Is this page useful for you? Then, help us to keep the service working. Please have a look to our donations page ... Thanks for your help!!

Citation Profile [Updated: 2024-11-03 20:16:59]
5 Years H Index
9
Impact Factor (IF)
0.32
5 Years IF
0.36
Data available in this report

[Raw data] [50 most cited papers] [50 most relevant papers] [cites used to compute IF] [Recent citations ][Frequent citing series ] [more data in EconPapers] [trace new citations] [Missing citations? Add them now] [Incorrect content? Let us know]

Main indicators
Raw Data

 

IF AIF CIF IF5 DOC CDO CIT NCI CCU D2Y C2Y D5Y C5Y SC %SC CiY II AII
2016 0 0.53 0.08 0 24 24 113 2 2 0 0 0 2 0.08 0.21
2017 0.79 0.54 0.28 0.79 45 69 142 19 21 24 19 24 19 0 0 0.22
2018 0.39 0.55 0.25 0.39 46 115 88 29 50 69 27 69 27 5 17.2 2 0.04 0.24
2019 0.48 0.57 0.37 0.48 46 161 94 59 110 91 44 115 55 7 11.9 2 0.04 0.23
2020 0.2 0.68 0.36 0.36 47 208 90 75 185 92 18 161 58 19 25.3 9 0.19 0.32
2021 0.33 0.81 0.36 0.32 41 249 26 89 274 93 31 208 67 24 27 4 0.1 0.3
2022 0.32 0.86 0.38 0.36 41 290 20 110 384 88 28 225 80 16 14.5 1 0.02 0.26
2023 0.32 0.92 0.49 0.36 32 322 16 159 543 82 26 221 79 29 18.2 6 0.19 0.27
IF: Two years Impact Factor: C2Y / D2Y
AIF: Average Impact Factor for all series in RePEc in year y
CIF: Cumulative impact factor
IF5: Five years Impact Factor: C5Y / D5Y
DOC: Number of documents published in year y
CDO: Cumulative number of documents published until year y
CIT: Number of citations to papers published in year y
NCI: Number of citations in year y
CCU: Cumulative number of citations to papers published until year y
D2Y: Number of articles published in y-1 plus y-2
C2Y: Cites in y to articles published in y-1 plus y-2
D5Y: Number of articles published in y-1 until y-5
C5Y: Cites in y to articles published in y-1 until y-5
SC: selft citations in y to articles published in y-1 plus y-2
%SC: Percentage of selft citations in y to articles published in y-1 plus y-2
CiY: Cites in year y to documents published in year y
II: Immediacy Index: CiY / Documents.
AII: Average Immediacy Index for series in RePEc in year y
50 most cited documents in this series
#YearTitleCited
12016Scheduling operating rooms: achievements, challenges and pitfalls. (2016). Cardoen, Brecht ; Rademakers, Frank E ; Vansteenkiste, Nancy ; Demeulemeester, Erik ; van Riet, Carla ; Samudra, Michael . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:5:d:10.1007_s10951-016-0489-6.

Full description at Econpapers || Download paper

44
22017Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs. (2017). Madas, Michael A ; Androutsopoulos, Konstantinos N ; Zografos, Konstantinos G. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0496-7.

Full description at Econpapers || Download paper

23
32016Scheduling for electricity cost in a smart grid. (2016). , Prudence ; Hon, Wing-Kai ; Liu, Hsiang-Hsuan ; David, ; Burcea, Mihai . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0447-8.

Full description at Econpapers || Download paper

22
42017Real-time management of berth allocation with stochastic arrival and handling times. (2017). Umang, Nitish ; Erera, Alan L ; Bierlaire, Michel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0480-2.

Full description at Econpapers || Download paper

20
52020The optimal design of round-robin tournaments with three players. (2020). Krumer, Alex ; Sela, Aner ; Megidish, Reut. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-019-00624-8.

Full description at Econpapers || Download paper

15
62016Scheduling on parallel identical machines with late work criterion: Offline and online cases. (2016). Blazewicz, Jacek ; Han, Xin ; Sterna, Malgorzata ; Chen, Xin. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0464-7.

Full description at Econpapers || Download paper

14
72020Single-machine scheduling with multi-agents to minimize total weighted late work. (2020). Li, Shi-Sheng ; Yuan, Jin-Jiang. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-020-00646-7.

Full description at Econpapers || Download paper

12
82017Mathematical models for the berth allocation problem in dry bulk terminals. (2017). Ernst, Andreas T ; Taherkhani, Gita ; Singh, Gaurav ; Ouz, Ceyda. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0510-8.

Full description at Econpapers || Download paper

12
92019The proactive and reactive resource-constrained project scheduling problem. (2019). Davari, Morteza ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-017-0553-x.

Full description at Econpapers || Download paper

9
102019Journal of scheduling (2019). (2019). Burke, Edmund ; Pinedo, Michael. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-019-00603-z.

Full description at Econpapers || Download paper

9
112018A survey on how the structure of precedence constraints may change the complexity class of scheduling problems. (2018). Prot, D ; Bellenguez-Morineau, O. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0519-z.

Full description at Econpapers || Download paper

9
122020A review of four decades of time-dependent scheduling: main results, new topics, and open problems. (2020). Gawiejnowicz, Stanisaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:1:d:10.1007_s10951-019-00630-w.

Full description at Econpapers || Download paper

9
132018Case mix classification and a benchmark set for surgery scheduling. (2018). Leeftink, Greanne ; Hans, Erwin W. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0539-8.

Full description at Econpapers || Download paper

9
142020Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling. (2020). Eynde, Rob ; Vanhoucke, Mario. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00651-w.

Full description at Econpapers || Download paper

8
152017Scheduling shipments in closed-loop sortation conveyors. (2017). Briskorn, Dirk ; Boysen, Nils ; Emde, Simon. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0498-5.

Full description at Econpapers || Download paper

8
162017A parameterized complexity view on non-preemptively scheduling interval-constrained jobs: few machines, small looseness, and small slack. (2017). Bevern, Rene ; Such, Ondej ; Niedermeier, Rolf. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0478-9.

Full description at Econpapers || Download paper

8
172018New strategies for stochastic resource-constrained project scheduling. (2018). Rostami, Salim ; Leus, Roel ; Creemers, Stefan. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:3:d:10.1007_s10951-016-0505-x.

Full description at Econpapers || Download paper

7
182019The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs. (2019). Chen, Rubing ; Gao, Yuan ; Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0598-5.

Full description at Econpapers || Download paper

7
192017An exact extended formulation for the unrelated parallel machine total weighted completion time problem. (2017). Bulbul, Kerem ; En, Halil. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-016-0485-x.

Full description at Econpapers || Download paper

7
202019A unified heuristic and an annotated bibliography for a large class of earliness–tardiness scheduling problems. (2019). Kramer, Arthur ; Subramanian, Anand. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-017-0549-6.

Full description at Econpapers || Download paper

7
212017Unary NP-hardness of minimizing the number of tardy jobs with deadlines. (2017). Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:2:d:10.1007_s10951-016-0479-8.

Full description at Econpapers || Download paper

7
222019A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem. (2019). Hill, Alessandro ; Goycoolea, Marcos ; Voss, Stefan ; Lalla-Ruiz, Eduardo. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0578-9.

Full description at Econpapers || Download paper

7
232018Approaches to modeling train scheduling problems as job-shop problems with blocking constraints. (2018). Lange, Julia ; Werner, Frank. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0526-0.

Full description at Econpapers || Download paper

7
242019Scheduling and rescheduling elective patients in operating rooms to minimise the percentage of tardy patients. (2019). Ballestin, Francisco ; Quintanilla, Sacramento ; Perez, Angeles. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0570-4.

Full description at Econpapers || Download paper

7
252017Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs. (2017). Wu, Chin-Chia ; Wang, Du-Juan ; Yin, Yunqiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-017-0511-7.

Full description at Econpapers || Download paper

6
262016A genetic algorithm for the robust resource leveling problem. (2016). Li, Hongbo ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0457-6.

Full description at Econpapers || Download paper

6
272018Scheduling electric vehicles and locating charging stations on a path. (2018). Boysen, Nils ; Emde, Simon ; Briskorn, Dirk. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0538-9.

Full description at Econpapers || Download paper

6
282018Integrated production and outbound distribution scheduling problems with job release dates and deadlines. (2018). Fu, Liang-Liang ; Artigues, Christian ; Aloulou, Mohamed Ali. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:4:d:10.1007_s10951-017-0542-0.

Full description at Econpapers || Download paper

6
292020Single machine scheduling to maximize the number of on-time jobs with generalized due-dates. (2020). Gerstl, Enrique ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00638-7.

Full description at Econpapers || Download paper

6
302020Flowshop scheduling with learning effect and job rejection. (2020). Mor, Baruch ; Shapira, Dana ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-019-00612-y.

Full description at Econpapers || Download paper

6
312018An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines. (2018). Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0546-9.

Full description at Econpapers || Download paper

5
322018Combining two-stage stochastic programming and recoverable robustness to minimize the number of late jobs in the case of uncertain processing times. (2018). Akker, Marjan ; Stoef, Judith ; Hoogeveen, Han. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:6:d:10.1007_s10951-018-0559-z.

Full description at Econpapers || Download paper

5
332019On the parameterized tractability of the just-in-time flow-shop scheduling problem. (2019). Hermelin, Danny ; Talmon, Nimrod ; Shabtay, Dvir. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:6:d:10.1007_s10951-019-00617-7.

Full description at Econpapers || Download paper

5
342017Staff and machine shift scheduling in a German potash mine. (2017). Schulze, Marco ; Zimmermann, Jurgen. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:6:d:10.1007_s10951-017-0527-z.

Full description at Econpapers || Download paper

5
352018A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines. (2018). Tan, YI ; Fowler, John W ; Monch, Lars. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0530-4.

Full description at Econpapers || Download paper

5
362016A survey of offline algorithms for energy minimization under deadline constraints. (2016). , Marco ; Hurink, Johann L. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0463-8.

Full description at Econpapers || Download paper

5
372019Stochastic project management: multiple projects with multi-skilled human resources. (2019). Felberbauer, Thomas ; Doerner, Karl F ; Gutjahr, Walter J. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0592-y.

Full description at Econpapers || Download paper

5
382017Finding an optimal Nash equilibrium to the multi-agent project scheduling problem. (2017). Briand, Cyril ; Cha, Pemysl ; Ngueveu, Sandra Ulrich. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0516-2.

Full description at Econpapers || Download paper

5
392016A new approximation algorithm for multi-agent scheduling to minimize makespan on two machines. (2016). Zhao, Kejun ; Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0460-y.

Full description at Econpapers || Download paper

5
402017Scheduling reclaimers serving a stock pad at a coal terminal. (2017). Kalinowski, Thomas ; Martin, ; Kapoor, Reena . In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0495-8.

Full description at Econpapers || Download paper

5
412023Optimization of scheduling problems with deterioration effects and an optional maintenance activity. (2023). Xu, Jing-Xiao ; Hu, Yang ; Geng, Xin-Na ; Liu, Tao ; Sun, Xinyu. In: Journal of Scheduling. RePEc:spr:jsched:v:26:y:2023:i:3:d:10.1007_s10951-022-00756-4.

Full description at Econpapers || Download paper

5
422019Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs. (2019). Hung, Hui-Chih ; Wei, Jun-Min ; Posner, Marc E. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:4:d:10.1007_s10951-018-0584-y.

Full description at Econpapers || Download paper

5
432018Scheduling meets n-fold integer programming. (2018). Knop, Duan ; Kouteck, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0550-0.

Full description at Econpapers || Download paper

5
442021Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty. (2021). Ma, Shoufeng ; Fu, Chenyi ; Zhu, Ning ; Li, Hongming. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:2:d:10.1007_s10951-020-00661-8.

Full description at Econpapers || Download paper

4
452017Optimizing railway crew schedules with fairness preferences. (2017). Jutte, Silke ; Thonemann, Ulrich W ; Muller, Daniel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0499-4.

Full description at Econpapers || Download paper

4
462017Continuous-time production, distribution and financial planning with periodic liquidity balancing. (2017). Albrecht, Wolfgang ; Steinrucke, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0488-7.

Full description at Econpapers || Download paper

4
472017An integrated model for the transshipment yard scheduling problem. (2017). Cichenski, Mateusz ; Blazewicz, Jacek ; Singh, Gaurav ; Pesch, Erwin ; Pawlak, Grzegorz ; Jaehn, Florian. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0470-4.

Full description at Econpapers || Download paper

4
482019Single-machine common due date total earliness/tardiness scheduling with machine unavailability. (2019). Bulbul, Kerem ; En, Halil ; Kedad-Sidhoum, Safia. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0585-x.

Full description at Econpapers || Download paper

4
492017An exact algorithm for parallel machine scheduling with conflicts. (2017). Kowalczyk, Daniel ; Leus, Roel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-016-0482-0.

Full description at Econpapers || Download paper

4
502019Inductive $$k$$ k -independent graphs and c-colorable subgraphs in scheduling: a review. (2019). Bentert, Matthias ; Niedermeier, Rolf ; Bevern, Rene . In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0595-8.

Full description at Econpapers || Download paper

4
50 most relevant documents in this series (papers most cited in the last two years)
#YearTitleCited
12016Scheduling operating rooms: achievements, challenges and pitfalls. (2016). Cardoen, Brecht ; Rademakers, Frank E ; Vansteenkiste, Nancy ; Demeulemeester, Erik ; van Riet, Carla ; Samudra, Michael . In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:5:d:10.1007_s10951-016-0489-6.

Full description at Econpapers || Download paper

16
22017Real-time management of berth allocation with stochastic arrival and handling times. (2017). Umang, Nitish ; Erera, Alan L ; Bierlaire, Michel. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0480-2.

Full description at Econpapers || Download paper

10
32020The optimal design of round-robin tournaments with three players. (2020). Krumer, Alex ; Sela, Aner ; Megidish, Reut. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-019-00624-8.

Full description at Econpapers || Download paper

9
42017Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs. (2017). Madas, Michael A ; Androutsopoulos, Konstantinos N ; Zografos, Konstantinos G. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0496-7.

Full description at Econpapers || Download paper

8
52020Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling. (2020). Eynde, Rob ; Vanhoucke, Mario. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00651-w.

Full description at Econpapers || Download paper

7
62020Single-machine scheduling with multi-agents to minimize total weighted late work. (2020). Li, Shi-Sheng ; Yuan, Jin-Jiang. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-020-00646-7.

Full description at Econpapers || Download paper

7
72019Scheduling and rescheduling elective patients in operating rooms to minimise the percentage of tardy patients. (2019). Ballestin, Francisco ; Quintanilla, Sacramento ; Perez, Angeles. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0570-4.

Full description at Econpapers || Download paper

6
82020Flowshop scheduling with learning effect and job rejection. (2020). Mor, Baruch ; Shapira, Dana ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-019-00612-y.

Full description at Econpapers || Download paper

6
92016Scheduling on parallel identical machines with late work criterion: Offline and online cases. (2016). Blazewicz, Jacek ; Han, Xin ; Sterna, Malgorzata ; Chen, Xin. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:6:d:10.1007_s10951-015-0464-7.

Full description at Econpapers || Download paper

6
102018Case mix classification and a benchmark set for surgery scheduling. (2018). Leeftink, Greanne ; Hans, Erwin W. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0539-8.

Full description at Econpapers || Download paper

5
112023Optimization of scheduling problems with deterioration effects and an optional maintenance activity. (2023). Xu, Jing-Xiao ; Hu, Yang ; Geng, Xin-Na ; Liu, Tao ; Sun, Xinyu. In: Journal of Scheduling. RePEc:spr:jsched:v:26:y:2023:i:3:d:10.1007_s10951-022-00756-4.

Full description at Econpapers || Download paper

5
122019Stochastic project management: multiple projects with multi-skilled human resources. (2019). Felberbauer, Thomas ; Doerner, Karl F ; Gutjahr, Walter J. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0592-y.

Full description at Econpapers || Download paper

5
132019On the parameterized tractability of the just-in-time flow-shop scheduling problem. (2019). Hermelin, Danny ; Talmon, Nimrod ; Shabtay, Dvir. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:6:d:10.1007_s10951-019-00617-7.

Full description at Econpapers || Download paper

5
142020A review of four decades of time-dependent scheduling: main results, new topics, and open problems. (2020). Gawiejnowicz, Stanisaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:1:d:10.1007_s10951-019-00630-w.

Full description at Econpapers || Download paper

5
152019The proactive and reactive resource-constrained project scheduling problem. (2019). Davari, Morteza ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-017-0553-x.

Full description at Econpapers || Download paper

5
162020Single machine scheduling to maximize the number of on-time jobs with generalized due-dates. (2020). Gerstl, Enrique ; Mosheiov, Gur. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:3:d:10.1007_s10951-020-00638-7.

Full description at Econpapers || Download paper

5
172021Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty. (2021). Ma, Shoufeng ; Fu, Chenyi ; Zhu, Ning ; Li, Hongming. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:2:d:10.1007_s10951-020-00661-8.

Full description at Econpapers || Download paper

4
182019Journal of scheduling (2019). (2019). Burke, Edmund ; Pinedo, Michael. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-019-00603-z.

Full description at Econpapers || Download paper

4
192018Integrated production and outbound distribution scheduling problems with job release dates and deadlines. (2018). Fu, Liang-Liang ; Artigues, Christian ; Aloulou, Mohamed Ali. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:4:d:10.1007_s10951-017-0542-0.

Full description at Econpapers || Download paper

4
202016A genetic algorithm for the robust resource leveling problem. (2016). Li, Hongbo ; Demeulemeester, Erik. In: Journal of Scheduling. RePEc:spr:jsched:v:19:y:2016:i:1:d:10.1007_s10951-015-0457-6.

Full description at Econpapers || Download paper

4
212019Inductive $$k$$ k -independent graphs and c-colorable subgraphs in scheduling: a review. (2019). Bentert, Matthias ; Niedermeier, Rolf ; Bevern, Rene . In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0595-8.

Full description at Econpapers || Download paper

4
222019A unified heuristic and an annotated bibliography for a large class of earliness–tardiness scheduling problems. (2019). Kramer, Arthur ; Subramanian, Anand. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-017-0549-6.

Full description at Econpapers || Download paper

4
232018A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines. (2018). Tan, YI ; Fowler, John W ; Monch, Lars. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0530-4.

Full description at Econpapers || Download paper

4
242019Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs. (2019). Hung, Hui-Chih ; Wei, Jun-Min ; Posner, Marc E. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:4:d:10.1007_s10951-018-0584-y.

Full description at Econpapers || Download paper

4
252017Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs. (2017). Wu, Chin-Chia ; Wang, Du-Juan ; Yin, Yunqiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-017-0511-7.

Full description at Econpapers || Download paper

4
262020Mixed batch scheduling on identical machines. (2020). Wang, Jun-Qiang ; Liu, Zhixin ; Fan, Guo-Qiang . In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-019-00623-9.

Full description at Econpapers || Download paper

4
272018Approaches to modeling train scheduling problems as job-shop problems with blocking constraints. (2018). Lange, Julia ; Werner, Frank. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:2:d:10.1007_s10951-017-0526-0.

Full description at Econpapers || Download paper

4
282019The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs. (2019). Chen, Rubing ; Gao, Yuan ; Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0598-5.

Full description at Econpapers || Download paper

4
292017Scheduling shipments in closed-loop sortation conveyors. (2017). Briskorn, Dirk ; Boysen, Nils ; Emde, Simon. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:1:d:10.1007_s10951-016-0498-5.

Full description at Econpapers || Download paper

4
302017Mathematical models for the berth allocation problem in dry bulk terminals. (2017). Ernst, Andreas T ; Taherkhani, Gita ; Singh, Gaurav ; Ouz, Ceyda. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:5:d:10.1007_s10951-017-0510-8.

Full description at Econpapers || Download paper

3
312018New strategies for stochastic resource-constrained project scheduling. (2018). Rostami, Salim ; Leus, Roel ; Creemers, Stefan. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:3:d:10.1007_s10951-016-0505-x.

Full description at Econpapers || Download paper

3
322022A mixed-integer programming approach for solving university course timetabling problems. (2022). Heche, Jean-Franois ; Robert, Stephan ; Thiemard, Eric ; Rappos, Efstratios. In: Journal of Scheduling. RePEc:spr:jsched:v:25:y:2022:i:4:d:10.1007_s10951-021-00715-5.

Full description at Econpapers || Download paper

3
332019A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem. (2019). Hill, Alessandro ; Goycoolea, Marcos ; Voss, Stefan ; Lalla-Ruiz, Eduardo. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0578-9.

Full description at Econpapers || Download paper

3
342023Parallel solutions for preemptive makespan scheduling on two identical machines. (2023). Epstein, Leah. In: Journal of Scheduling. RePEc:spr:jsched:v:26:y:2023:i:1:d:10.1007_s10951-022-00764-4.

Full description at Econpapers || Download paper

3
352020The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers. (2020). Kiermaier, Ferdinand ; Bard, Jonathan F ; Frey, Markus. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:2:d:10.1007_s10951-019-00635-5.

Full description at Econpapers || Download paper

3
362020On the exact solution of a large class of parallel machine scheduling problems. (2020). Bulhes, Teobaldo ; Uchoa, Eduardo ; Subramanian, Anand ; Sadykov, Ruslan. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:4:d:10.1007_s10951-020-00640-z.

Full description at Econpapers || Download paper

3
372019Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteria. (2019). Yin, Yunqiang ; Wang, Dujuan ; Qin, Kaida ; Chen, Youhua. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0583-z.

Full description at Econpapers || Download paper

3
382018A survey on how the structure of precedence constraints may change the complexity class of scheduling problems. (2018). Prot, D ; Bellenguez-Morineau, O. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:1:d:10.1007_s10951-017-0519-z.

Full description at Econpapers || Download paper

3
392018An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines. (2018). Gu, Manzhan ; Lu, Xiwen. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0546-9.

Full description at Econpapers || Download paper

3
402021Stand-alone renewable power system scheduling for a green data center using integer linear programming. (2021). Haddad, Maroua ; Varnier, Christophe ; Pera, Marie-Cecile ; Nicod, Jean-Marc . In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:5:d:10.1007_s10951-021-00700-y.

Full description at Econpapers || Download paper

3
412022Optimizing rest times and differences in games played: an iterative two-phase approach. (2022). van Bulck, David ; Goossens, Dries. In: Journal of Scheduling. RePEc:spr:jsched:v:25:y:2022:i:3:d:10.1007_s10951-021-00717-3.

Full description at Econpapers || Download paper

3
422020A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering. (2020). Akbarzadeh, Babak ; Maenhout, Broos ; Reisi-Nafchi, Mohammad ; Moslehi, Ghasem. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:2:d:10.1007_s10951-020-00639-6.

Full description at Econpapers || Download paper

3
432019Single-machine common due date total earliness/tardiness scheduling with machine unavailability. (2019). Bulbul, Kerem ; En, Halil ; Kedad-Sidhoum, Safia. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:5:d:10.1007_s10951-018-0585-x.

Full description at Econpapers || Download paper

3
442017A parameterized complexity view on non-preemptively scheduling interval-constrained jobs: few machines, small looseness, and small slack. (2017). Bevern, Rene ; Such, Ondej ; Niedermeier, Rolf. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:3:d:10.1007_s10951-016-0478-9.

Full description at Econpapers || Download paper

3
452021Column generation for minimizing total completion time in a parallel-batching environment. (2021). Alfieri, A ; Salassa, F ; Grosso, A ; Druetto, A. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00703-9.

Full description at Econpapers || Download paper

3
462018Scheduling meets n-fold integer programming. (2018). Knop, Duan ; Kouteck, Martin. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:5:d:10.1007_s10951-017-0550-0.

Full description at Econpapers || Download paper

3
472018Combining two-stage stochastic programming and recoverable robustness to minimize the number of late jobs in the case of uncertain processing times. (2018). Akker, Marjan ; Stoef, Judith ; Hoogeveen, Han. In: Journal of Scheduling. RePEc:spr:jsched:v:21:y:2018:i:6:d:10.1007_s10951-018-0559-z.

Full description at Econpapers || Download paper

3
482017Unary NP-hardness of minimizing the number of tardy jobs with deadlines. (2017). Yuan, Jinjiang. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:2:d:10.1007_s10951-016-0479-8.

Full description at Econpapers || Download paper

3
492019Scheduling recurring radiotherapy appointments in an ion beam facility. (2019). Vogl, Petra ; Doerner, Karl F ; Braune, Roland. In: Journal of Scheduling. RePEc:spr:jsched:v:22:y:2019:i:2:d:10.1007_s10951-018-0574-0.

Full description at Econpapers || Download paper

3
502017Staff and machine shift scheduling in a German potash mine. (2017). Schulze, Marco ; Zimmermann, Jurgen. In: Journal of Scheduling. RePEc:spr:jsched:v:20:y:2017:i:6:d:10.1007_s10951-017-0527-z.

Full description at Econpapers || Download paper

3
Citing documents used to compute impact factor: 26
YearTitle
2023A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems. (2023). Kyparisis, George J ; Koulamas, Christos. In: European Journal of Operational Research. RePEc:eee:ejores:v:305:y:2023:i:3:p:999-1017.

Full description at Econpapers || Download paper

2023Single machine scheduling with due date assignment to minimize the total weighted lead time penalty and late work. (2023). Baewicz, Jacek ; Sterna, Magorzata ; Wang, Jun-Qiang ; Sang, Yao-Wen. In: Omega. RePEc:eee:jomega:v:121:y:2023:i:c:s0305048323000877.

Full description at Econpapers || Download paper

2023Job scheduling under Time-of-Use energy tariffs for sustainable manufacturing: a survey. (2023). Ronco, Roberto ; Pesenti, Raffaele ; Catanzaro, Daniele. In: European Journal of Operational Research. RePEc:eee:ejores:v:308:y:2023:i:3:p:1091-1109.

Full description at Econpapers || Download paper

2023Simultaneous operation of next-generation and traditional quay cranes at container terminals. (2023). , Joseph ; Diabat, Ali ; Kasm, Omar Abou. In: European Journal of Operational Research. RePEc:eee:ejores:v:308:y:2023:i:3:p:1110-1125.

Full description at Econpapers || Download paper

2023Optimization with uncertainties: a scheduling example. (2023). Bakon, Krisztian Attila ; Hegyhati, Mate ; Holczinger, Tibor. In: Central European Journal of Operations Research. RePEc:spr:cejnor:v:31:y:2023:i:4:d:10.1007_s10100-023-00854-4.

Full description at Econpapers || Download paper

2023Approximation algorithms for coupled task scheduling minimizing the sum of completion times. (2023). Gyorgyi, Peter ; Fischer, David. In: Annals of Operations Research. RePEc:spr:annopr:v:328:y:2023:i:2:d:10.1007_s10479-023-05322-5.

Full description at Econpapers || Download paper

20230-1 mathematical programming models for flexible process planning. (2023). Sun, Jianfei ; Li, Liheng ; Shen, Guangya ; Luo, Kaiping. In: European Journal of Operational Research. RePEc:eee:ejores:v:308:y:2023:i:3:p:1160-1175.

Full description at Econpapers || Download paper

2023Sustainability analysis of zero energy consumption data centers with free cooling, waste heat reuse and renewable energy systems: A feasibility study. (2023). Eicker, Ursula ; Gokul, Furkan ; Guul, Gul Nihal. In: Energy. RePEc:eee:energy:v:262:y:2023:i:pb:s0360544222023775.

Full description at Econpapers || Download paper

2023Development of a PV/Battery Micro-Grid for a Data Center in Bangladesh: Resilience and Sustainability Analysis. (2023). Hossain, Nazia ; Mezbahul, S M ; Akter, Asma ; Urooj, Shabana. In: Sustainability. RePEc:gam:jsusta:v:15:y:2023:i:22:p:15691-:d:1275541.

Full description at Econpapers || Download paper

2023Single machine scheduling problems involving job-dependent step-deterioration dates and job rejection. (2023). Mor, Baruch. In: Operational Research. RePEc:spr:operea:v:23:y:2023:i:1:d:10.1007_s12351-023-00754-0.

Full description at Econpapers || Download paper

2023Algorithms for rescheduling jobs with a LIFO buffer to minimize the weighted number of late jobs. (2023). Righini, Giovanni ; Resch, Julia ; Pferschy, Ulrich. In: Journal of Scheduling. RePEc:spr:jsched:v:26:y:2023:i:3:d:10.1007_s10951-022-00751-9.

Full description at Econpapers || Download paper

2023Educational timetabling: Problems, benchmarks, and state-of-the-art results. (2023). Schaerf, Andrea ; di Gaspero, Luca ; Ceschia, Sara. In: European Journal of Operational Research. RePEc:eee:ejores:v:308:y:2023:i:1:p:1-18.

Full description at Econpapers || Download paper

2023Nurse rostering with fatigue modelling. (2023). Wallace, Mark ; Senthooran, Ilankaikone ; Klyve, Kjartan Kastet. In: Health Care Management Science. RePEc:kap:hcarem:v:26:y:2023:i:1:d:10.1007_s10729-022-09613-4.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

2023Introducing TimPassLib – A Library for Integrated Periodic Timetabling and Passenger Routing. (2023). Lindner, Niels ; Goerigk, Marc ; Schiewe, Philine. In: SN Operations Research Forum. RePEc:spr:snopef:v:4:y:2023:i:3:d:10.1007_s43069-023-00244-1.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

2023
2023A traditional Benders’ approach to sports timetabling. (2023). Goossens, Dries ; van Bulck, David. In: European Journal of Operational Research. RePEc:eee:ejores:v:307:y:2023:i:2:p:813-826.

Full description at Econpapers || Download paper

2023Round-robin scheduling with regard to rest differences. (2023). Atan, Tankut ; Avdarolu, Burak ; Tuffaha, Tasbih. In: TOP: An Official Journal of the Spanish Society of Statistics and Operations Research. RePEc:spr:topjnl:v:31:y:2023:i:2:d:10.1007_s11750-022-00637-1.

Full description at Econpapers || Download paper

2023Strategies for dealing with uncertainty in time-relaxed sports timetabling. (2023). Goossens, Dries ; Yi, Xiajie. In: Annals of Operations Research. RePEc:spr:annopr:v:320:y:2023:i:1:d:10.1007_s10479-022-04957-0.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

2023The international timetabling competition on sports timetabling (ITC2021). (2023). Goossens, Dries ; van Bulck, David. In: European Journal of Operational Research. RePEc:eee:ejores:v:308:y:2023:i:3:p:1249-1267.

Full description at Econpapers || Download paper

2023A matheuristic for customized multi-level multi-criteria university timetabling. (2023). Nickel, Stefan ; Dunke, Fabian. In: Annals of Operations Research. RePEc:spr:annopr:v:328:y:2023:i:2:d:10.1007_s10479-023-05325-2.

Full description at Econpapers || Download paper

2023Problems and Solution Methods of Machine Scheduling in Semiconductor Manufacturing Operations: A Survey. (2023). Lim, Andrew ; Cheang, Brenda ; Fang, Jianxin. In: Sustainability. RePEc:gam:jsusta:v:15:y:2023:i:17:p:13012-:d:1228106.

Full description at Econpapers || Download paper

2023Online scheduling on parallel-batch machines with periodic availability constraints and job delivery. (2023). Oulamara, Ammar ; Wang, Jun-Qiang ; Lin, Ran. In: Omega. RePEc:eee:jomega:v:116:y:2023:i:c:s0305048322002109.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

Recent citations
Recent citations received in 2023

YearCiting document
2023.

Full description at Econpapers || Download paper

2023.

Full description at Econpapers || Download paper

2023The balanced maximally diverse grouping problem with integer attribute values. (2023). Schulz, Arne. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:45:y:2023:i:5:d:10.1007_s10878-023-01061-2.

Full description at Econpapers || Download paper

2023An online joint replenishment problem combined with single machine scheduling. (2023). Tamasi, Timea ; Kis, Tamas ; Gyorgyi, Peter. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:45:y:2023:i:5:d:10.1007_s10878-023-01064-z.

Full description at Econpapers || Download paper

2023Parallel solutions for ordinal scheduling with a small number of machines. (2023). Epstein, Leah. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:46:y:2023:i:1:d:10.1007_s10878-023-01069-8.

Full description at Econpapers || Download paper

2023Scheduling problems with rejection to minimize the k-th power of the makespan plus the total rejection cost. (2023). Zhang, Liqi ; Lu, Lingfa. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:46:y:2023:i:1:d:10.1007_s10878-023-01074-x.

Full description at Econpapers || Download paper

Recent citations received in 2022

YearCiting document
2022.

Full description at Econpapers || Download paper

Recent citations received in 2021

YearCiting document
2021Job Scheduling under Time-of-Use Energy Tariffs for Sustainable Manufacturing: A Survey. (2021). Ronco, Roberto ; Pesenti, Raffaele ; Catanzaro, Daniele. In: LIDAM Discussion Papers CORE. RePEc:cor:louvco:2021019.

Full description at Econpapers || Download paper

2021.

Full description at Econpapers || Download paper

2021Optimally rescheduling jobs with a Last-In-First-Out buffer. (2021). Nicosia, Gaia ; Righini, Giovanni ; Resch, Julia ; Pferschy, Ulrich ; Pacifici, Andrea. In: Journal of Scheduling. RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00707-5.

Full description at Econpapers || Download paper

2021Projektmanagementsoftware und Scheduling: Aktuelle Bestandsaufnahme von Funktionalitäten und Identifikation von Potenzialen. (2021). Schultmann, Frank ; Volk, Rebekka ; Winkler, Franziska ; Gehring, Marco. In: Working Paper Series in Production and Energy. RePEc:zbw:kitiip:60.

Full description at Econpapers || Download paper

Recent citations received in 2020

YearCiting document
2020Effort Comparisons for a Class of Four-Player Tournaments. (2020). Sağlam, Çağrı ; Caglayan, Deren ; Saglam, Cagri ; Keskin, Kerim ; Karagozoglu, Emin. In: CESifo Working Paper Series. RePEc:ces:ceswps:_8761.

Full description at Econpapers || Download paper

2020Strategic Manipulations in Round-Robin Tournaments. (2020). Krumer, Alex ; Megidish, Reut ; Sela, Aner. In: CEPR Discussion Papers. RePEc:cpr:ceprdp:14412.

Full description at Econpapers || Download paper

2020Scheduling spatially distributed jobs with degradation: Application to pothole repair. (2020). Batta, Rajan ; Aarabi, Fatemeh. In: Socio-Economic Planning Sciences. RePEc:eee:soceps:v:72:y:2020:i:c:s0038012119304719.

Full description at Econpapers || Download paper

2020.

Full description at Econpapers || Download paper

2020A Framework for Capacity and Operations Planning in Services Organizations Employing Workers with Intellectual Disabilities. (2020). Ruiz, Angel ; Maheut, Julien ; Garcia-Sabater, Jose Pedro. In: Sustainability. RePEc:gam:jsusta:v:12:y:2020:i:22:p:9713-:d:448726.

Full description at Econpapers || Download paper

2020.

Full description at Econpapers || Download paper

2020Multiprocessor open shop problem: literature review and future directions. (2020). Adak, Zeynep ; Bulkan, Serol ; Ariolu, Mahmure Ovul. In: Journal of Combinatorial Optimization. RePEc:spr:jcomop:v:40:y:2020:i:2:d:10.1007_s10878-020-00591-3.

Full description at Econpapers || Download paper

2020New results for an open time-dependent scheduling problem. (2020). Gawiejnowicz, Stanisaw ; Kurc, Wiesaw. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-020-00662-7.

Full description at Econpapers || Download paper

2020Scheduling jobs with a V-shaped time-dependent processing time. (2020). Sedding, Helmut A. In: Journal of Scheduling. RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-020-00665-4.

Full description at Econpapers || Download paper