapy appointments in an ion beam facility. (2019). Vogl, Petra ; Doerner, Karl F ; Braune, Roland. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0574-0. Full description at Econpapers || Download paper | 3 |
36 | 2022 | Optimizing rest times and differences in games played: an iterative two-phase approach. (2022). van Bulck, David ; Goossens, Dries. In: Journal of Scheduling. RePEc:spr:jsched:v:25:y:2022:i:3:d:10.1007_s10951-021-00717-3. Full description at Econpapers || Download paper | 3 |
37 | 2019 | Parameterized complexity of a coupled-task scheduling problem. (2019). Bessy, S ; Giroudeau, R. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0581-1. Full description at Econpapers || Download paper | 3 |
38 | 2019 | Stochastic project management: multiple projects with multi-skilled human resources. (2019). Felberbauer, Thomas ; Doerner, Karl F ; Gutjahr, Walter J. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0592-y. Full description at Econpapers || Download paper | 3 |
39 | 2017 | Mathematical models for the berth allocation problem in dry bulk terminals. (2017). Ernst, Andreas T ; Taherkhani, Gita ; Singh, Gaurav ; Ouz, Ceyda. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0510-8. Full description at Econpapers || Download paper | 3 |
40 | 2017 | Scheduling shipments in closed-loop sortation conveyors. (2017). Briskorn, Dirk ; Boysen, Nils ; Emde, Simon. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0498-5. Full description at Econpapers || Download paper | 3 |
41 | 2018 | An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines. (2018). Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0546-9. Full description at Econpapers || Download paper | 3 |
42 | 2017 | An integrated model for the transshipment yard scheduling problem. (2017). Cichenski, Mateusz ; Blazewicz, Jacek ; Singh, Gaurav ; Pesch, Erwin ; Pawlak, Grzegorz ; Jaehn, Florian. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0470-4. Full description at Econpapers || Download paper | 3 |
43 | 2019 | Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints. (2019). Gyorgyi, Peter ; Kis, Tamas. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:6:d:10.1007_s10951-019-00601-1. Full description at Econpapers || Download paper | 2 |
44 | 2021 | Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty. (2021). Ma, Shoufeng ; Fu, Chenyi ; Zhu, Ning ; Li, Hongming. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:2:d:10.1007_s10951-020-00661-8. Full description at Econpapers || Download paper | 2 |
45 | 2021 | Complexity and algorithms for min cost and max profit scheduling under time-of-use electricity tariffs. (2021). Penn, Michal ; Raviv, Tal. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:1:d:10.1007_s10951-020-00674-3. Full description at Econpapers || Download paper | 2 |
46 | 2016 | A new approximation algorithm for multi-agent scheduling to minimize makespan on two machines. (2016). Zhao, Kejun ; Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0460-y. Full description at Econpapers || Download paper | 2 |
47 | 2018 | Scheduling electric vehicles and locating charging stations on a path. (2018). Boysen, Nils ; Emde, Simon ; Briskorn, Dirk. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0538-9. Full description at Econpapers || Download paper | 2 |
48 | 2021 | Stand-alone renewable power system scheduling for a green data center using integer linear programming. (2021). Haddad, Maroua ; Varnier, Christophe ; Pera, Marie-Cecile ; Nicod, Jean-Marc . In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:5:d:10.1007_s10951-021-00700-y. Full description at Econpapers || Download paper | 2 |
49 | 2021 | Column generation for minimizing total completion time in a parallel-batching environment. (2021). Alfieri, A ; Salassa, F ; Grosso, A ; Druetto, A. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00703-9. Full description at Econpapers || Download paper | 2 |
50 | 2018 | Rescheduling due to machine disruption to minimize the total weighted completion time. (2018). Luo, Wenchang ; Lin, Guohui ; Goebel, Randy. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-018-0575-z. Full description at Econpapers || Download paper | 2 |
Year | Title | |
---|---|---|
2022 | Asynchronous optimization of part logistics routing problem. (2022). Zheng, Ren ; Jin, Zhong-Xiao ; Lu, Wenlian ; Chen, Boyu ; Huang, Yaoting. In: Journal of Global Optimization. RePEc:spr:jglopt:v:82:y:2022:i:4:d:10.1007_s10898-021-01078-z. Full description at Econpapers || Download paper | |
2022 | Tight approximation bounds for the LPT rule applied to identical parallel machines with small jobs. (2022). Lee, Myungho ; Pinedo, Michael. In: Journal of Scheduling. RePEc:spr:jsched:v:25:y:2022:i:6:d:10.1007_s10951-022-00742-w. Full description at Econpapers || Download paper | |
2022 | Parallel batch scheduling: Impact of increasing machine capacity. (2022). Liu, Zhixin ; Wang, Jun-Qiang ; Xu, Jun. In: Omega. RePEc:eee:jomega:v:108:y:2022:i:c:s0305048321001766. Full description at Econpapers || Download paper | |
2022 | Competitive algorithm for scheduling of sharing machines with rental discount. (2022). Liu, Ming ; Zheng, Feifeng ; Zhi, Rongteng ; Xu, Yinfeng. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:44:y:2022:i:1:d:10.1007_s10878-021-00836-9. Full description at Econpapers || Download paper | |
2022 | A tactical multi-week implicit tour scheduling model with applications in healthcare. (2022). Aydas, Osman T ; Isken, Mark W. In: Health Care Management Science. RePEc:kap:hcarem:v:25:y:2022:i:4:d:10.1007_s10729-022-09601-8. Full description at Econpapers || Download paper | |
2022 | Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem. (2022). Fondrevelle, Julien ; Botta-Genoulaz, Valerie ; Ferreira, Jose Francisco ; Doan, Minh Phuoc. In: Post-Print. RePEc:hal:journl:hal-03119408. Full description at Econpapers || Download paper | |
2022 | Current Trends in Operating Room Scheduling 2015 to 2020: a Literature Review. (2022). Claudio, David ; Harris, Sean. In: SN Operations Research Forum. RePEc:spr:snopef:v:3:y:2022:i:1:d:10.1007_s43069-022-00134-y. Full description at Econpapers || Download paper | |
2022 | Strategic investment decisions in multi-stage contests with heterogeneous players. (2022). Sonnabend, Hendrik ; Schneemann, Sandra ; Sahm, Marco ; Deutscher, Christian. In: Theory and Decision. RePEc:kap:theord:v:93:y:2022:i:2:d:10.1007_s11238-021-09845-w. Full description at Econpapers || Download paper | |
2022 | Effort comparisons for a class of four-player tournaments. (2022). SaÄlam, ÃaÄrı ; KaragözoÄlu, Emin ; Salam, Ari ; Keskin, Kerim ; Karagozolu, Emin ; Alayan, Deren. In: Social Choice and Welfare. RePEc:spr:sochwe:v:59:y:2022:i:1:d:10.1007_s00355-021-01381-4. Full description at Econpapers || Download paper | |
2022 | Round-robin tournaments with limited resources. (2022). Dagaev, Dmitry ; Zubanov, Andrey. In: Social Choice and Welfare. RePEc:spr:sochwe:v:59:y:2022:i:3:d:10.1007_s00355-022-01402-w. Full description at Econpapers || Download paper | |
2022 | On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates. (2022). Mosheiov, Gur ; Oron, Daniel ; Shabtay, Dvir. In: Journal of Scheduling. RePEc:spr:jsched:v:25:y:2022:i:5:d:10.1007_s10951-022-00743-9. Full description at Econpapers || Download paper | |
2022 | A bi-objective hierarchical program scheduling problem and its solution based on NSGA-III. (2022). Chen, Liangwei ; Zhang, Jingwen ; Lin, Jiali ; Peng, Wuliang. In: Annals of Operations Research. RePEc:spr:annopr:v:308:y:2022:i:1:d:10.1007_s10479-021-04106-z. Full description at Econpapers || Download paper | |
2022 | New summary measures and datasets for the multi-project scheduling problem. (2022). Vanhoucke, Mario ; van Eynde, Rob. In: European Journal of Operational Research. RePEc:eee:ejores:v:299:y:2022:i:3:p:853-868. Full description at Econpapers || Download paper | |
2022 | A survey of scheduling with parallel batch (p-batch) processing. (2022). Monch, Lars ; Fowler, John W. In: European Journal of Operational Research. RePEc:eee:ejores:v:298:y:2022:i:1:p:1-24. Full description at Econpapers || Download paper | |
2022 | Twin-crane scheduling during seaside workload peaks with a dedicated handshake area. (2022). Zey, Lennart ; Boysen, Nils ; Briskorn, Dirk. In: Journal of Scheduling. RePEc:spr:jsched:v:25:y:2022:i:1:d:10.1007_s10951-021-00710-w. Full description at Econpapers || Download paper | |
2022 | Arc flow formulations based on dynamic programming: Theoretical foundations and applications. (2022). Valerio, Jose M ; Iori, Manuel ; Clautiaux, Franois ; Alves, Claudio ; de Lima, Vinicius L. In: European Journal of Operational Research. RePEc:eee:ejores:v:296:y:2022:i:1:p:3-21. Full description at Econpapers || Download paper | |
2022 | Pareto-scheduling of two competing agents with their own equal processing times. (2022). Zhang, Yuan ; Yuan, Jinjiang ; Lu, Lingfa ; Geng, Zhichao ; Chen, Rubing. In: European Journal of Operational Research. RePEc:eee:ejores:v:301:y:2022:i:2:p:414-431. Full description at Econpapers || Download paper | |
2022 | . Full description at Econpapers || Download paper | |
2022 | Minimizing total weighted late work on a single-machine with non-availability intervals. (2022). Chen, Ren-Xia ; Li, Shi-Sheng. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:44:y:2022:i:2:d:10.1007_s10878-022-00890-x. Full description at Econpapers || Download paper | |
2022 | A General Branch-and-Cut Framework for Rotating Workforce Scheduling. (2022). Walther, Grit ; Schiffer, Maximilian ; Becker, Tristan. In: INFORMS Journal on Computing. RePEc:inm:orijoc:v:34:y:2022:i:3:p:1548-1564. Full description at Econpapers || Download paper | |
2022 | Minmax common flow-allowance problems with convex resource allocation and position-dependent workloads. (2022). Mor, Baruch. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:43:y:2022:i:1:d:10.1007_s10878-021-00746-w. Full description at Econpapers || Download paper | |
2022 | Single machine scheduling to maximize the weighted number of on-time jobs with job-rejection. (2022). Mosheiov, Gur ; Mor, Baruch. In: Operational Research. RePEc:spr:operea:v:22:y:2022:i:3:d:10.1007_s12351-021-00627-4. Full description at Econpapers || Download paper | |
2022 | Speed scaling scheduling of multiprocessor jobs with energy constraint and makespan criterion. (2022). Zakharova, Yulia ; Kononov, Alexander. In: Journal of Global Optimization. RePEc:spr:jglopt:v:83:y:2022:i:3:d:10.1007_s10898-021-01115-x. Full description at Econpapers || Download paper | |
2022 | Exact solutions for the two-machine robust flow shop with budgeted uncertainty. (2022). Frota, Yuri ; Figueiredo, Rosa ; Levorato, Mario. In: European Journal of Operational Research. RePEc:eee:ejores:v:300:y:2022:i:1:p:46-57. Full description at Econpapers || Download paper | |
2022 | . Full description at Econpapers || Download paper | |
2022 | Harnessing Task Usage Prediction and Latency Sensitivity for Scheduling Workloads in Wind-Powered Data Centers. (2022). Jacobsen, Hans-Arno ; Yazidi, Anis ; Osnes, Idun ; Sartori, Sabrina ; Eliassen, Frank. In: Energies. RePEc:gam:jeners:v:15:y:2022:i:12:p:4469-:d:842632. Full description at Econpapers || Download paper | |
2022 | Scheduling a single parallel-batching machine with non-identical job sizes and incompatible job families. (2022). Yang, Fan ; Davari, Morteza ; Wei, Wenchao ; Hermans, Ben ; Leus, Roel. In: European Journal of Operational Research. RePEc:eee:ejores:v:303:y:2022:i:2:p:602-615. Full description at Econpapers || Download paper | |
2022 | Improved MILP formulation equipped with valid inequalities for scheduling a batch processing machine with non-identical job sizes. (2022). Ozturk, Onur ; Kashan, Ali Husseinzadeh ; HusseinzadehKashan, Ali . In: Omega. RePEc:eee:jomega:v:112:y:2022:i:c:s0305048322000809. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2022 | . Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2021 | Job Scheduling under Time-of-Use Energy Tariffs for Sustainable Manufacturing: A Survey. (2021). Ronco, Roberto ; Pesenti, Raffaele ; Catanzaro, Daniele. In: LIDAM Discussion Papers CORE. RePEc:cor:louvco:2021019. Full description at Econpapers || Download paper | |
2021 | . Full description at Econpapers || Download paper | |
2021 | Optimally rescheduling jobs with a Last-In-First-Out buffer. (2021). Nicosia, Gaia ; Righini, Giovanni ; Resch, Julia ; Pferschy, Ulrich ; Pacifici, Andrea. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00707-5. Full description at Econpapers || Download paper | |
2021 | Projektmanagementsoftware und Scheduling: Aktuelle Bestandsaufnahme von Funktionalitäten und Identifikation von Potenzialen. (2021). Schultmann, Frank ; Volk, Rebekka ; Winkler, Franziska ; Gehring, Marco. In: Working Paper Series in Production and Energy. RePEc:zbw:kitiip:60. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2020 | Effort Comparisons for a Class of Four-Player Tournaments. (2020). SaÄlam, ÃaÄrı ; Caglayan, Deren ; Saglam, Cagri ; Keskin, Kerim ; Karagozoglu, Emin. In: CESifo Working Paper Series. RePEc:ces:ceswps:_8761. Full description at Econpapers || Download paper | |
2020 | Strategic Manipulations in Round-Robin Tournaments. (2020). Krumer, Alex ; Megidish, Reut ; Sela, Aner. In: CEPR Discussion Papers. RePEc:cpr:ceprdp:14412. Full description at Econpapers || Download paper | |
2020 | Scheduling spatially distributed jobs with degradation: Application to pothole repair. (2020). Batta, Rajan ; Aarabi, Fatemeh. In: Socio-Economic Planning Sciences. RePEc:eee:soceps:v:72:y:2020:i:c:s0038012119304719. Full description at Econpapers || Download paper | |
2020 | . Full description at Econpapers || Download paper | |
2020 | A Framework for Capacity and Operations Planning in Services Organizations Employing Workers with Intellectual Disabilities. (2020). Ruiz, Angel ; Maheut, Julien ; Garcia-Sabater, Jose Pedro. In: Sustainability. RePEc:gam:jsusta:v:12:y:2020:i:22:p:9713-:d:448726. Full description at Econpapers || Download paper | |
2020 | . Full description at Econpapers || Download paper | |
2020 | Multiprocessor open shop problem: literature review and future directions. (2020). Adak, Zeynep ; Bulkan, Serol ; Ariolu, Mahmure Ovul. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:40:y:2020:i:2:d:10.1007_s10878-020-00591-3. Full description at Econpapers || Download paper | |
2020 | New results for an open time-dependent scheduling problem. (2020). Gawiejnowicz, Stanisaw ; Kurc, Wiesaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-020-00662-7. Full description at Econpapers || Download paper | |
2020 | Scheduling jobs with a V-shaped time-dependent processing time. (2020). Sedding, Helmut A. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-020-00665-4. Full description at Econpapers || Download paper |
Year | Citing document | |
---|---|---|
2019 | Discrete and continuous-time formulations for dealing with break periods: Preemptive and non-preemptive scheduling. (2019). Harjunkoski, Iiro ; Castro, Pedro M ; Grossmann, Ignacio E. In: European Journal of Operational Research. RePEc:eee:ejores:v:278:y:2019:i:2:p:563-577. Full description at Econpapers || Download paper | |
2019 | Managing Navigation Channel Traffic and Anchorage Area Utilization of a Container Port. (2019). Xu, Zhou ; Li, Chung-Lun ; Jia, Shuai. In: Transportation Science. RePEc:inm:ortrsc:v:53:y:2019:i:3:p:728-745. Full description at Econpapers || Download paper |