16
H index
22
i10 index
663
Citations
Vlerick Business School | 16 H index 22 i10 index 663 Citations RESEARCH PRODUCTION: 62 Articles 56 Papers 6 Books 53 Chapters RESEARCH ACTIVITY:
MORE DETAILS IN: ABOUT THIS REPORT:
|
Works with: Authors registered in RePEc who have co-authored more than one work in the last five years with Mario Vanhoucke. | Is cited by: | Cites to: |
Journals with more than one article published | # docs |
---|---|
European Journal of Operational Research | 32 |
Omega | 8 |
Annals of Operations Research | 4 |
International Journal of Production Research | 4 |
Journal of the Operational Research Society | 3 |
Working Papers Series with more than one paper published | # docs |
---|---|
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium / Ghent University, Faculty of Economics and Business Administration | 56 |
Year | Title of citing document |
---|---|
2024 | On the project risk baseline: integrating aleatory uncertainty into project scheduling. (2024). Gonzalez-Varona, Jose M ; Pajares, Javier ; Acebes, Fernando ; Poza, David ; Lopez-Paredes, Adolfo. In: Papers. RePEc:arx:papers:2406.00077. Full description at Econpapers || Download paper |
2024 | Project Risk Management from the bottom-up: Activity Risk Index. (2024). Gonzalez-Varona, Jose M ; Pajares, Javier ; Acebes, Fernando ; Lopez-Paredes, Adolfo. In: Papers. RePEc:arx:papers:2406.00078. Full description at Econpapers || Download paper |
2024 | A Comprehensive Analysis of Monitoring and Control Mechanisms in Operational Relocation Project at Limkokwing University, Botswana. (2024). Kelepile, Lenah Cleo. In: International Journal of Research and Innovation in Social Science. RePEc:bcp:journl:v:8:y:2024:i:5:p:1759-1771. Full description at Econpapers || Download paper |
2024 | Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources. (2024). van der Beek, T ; Aardal, K ; van Essen, J T ; Pruyn, J ; Souravlias, D. In: European Journal of Operational Research. RePEc:eee:ejores:v:313:y:2024:i:1:p:92-111. Full description at Econpapers || Download paper |
2024 | A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem. (2024). Vanhoucke, Mario ; Bredael, Dries. In: European Journal of Operational Research. RePEc:eee:ejores:v:315:y:2024:i:1:p:19-34. Full description at Econpapers || Download paper |
2024 | A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks. (2024). Vanhoucke, Mario ; Unsal-Altuncan, Izel. In: European Journal of Operational Research. RePEc:eee:ejores:v:315:y:2024:i:2:p:511-527. Full description at Econpapers || Download paper |
2024 | Analysis of the impact of corrective actions for stochastic project networks. (2024). Vanhoucke, Mario ; Vaseghi, Forough ; Martens, Annelies. In: European Journal of Operational Research. RePEc:eee:ejores:v:316:y:2024:i:2:p:503-518. Full description at Econpapers || Download paper |
2024 | A genetic algorithm for the Resource-Constrained Project Scheduling Problem with Alternative Subgraphs using a boolean satisfiability solver. (2024). Servranckx, Tom ; Vanhoucke, Mario ; Coelho, Jose. In: European Journal of Operational Research. RePEc:eee:ejores:v:316:y:2024:i:3:p:815-827. Full description at Econpapers || Download paper |
2024 | Railway crew planning with fairness over time. (2024). van Rossum, B. T. C., ; Dollevoet, T ; Huisman, D. In: European Journal of Operational Research. RePEc:eee:ejores:v:318:y:2024:i:1:p:55-70. Full description at Econpapers || Download paper |
2024 | A risk-averse distributionally robust project scheduling model to address payment delays. (2024). Hazir, Oncu ; Bruni, Maria Elena. In: European Journal of Operational Research. RePEc:eee:ejores:v:318:y:2024:i:2:p:398-407. Full description at Econpapers || Download paper |
2024 | Neural network assisted branch and bound algorithm for dynamic berth allocation problems. (2024). Liu, Ziang ; Nishi, Tatsushi ; Korekane, Shinya ; Tierney, Kevin. In: European Journal of Operational Research. RePEc:eee:ejores:v:319:y:2024:i:2:p:531-542. Full description at Econpapers || Download paper |
2024 | A matheuristic for the resource-constrained project scheduling problem. (2024). Vanhoucke, Mario ; Coelho, Jose. In: European Journal of Operational Research. RePEc:eee:ejores:v:319:y:2024:i:3:p:711-725. Full description at Econpapers || Download paper |
2024 | A three-dimensional spatial resource-constrained project scheduling problem: Model and heuristic. (2024). Li, Lubo ; Zhang, Jingwen ; Demeulemeester, Erik. In: European Journal of Operational Research. RePEc:eee:ejores:v:319:y:2024:i:3:p:943-966. Full description at Econpapers || Download paper |
2025 | A unified solution framework for flexible job shop scheduling problems with multiple resource constraints. (2025). Repoussis, Panagiotis P ; Mourtos, Ioannis ; Paraskevopoulos, Dimitris C ; Kasapidis, Gregory A. In: European Journal of Operational Research. RePEc:eee:ejores:v:320:y:2025:i:3:p:479-495. Full description at Econpapers || Download paper |
2025 | Scheduling multi-skill technicians and reassignable tasks in a cloud computing company. (2025). Tao, Jiaming ; Jin, Shuang ; Hu, Qian ; Lai, Minghui. In: European Journal of Operational Research. RePEc:eee:ejores:v:321:y:2025:i:3:p:717-733. Full description at Econpapers || Download paper |
2025 | Automatic selection of the best performing control point approach for project control with resource constraints. (2025). Song, Jinbo ; Vanhoucke, Mario. In: European Journal of Operational Research. RePEc:eee:ejores:v:322:y:2025:i:1:p:15-38. Full description at Econpapers || Download paper |
2025 | Exact solution methods for the Resource Constrained Project Scheduling Problem with a flexible Project Structure. (2025). van Essen, J T ; van der Beek, T ; Aardal, K ; Pruyn, J. In: European Journal of Operational Research. RePEc:eee:ejores:v:322:y:2025:i:1:p:56-69. Full description at Econpapers || Download paper |
2024 | . Full description at Econpapers || Download paper |
2025 | Unleashing the potential of operations research in air transport: A review of applications, methods, and challenges. (2025). Chang, Shuming ; Du, Zhuoming ; Wang, Shuang ; Sun, Xiaoqian ; Wandelt, Sebastian ; Signori, Andrea. In: Journal of Air Transport Management. RePEc:eee:jaitra:v:124:y:2025:i:c:s0969699725000092. Full description at Econpapers || Download paper |
2024 | Prediction-led prescription: Optimal Decision-Making in times of turbulence and business performance improvement. (2024). Bougioukos, V ; Nikolopoulos, K ; Karamatzanis, G ; Schafers, A. In: Journal of Business Research. RePEc:eee:jbrese:v:182:y:2024:i:c:s0148296324003096. Full description at Econpapers || Download paper |
2024 | A study on policy decisions to embed flexibility for reactive recovery in the planning and scheduling process in operating rooms. (2024). Maenhout, Broos ; Akbarzadeh, Babak. In: Omega. RePEc:eee:jomega:v:126:y:2024:i:c:s0305048324000288. Full description at Econpapers || Download paper |
2024 | Efficient optimization of robust project scheduling for industry 4.0: A hybrid approach based on machine learning and meta-heuristic algorithms. (2024). Goli, Alireza. In: International Journal of Production Economics. RePEc:eee:proeco:v:278:y:2024:i:c:s0925527324002846. Full description at Econpapers || Download paper |
2025 | A systematic review of Resilience Engineering applications to Natech accidents in the chemical and process industry. (2025). Ricci, Federica ; Valente, Matteo ; Cozzani, Valerio. In: Reliability Engineering and System Safety. RePEc:eee:reensy:v:255:y:2025:i:c:s0951832024007415. Full description at Econpapers || Download paper |
2024 | Logistic Decisions in the Installation of Offshore Wind Farms: A Conceptual Framework. (2024). Godeiro, Monalisa ; Vasconcelos, Rafael ; Melo, David ; Santiso, Andressa ; Akbari, Negar ; Jones, Dylan ; Nascimento, Gabriela ; Almeida, Mariana ; Oprime, Pedro ; Nogueira, Luana. In: Energies. RePEc:gam:jeners:v:17:y:2024:i:23:p:6004-:d:1532251. Full description at Econpapers || Download paper |
2024 | An Agile Adaptive Biased-Randomized Discrete-Event Heuristic for the Resource-Constrained Project Scheduling Problem. (2024). Juan, Angel ; Martin, Xabier A ; Herrero, Rosa ; Panadero, Javier. In: Mathematics. RePEc:gam:jmathe:v:12:y:2024:i:12:p:1873-:d:1415883. Full description at Econpapers || Download paper |
2024 | Developing a Robust Multi-Skill, Multi-Mode Resource-Constrained Project Scheduling Model with Partial Preemption, Resource Leveling, and Time Windows. (2024). Sajadi, Seyed Mojtaba ; Shahsavari-Pour, Nasser ; Khalilzadeh, Mohammad ; Hatami-Moghaddam, Ladan. In: Mathematics. RePEc:gam:jmathe:v:12:y:2024:i:19:p:3129-:d:1493246. Full description at Econpapers || Download paper |
2025 | Efficient Rollout Algorithms for Resource-Constrained Project Scheduling with a Flexible Project Structure and Uncertain Activity Durations. (2025). Chen, Qingxin ; Wang, Xiaoming ; Yu, Chunlai. In: Mathematics. RePEc:gam:jmathe:v:13:y:2025:i:9:p:1395-:d:1641757. Full description at Econpapers || Download paper |
2024 | The Continuous Time-Resource Trade-off Scheduling Problem with Time Windows. (2024). Toussaint, Hlne ; Quilliot, Alain ; Artigues, Christian ; Hbrard, Emmanuel. In: INFORMS Journal on Computing. RePEc:inm:orijoc:v:36:y:2024:i:6:p:1676-1695. Full description at Econpapers || Download paper |
2024 | Risk response budget allocation based on fault tree analysis and optimization. (2024). Servranckx, Tom ; Guan, Xin ; Vanhoucke, Mario. In: Annals of Operations Research. RePEc:spr:annopr:v:337:y:2024:i:2:d:10.1007_s10479-022-05155-8. Full description at Econpapers || Download paper |
2024 | An empirical project forecasting accuracy framework using project regularity. (2024). Martens, Annelies ; Vanhoucke, Mario ; de Andrade, Paulo Andr. In: Annals of Operations Research. RePEc:spr:annopr:v:337:y:2024:i:2:d:10.1007_s10479-023-05269-7. Full description at Econpapers || Download paper |
2024 | On the summary measures for the resource-constrained project scheduling problem. (2024). Coelho, Jos ; Vanhoucke, Mario ; Eynde, Rob. In: Annals of Operations Research. RePEc:spr:annopr:v:337:y:2024:i:2:d:10.1007_s10479-023-05470-8. Full description at Econpapers || Download paper |
2024 | Algorithms to compute the energetic lower bounds of the cumulative scheduling problem. (2024). Jouglet, Antoine ; Carlier, Jacques ; Sahli, Abderrahim. In: Annals of Operations Research. RePEc:spr:annopr:v:337:y:2024:i:2:d:10.1007_s10479-023-05596-9. Full description at Econpapers || Download paper |
2024 | Shortening the project schedule: solving multimode chance-constrained critical chain buffer management using reinforcement learning. (2024). Shtub, Avraham ; Szwarcfiter, Claudio ; Herer, Yale T. In: Annals of Operations Research. RePEc:spr:annopr:v:337:y:2024:i:2:d:10.1007_s10479-023-05597-8. Full description at Econpapers || Download paper |
2024 | Software project scheduling under activity duration uncertainty. (2024). Zheng, Linwen ; Li, Hongbo ; Zhu, Hanyu ; Xie, Fang. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05343-0. Full description at Econpapers || Download paper |
2024 | Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns. (2024). He, Yukang ; Zheng, Weibo ; Jia, Tao. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05580-3. Full description at Econpapers || Download paper |
2024 | Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective. (2024). Sanchidrian, Tamara Borreguero ; Lopez, Pierre ; Mier, Miguel Ortega ; Artigues, Christian ; Sanchez, Alvaro Garcia ; Portoleau, Tom. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05629-3. Full description at Econpapers || Download paper |
2024 | A novel framework for risk management of software projects by integrating a new COPRAS method under cloud model and machine learning algorithms. (2024). Haghighi, Mohammad Hossein ; Ashrafi, Maryam. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05653-3. Full description at Econpapers || Download paper |
2024 | An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem. (2024). Naeni, Leila Moslemi ; Gu, Hanyu ; Salehipour, Amir ; Etminaniesfahani, Alireza. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05775-8. Full description at Econpapers || Download paper |
2024 | Solving a real-life multi-skill resource-constrained multi-project scheduling problem. (2024). Dauzere-Peres, Stephane ; Torba, Rahman ; Pouzet, Juliette ; Yugma, Claude ; Gallais, Cedric. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05784-7. Full description at Econpapers || Download paper |
2024 | The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation. (2024). Kolisch, Rainer ; Melchiors, Philipp ; Kanet, John J. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-024-05841-9. Full description at Econpapers || Download paper |
2024 | A new proactive and reactive approach for resource-constrained project scheduling problem under activity and resource disruption: a scenario-based robust optimization approach. (2024). Mousavi, Seyed Meysam ; Khoshsirat, Maziar. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-024-05895-9. Full description at Econpapers || Download paper |
2024 | A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty. (2024). Emami, Saeed ; Sadeghloo, Maryam ; Divsalar, Ali. In: Annals of Operations Research. RePEc:spr:annopr:v:339:y:2024:i:3:d:10.1007_s10479-023-05403-5. Full description at Econpapers || Download paper |
2024 | Redistribution of judicial resources for improved performance. (2024). Gupta, Maansi ; Bolia, Nomesh B. In: Annals of Operations Research. RePEc:spr:annopr:v:342:y:2024:i:3:d:10.1007_s10479-023-05389-0. Full description at Econpapers || Download paper |
2024 | Solving the multisite staff planning and scheduling problem in a sheltered employment centre that employs workers with intellectual disabilities by MILP: a Spanish case study. (2024). Garcia-Manglano, Sofia ; Garcia-Sabater, Julio J ; Maheut, Julien. In: Central European Journal of Operations Research. RePEc:spr:cejnor:v:32:y:2024:i:3:d:10.1007_s10100-023-00864-2. Full description at Econpapers || Download paper |
2025 | Robust design heuristics for product costing systems: a replication and extension using an ABC cost hierarchy. (2025). Meyer, Matthias ; Schmidt, Mark. In: Journal of Business Economics. RePEc:spr:jbecon:v:95:y:2025:i:2:d:10.1007_s11573-024-01210-x. Full description at Econpapers || Download paper |
2025 | An adaptative multi-objective scatter search for solving the dynamic bin packing problem. (2025). Hifi, Mhand ; Boulebene, Sabrin ; Ader, Mziane. In: Journal of Heuristics. RePEc:spr:joheur:v:31:y:2025:i:1:d:10.1007_s10732-024-09537-y. Full description at Econpapers || Download paper |
2025 | Hybridizing constraint programming and meta-heuristics for multi-mode resource-constrained multiple projects scheduling Problem. (2025). Musliu, Nysret ; Ahmeti, Arben. In: Journal of Heuristics. RePEc:spr:joheur:v:31:y:2025:i:1:d:10.1007_s10732-024-09540-3. Full description at Econpapers || Download paper |
2024 | Dynamic personnel rescheduling: insights and recovery strategies. (2024). Vanhoucke, Mario ; Maenhout, Broos. In: Journal of Scheduling. RePEc:spr:jsched:v:27:y:2024:i:1:d:10.1007_s10951-023-00785-7. Full description at Econpapers || Download paper |
2024 | Resource leveling: complexity of a unit execution time two-processor scheduling variant and related problems. (2024). Escoffier, Bruno ; Chrtienne, Philippe ; Indrigo, Luca Brunod ; Bendotti, Pascale. In: Journal of Scheduling. RePEc:spr:jsched:v:27:y:2024:i:6:d:10.1007_s10951-024-00822-z. Full description at Econpapers || Download paper |
2025 | A solution framework for multi-skilled project scheduling problems with hierarchical skills. (2025). Vanhoucke, Mario ; Snauwaert, Jakob. In: Journal of Scheduling. RePEc:spr:jsched:v:28:y:2025:i:3:d:10.1007_s10951-025-00836-1. Full description at Econpapers || Download paper |
2025 | How artificial intelligence will transform project management in the age of digitization: a systematic literature review. (2025). Nenni, Maria Elena ; Felice, Fabio ; Forcina, Antonio ; Luca, Cristina. In: Management Review Quarterly. RePEc:spr:manrev:v:75:y:2025:i:2:d:10.1007_s11301-024-00418-z. Full description at Econpapers || Download paper |
2025 | Emerging technologies and principle-based project management: a systematic literature review and research agenda. (2025). Zadeh, Adel ; Aamer, Ammar ; Mali, Prithvi ; Bolick, Christopher. In: Management Review Quarterly. RePEc:spr:manrev:v:75:y:2025:i:2:d:10.1007_s11301-024-00419-y. Full description at Econpapers || Download paper |
2024 | Algebraic solution of project scheduling problems with temporal constraints. (2024). Krivulin, Nikolai ; Gubanov, Sergey. In: Operational Research. RePEc:spr:operea:v:24:y:2024:i:4:d:10.1007_s12351-024-00880-3. Full description at Econpapers || Download paper |
2025 | A comparative analysis of MIP formulations for the multi-mode resource-constrained independent task scheduling problem. (2025). Kharbeche, Mohamed ; Haouari, Mohamed ; Al-Khatib, Maryam. In: Operational Research. RePEc:spr:operea:v:25:y:2025:i:2:d:10.1007_s12351-025-00924-2. Full description at Econpapers || Download paper |
2024 | Risk assessment and optimal scheduling of serial projects. (2024). Zhang, Zixuan ; Chronopoulos, Michail ; Kyriakou, Ioannis ; Dimitrova, Dimitrina S. In: OR Spectrum: Quantitative Approaches in Management. RePEc:spr:orspec:v:46:y:2024:i:3:d:10.1007_s00291-023-00740-0. Full description at Econpapers || Download paper |
2024 | Gaining insight into crew rostering instances through ML-based sequential assignment. (2024). Racette, Philippe ; Quesnel, Frdric ; Soumis, Franois ; Lodi, Andrea. In: TOP: An Official Journal of the Spanish Society of Statistics and Operations Research. RePEc:spr:topjnl:v:32:y:2024:i:3:d:10.1007_s11750-024-00678-8. Full description at Econpapers || Download paper |
Year | Title | Type | Cited |
---|---|---|---|
2003 | Progress payments in project scheduling problems In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 6 |
2005 | New computational results for the discrete time/cost trade-off problem with time-switch constraints In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 7 |
2003 | NEW COMPUTATIONAL RESULTS FOR THE DISCRETE TIME/COST TRADE-OFF PROBLEM WITH TIME-SWITCH CONSTRAINTS.(2003) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 7 | paper | |
2006 | A hybrid scatter search/electromagnetism meta-heuristic for project scheduling In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 21 |
2004 | A Hybrid Scatter Search / Electromagnetism Meta-Heuristic for Project Scheduling.(2004) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 21 | paper | |
2008 | An evaluation of the adequacy of project network generators with systematically sampled networks In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 21 |
2009 | On the characterization and generation of nurse scheduling problem instances In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 9 |
2010 | A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 34 |
2010 | A hybrid scatter search heuristic for personalized crew rostering in the airline industry In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 25 |
2007 | A Hybrid Scatter Search Heuristic for Personalized Crew Rostering in the Airline Industry.(2007) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 25 | paper | |
2011 | Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 19 |
2009 | Multi-mode resource constrained pro ject scheduling using RCPSP and SAT solvers.(2009) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 19 | paper | |
2011 | A hybrid single and dual population search procedure for the job shop scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
2010 | A hybrid single and dual population search procedure for the job shop scheduling problem.(2010) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 5 | paper | |
2014 | An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 29 |
2011 | An Experimental Investigation of Metaheuristics for the Multi-Mode Resource-Constrained Project Scheduling Problem on New Dataset Instances.(2011) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 29 | paper | |
2016 | An approach using SAT solvers for the RCPSP with logical constraints In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 6 |
2017 | Capital- and resource-constrained project scheduling with net present value optimization In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 10 |
2017 | A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 7 |
2017 | A parallel multi-objective scatter search for optimising incentive contract design in projects In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
2017 | A buffer control method for top-down project control In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2018 | A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
2018 | Maximising the weighted number of activity execution modes in project planning In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2019 | A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 14 |
2019 | The impact of applying effort to reduce activity variability on the project time and cost performance In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 3 |
2019 | Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
2020 | Project schedule performance under general mode implementation disruptions In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2020 | A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2020 | The impact of a limited budget on the corrective action taking process In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 3 |
2021 | Using Schedule Risk Analysis with resource constraints for project control In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 3 |
2021 | A new algorithm for resource-constrained project scheduling with breadth and depth of skills In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
2021 | Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 4 |
2022 | The bilevel optimisation of a multi-agent project scheduling and staffing problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 0 |
2022 | Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 2 |
2022 | New summary measures and datasets for the multi-project scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 2 |
2023 | A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 3 |
2023 | A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 4 |
2023 | Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2010 | Using activity sensitivity and network topology information to monitor project time performance In: Omega. [Full Text][Citation analysis] | article | 16 |
2011 | On the dynamic use of project performance and schedule risk information during projecttracking In: Omega. [Full Text][Citation analysis] | article | 18 |
2013 | An integrated nurse staffing and scheduling analysis for longer-term nursing staff allocation problems In: Omega. [Full Text][Citation analysis] | article | 30 |
2013 | Reconstructing nurse schedules: Computational insights in the problem size parameters In: Omega. [Full Text][Citation analysis] | article | 6 |
2014 | Setting tolerance limits for statistical project control using earned value management In: Omega. [Full Text][Citation analysis] | article | 8 |
2016 | On the use of multivariate regression methods for longest path calculations from earned value management observations In: Omega. [Full Text][Citation analysis] | article | 3 |
2016 | Incentive contract design for projects: The owner׳s perspective In: Omega. [Full Text][Citation analysis] | article | 3 |
2017 | Optimised scheduling for weather sensitive offshore construction projects In: Omega. [Full Text][Citation analysis] | article | 12 |
2007 | Work Continuity Optimization for the Westerscheldetunnel Project in the Netherlands In: Review of Business and Economic Literature. [Full Text][Citation analysis] | article | 0 |
2010 | Introducing Optimization Techniques to Students: An Exam Case Distribution Model In: INFORMS Transactions on Education. [Full Text][Citation analysis] | article | 4 |
2001 | On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints In: Management Science. [Full Text][Citation analysis] | article | 24 |
2008 | Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors In: Management Science. [Full Text][Citation analysis] | article | 13 |
2007 | A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem In: Operations Research. [Full Text][Citation analysis] | article | 24 |
2013 | Analyzing the nursing organizational structure and process from a scheduling perspective In: Health Care Management Science. [Full Text][Citation analysis] | article | 3 |
2009 | Analyzing the Nursing Organizational Structure and Process from a Scheduling Perspective.(2009) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 3 | paper | |
2002 | Discrete time/cost trade-offs in project scheduling with time-switch constraints In: Journal of the Operational Research Society. [Full Text][Citation analysis] | article | 4 |
2007 | A simulation and evaluation of earned value metrics to forecast the project duration In: Journal of the Operational Research Society. [Full Text][Citation analysis] | article | 28 |
2005 | A simulation and evaluation of earned value metrics to forecast the project duration.(2005) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 28 | paper | |
2009 | The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach In: Journal of the Operational Research Society. [Full Text][Citation analysis] | article | 4 |
2008 | The Impact of Incorporating Nurse-Specific Characteristics in a Cyclical Scheduling Approach.(2008) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 4 | paper | |
2002 | OPTIMAL DUE DATE ASSIGNMENT IN PROJECT SCHEDULING In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 3 |
2004 | AN ELECTROMAGNETISM META-HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2004 | WORK CONTINUITY CONSTRAINTS IN PROJECT SCHEDULING In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 3 |
2004 | WORK CONTINUITY IN A REAL-LIFE SCHEDULE: THE WESTERSCHELDE TUNNEL In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2004 | ON THE MORPHOLOGICAL STRUCTURE OF A NETWORK In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2005 | A DECOMPOSITION-BASED HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 14 |
2005 | A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2005 | A Comparison of Different Project Duration Forecasting Methods using Earned Value Metrics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 22 |
2005 | THE DISCRETE TIME/COST TRADE-OFF PROBLEM UNDER VARIOUS ASSUMPTIONS EXACT AND HEURISTIC PROCEDURES In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 20 |
2005 | An Electromagnetic Meta-Heuristic for the Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 25 |
2005 | A simulation analysis of interactions between errors in costing system design In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 24 |
2005 | Characterisation and Generation of Nurse Scheduling Problem Instances In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2005 | New Computational Results for the Nurse Scheduling Problem: A Scatter Search Algorithm In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 3 |
2006 | An efficient hybrid search algorithm for various optimization problems In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2006 | A Comparison and Hybridization of Crossover Operators for the Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 7 |
2008 | Comparison and hybridization of crossover operators for the nurse scheduling problem.(2008) In: Annals of Operations Research. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 7 | article | |
2006 | The impact of various activity assumptions on the lead-time and resource utilization of resource-constrained projects In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 6 |
2006 | Meta-heuristic resource-constrained project scheduling:solution space restrictions and neighbourhood extensions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2006 | Pre-emptive resource-constrained project scheduling with setup times In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2006 | A scatter search procedure for maximizing the net present value of a project under renewable resource constraints In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2006 | A finite capacity production scheduling procedure for a Belgian steel company In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2007 | A genetic algorithm to investigate the trade-off between project lead time and net present value In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2007 | An electromagnetic time/cost trade-off optimization in project scheduling In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2008 | A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 2 |
2008 | Branching Strategies in a Branch-and-Price Approach for a Multiple Objective Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 6 |
2008 | Integrating the Nurse Staffing Decision and the Shift Scheduling Decision: Case Study and Policy Analysis In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2008 | The effect of project schedule adherence and rework on the duration forecast accuracy of earned value metrics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2008 | Automatic Personalized Crew Rostering at Brussels Airlines In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2008 | Improved project time performance using activity sensitivity and network topology information In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2009 | An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 2 |
2009 | A Genetic Algorithm for the Nurse Rerostering Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2009 | Reconstructing Nurse Schedules: Managerial Insights and Policy Decisions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2009 | Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 2 |
2009 | Introducing optimisation techniques to students: an exam case distribution model In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2009 | A Genetic Algorithm for the Single Machine Maximum Lateness Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2010 | Introducing Learning Effects in Resource-constrained Project Scheduling In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2010 | Comparing the accuracy of ABC and time-driven ABC in complex and dynamic environments: a simulation analysis In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2010 | A hybrid job shop procedure for a Belgian manufacturing company producing industrial wheels and castors in rubber In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2010 | A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | An Invasive Weed Optimization Algorithm for the Resource Availability Cost Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | A hybrid electromagnetism-like/tabu search procedure for the single machine scheduling problem with a maximum lateness objective In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | On the design of custom packs: Grouping of medical disposable items for surgical procedures In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | Truncated branch-and-bound guided meta-heuristics for the unrelated parallel machine scheduling problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | An Artificial Immune System based approach for solving the Nurse Re-rostering Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | Days on and days off scheduling of pilots under a variable workload In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | Solution representation, diversity and space reduction: A computational experiment with meta-heuristics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | An Artificial Immune System Algorithm for the Resource Availability Cost Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2001 | An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem In: Annals of Operations Research. [Full Text][Citation analysis] | article | 7 |
2017 | A resource type analysis of the integrated project scheduling and personnel staffing problem In: Annals of Operations Research. [Full Text][Citation analysis] | article | 1 |
2020 | Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs In: Annals of Operations Research. [Full Text][Citation analysis] | article | 0 |
2015 | Heuristic Methods for the Resource Availability Cost Problem In: International Handbooks on Information Systems. [Citation analysis] | chapter | 2 |
2015 | The Multi-Mode Resource-Constrained Project Scheduling Problem In: International Handbooks on Information Systems. [Citation analysis] | chapter | 1 |
2015 | Generalized Discrete Time-Cost Tradeoff Problems In: International Handbooks on Information Systems. [Citation analysis] | chapter | 0 |
2009 | The EVM Fundamentals In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | Beyond the EVM Fundamentals In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | A Case Study In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | A Simulation Study In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | Time Sensitivity In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | Top-down or Bottom-up Project Tracking In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | ProTrack: A Software Tutorial In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | Conclusions In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2014 | Conclusions.(2014) In: Management for Professionals. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Conclusions.(2012) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | Conclusions.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2009 | Measuring Time In: International Series in Operations Research and Management Science. [Citation analysis] | book | 0 |
2022 | Multimode time-cost-robustness trade-off project scheduling problem under uncertainty In: Journal of Combinatorial Optimization. [Full Text][Citation analysis] | article | 1 |
2020 | Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling In: Journal of Scheduling. [Full Text][Citation analysis] | article | 9 |
2014 | Project Data In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Earned Value Management In: Management for Professionals. [Citation analysis] | chapter | 5 |
2012 | Earned Value Management.(2012) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 5 | chapter | |
2013 | Earned Value Management.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 5 | chapter | |
2014 | Earned Schedule In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Schedule Adherence In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Forecasting In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Schedule Risk In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Schedule Control In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | ProTrack In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | P2 Engine In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Integrated Project Management and Control In: Management for Professionals. [Citation analysis] | book | 3 |
2017 | A metaheuristic solution approach for the time-constrained project scheduling problem In: OR Spectrum: Quantitative Approaches in Management. [Full Text][Citation analysis] | article | 4 |
2018 | The Data-Driven Project Manager In: Springer Books. [Citation analysis] | book | 1 |
2016 | Integrated Project Management Sourcebook In: Springer Books. [Citation analysis] | book | 2 |
2012 | Project Management with Dynamic Scheduling In: Springer Books. [Citation analysis] | book | 13 |
2013 | Project Management with Dynamic Scheduling.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 13 | book | |
2012 | Introduction In: Springer Books. [Citation analysis] | chapter | 0 |
2012 | Critical Chain/Buffer Management In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Critical Chain/Buffer Management.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The Mutum-Paraná II Bridge Project (B) In: Springer Books. [Citation analysis] | chapter | 0 |
2012 | The Mutum-Paraná II Bridge Project (C).(2012) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The Mutum-Paraná II Bridge Project (A).(2012) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | The Mutum-Paraná II Bridge Project (B).(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | The Mutum-Paraná II Bridge Project (C).(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | The Mutum-Paraná II Bridge Project (A).(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Advanced Topics In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Advanced Topics.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Dynamic Scheduling with ProTrack In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Dynamic Scheduling with ProTrack.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The PERT/CPM Technique In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | The PERT/CPM Technique.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The Critical Path Method In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | The Critical Path Method.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The VMW Project In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | The VMW Project.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Schedule Risk Analysis In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Schedule Risk Analysis.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Resource-Constrained Project Scheduling In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Resource-Constrained Project Scheduling.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Resource-Constrained Scheduling Extensions In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Resource-Constrained Scheduling Extensions.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The Westerschelde Tunnel Project In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | The Westerschelde Tunnel Project.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | Introduction In: Springer Books. [Citation analysis] | chapter | 0 |
2015 | Decomposition-based heuristics for the integrated physician rostering and surgery scheduling problem In: Health Systems. [Full Text][Citation analysis] | article | 0 |
2015 | Operating theatre modelling: integrating social measures In: Journal of Simulation. [Full Text][Citation analysis] | article | 0 |
2015 | On the design of custom packs: grouping of medical disposable items for surgeries In: International Journal of Production Research. [Full Text][Citation analysis] | article | 2 |
2015 | A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows In: International Journal of Production Research. [Full Text][Citation analysis] | article | 4 |
2016 | A scatter search for the extended resource renting problem In: International Journal of Production Research. [Full Text][Citation analysis] | article | 1 |
2022 | Various extensions in resource-constrained project scheduling with alternative subgraphs In: International Journal of Production Research. [Full Text][Citation analysis] | article | 1 |
CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated July, 2 2025. Contact: CitEc Team