Vlerick Business School | 14 H index 21 i10 index 593 Citations RESEARCH PRODUCTION: 61 Articles 56 Papers 6 Books 53 Chapters RESEARCH ACTIVITY: 22 years (2001 - 2023). See details. MORE DETAILS IN: ABOUT THIS REPORT: Permalink: http://citec.repec.org/pva66 |
Works with: Authors registered in RePEc who have co-authored more than one work in the last five years with Mario Vanhoucke. | Is cited by: | Cites to: |
Journals with more than one article published | # docs |
---|---|
European Journal of Operational Research | 32 |
Omega | 7 |
Annals of Operations Research | 4 |
International Journal of Production Research | 4 |
Journal of the Operational Research Society | 3 |
Working Papers Series with more than one paper published | # docs |
---|---|
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium / Ghent University, Faculty of Economics and Business Administration | 56 |
Year | Title of citing document |
---|---|
2023 | Dynamic assignment of a multi-skilled workforce in job shops: An approximate dynamic programming approach. (2023). Schmid, Verena ; Akhavan-Tabatabaei, Raha ; Annear, Luis Mauricio. In: European Journal of Operational Research. RePEc:eee:ejores:v:306:y:2023:i:3:p:1109-1125. Full description at Econpapers || Download paper |
2023 | Tabu search exploiting local optimality in binary optimization. (2023). Hennig, Rick ; Yang, Wei ; Glover, Fred ; Wang, Yang ; Hanafi, Said. In: European Journal of Operational Research. RePEc:eee:ejores:v:308:y:2023:i:3:p:1037-1055. Full description at Econpapers || Download paper |
2023 | Project scheduling under the threat of catastrophic disruption. (2023). Simonson, Peter D ; Venkateshan, Prahalad ; Szmerekovsky, Joseph G. In: European Journal of Operational Research. RePEc:eee:ejores:v:309:y:2023:i:2:p:784-794. Full description at Econpapers || Download paper |
2023 | Resource-constrained multi-project scheduling problem: A survey. (2023). Voss, Stefan ; Castro, Carlos ; Gil, Alejandro Fernandez ; Lalla-Ruiz, Eduardo ; Sanchez, Mariam Gomez. In: European Journal of Operational Research. RePEc:eee:ejores:v:309:y:2023:i:3:p:958-976. Full description at Econpapers || Download paper |
2023 | Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty. (2023). Jia, Tao ; He, Yukang ; Zheng, Weibo. In: European Journal of Operational Research. RePEc:eee:ejores:v:310:y:2023:i:1:p:34-52. Full description at Econpapers || Download paper |
2023 | A shift-based model to solve the integrated staff rostering and task assignment problem with real-world requirements. (2023). Xie, Kexin ; Wang, Wenshu ; Liang, Zhe ; Xiao, Fan ; Guo, Siqi. In: European Journal of Operational Research. RePEc:eee:ejores:v:310:y:2023:i:1:p:360-378. Full description at Econpapers || Download paper |
2024 | Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources. (2024). van Essen, J T ; Souravlias, D ; van der Beek, T ; Aardal, K ; Pruyn, J. In: European Journal of Operational Research. RePEc:eee:ejores:v:313:y:2024:i:1:p:92-111. Full description at Econpapers || Download paper |
2024 | A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem. (2024). Vanhoucke, Mario ; Bredael, Dries. In: European Journal of Operational Research. RePEc:eee:ejores:v:315:y:2024:i:1:p:19-34. Full description at Econpapers || Download paper |
2024 | A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks. (2024). Vanhoucke, Mario ; Unsal-Altuncan, Izel. In: European Journal of Operational Research. RePEc:eee:ejores:v:315:y:2024:i:2:p:511-527. Full description at Econpapers || Download paper |
2024 | Analysis of the impact of corrective actions for stochastic project networks. (2024). Vanhoucke, Mario ; Martens, Annelies ; Vaseghi, Forough. In: European Journal of Operational Research. RePEc:eee:ejores:v:316:y:2024:i:2:p:503-518. Full description at Econpapers || Download paper |
2024 | A genetic algorithm for the Resource-Constrained Project Scheduling Problem with Alternative Subgraphs using a boolean satisfiability solver. (2024). Vanhoucke, Mario ; Coelho, Jose ; Servranckx, Tom. In: European Journal of Operational Research. RePEc:eee:ejores:v:316:y:2024:i:3:p:815-827. Full description at Econpapers || Download paper |
2023 | An ex-ante method to verify commercial U.S. nuclear power plant decommissioning cost estimates. (2023). Barenbold, Rebekka ; Lordan-Perret, Rebecca ; Rosner, Robert ; Weigt, Hannes. In: Energy Economics. RePEc:eee:eneeco:v:127:y:2023:i:pb:s0140988323005212. Full description at Econpapers || Download paper |
2023 | An authority-enterprise equilibrium differentiated subsidy mechanism for promoting coalbed methane extraction in multiple coal seams. (2023). Song, Xiaoling ; Wang, Binyu ; Fan, Lurong. In: Energy. RePEc:eee:energy:v:263:y:2023:i:pa:s0360544222024276. Full description at Econpapers || Download paper |
2023 | Multi-stakeholder equilibrium-based subsidy allocation mechanism for promoting coalbed methane scale extraction-utilization. (2023). Zhang, Wen ; Ma, Ning ; Fan, Lurong. In: Energy. RePEc:eee:energy:v:277:y:2023:i:c:s036054422300974x. Full description at Econpapers || Download paper |
2024 | Performance Evaluation of Construction Sub?contractors using Ordinal Priority Approach. (2022). Javed, Saad Ahmed ; Mahmoudi, Amin. In: Evaluation and Program Planning. RePEc:eee:epplan:v:91:y:2022:i:c:s0149718921001178. Full description at Econpapers || Download paper |
2023 | Strategic workforce planning in health and social care – an international perspective: A scoping review. (2023). Prowse, Julie ; Randell, Rebecca ; Sutton, Claire ; Faisal, Muhammad ; Eyers, Emma ; O'Connell, Kate ; Tissiman, Chris ; Alvarado, Natasha ; Montague, Jane ; Neagu, Daniel ; Elshehaly, Mai ; McVey, Lynn. In: Health Policy. RePEc:eee:hepoli:v:132:y:2023:i:c:s0168851023001124. Full description at Econpapers || Download paper |
2023 | Deciding on scheduling, secrecy, and patenting during the new product development process: The relevance of project planning models. (2023). van Looy, Bart ; Leus, Roel ; Hermans, Ben. In: Omega. RePEc:eee:jomega:v:116:y:2023:i:c:s0305048322002201. Full description at Econpapers || Download paper |
2024 | A study on policy decisions to embed flexibility for reactive recovery in the planning and scheduling process in operating rooms. (2024). Maenhout, Broos ; Akbarzadeh, Babak. In: Omega. RePEc:eee:jomega:v:126:y:2024:i:c:s0305048324000288. Full description at Econpapers || Download paper |
2023 | Uncertainty in the Planning Phase of Public Projects—Its Scope, Consequences, and Possible Remedies. (2023). Capaldo, Guido ; Capone, Vincenza ; Canonico, Paolo ; Kuchta, Dorota. In: Administrative Sciences. RePEc:gam:jadmsc:v:13:y:2023:i:6:p:145-:d:1161848. Full description at Econpapers || Download paper |
2023 | The Linkage between Renewable Energy and Project Management: What Do We Already Know, and What Are the Future Directions of Research?. (2023). Pukaa, Ryszard ; Jarosz, Szymon ; Sotysik, Mariusz ; Piwowar-Sulej, Katarzyna. In: Energies. RePEc:gam:jeners:v:16:y:2023:i:12:p:4609-:d:1167551. Full description at Econpapers || Download paper |
2023 | . Full description at Econpapers || Download paper |
2023 | Optimization of Ecological and Economic Aspects of the Construction Schedule with the Use of Metaheuristic Algorithms and Artificial Intelligence. (2023). Roson, Jerzy ; Kulejewski, Janusz. In: Sustainability. RePEc:gam:jsusta:v:15:y:2023:i:1:p:890-:d:1024291. Full description at Econpapers || Download paper |
2023 | Forming Student Teams to Incorporate Soft Skills and Commonality of Schedule. (2023). Murphy, Spencer ; Letizia, Paolo ; Bryan, Nana ; Bowers, Melissa R. In: Interfaces. RePEc:inm:orinte:v:53:y:2023:i:2:p:111-127. Full description at Econpapers || Download paper |
2023 | Case Article—Pediatrician Scheduling at British Columbia Women’s Hospital. (2023). Shechter, Steven. In: INFORMS Transactions on Education. RePEc:inm:orited:v:24:y:2023:i:1:p:35-39. Full description at Econpapers || Download paper |
2023 | Resource leveling in projects with flexible structures. (2023). Zhu, Hanyu ; Zheng, Linwen ; Li, Hongbo. In: Annals of Operations Research. RePEc:spr:annopr:v:321:y:2023:i:1:d:10.1007_s10479-022-04797-y. Full description at Econpapers || Download paper |
2023 | Development of a new personalized staff-scheduling method with a work-life balance perspective: case of a hospital. (2023). Gulmez, Esra ; Emek, Murat Serdar ; Koruca, Halil Brahim. In: Annals of Operations Research. RePEc:spr:annopr:v:328:y:2023:i:1:d:10.1007_s10479-023-05244-2. Full description at Econpapers || Download paper |
2023 | Dangers in using earned duration and other earned value metrics to measure a project’s schedule performance. (2023). Gordon, Mike M ; Lowe, Timothy J ; Wendell, Richard E. In: Central European Journal of Operations Research. RePEc:spr:cejnor:v:31:y:2023:i:2:d:10.1007_s10100-022-00830-4. Full description at Econpapers || Download paper |
2023 | Effects of Prioritized Input on Human Resource Control in Departmentalized Markov Manpower Framework. (2023). Ugah, T E ; Nduka, U C ; Udom, A U ; Madukaife, M S ; Ossai, E O. In: Methodology and Computing in Applied Probability. RePEc:spr:metcap:v:25:y:2023:i:1:d:10.1007_s11009-023-10011-8. Full description at Econpapers || Download paper |
2023 | A two-phase resource-constrained project scheduling approach for design and development of complex product systems. (2023). Nouri, Mojtaba ; Ghodsypour, Seyyed Hassan ; Shahabadi, Sheida ; Gheidar-Kheljani, Jafar ; Peykani, Pejman. In: Operational Research. RePEc:spr:operea:v:23:y:2023:i:1:d:10.1007_s12351-023-00750-4. Full description at Econpapers || Download paper |
2023 | Multi-project scheduling problem under shared multi-skill resource constraints. (2023). Nanne, Mohamedade Farouk ; Babou, Hafed Mohamed ; Soukhal, Ameur ; Neron, Emmanuel ; Dhib, Cheikh ; Haroune, Meya. In: TOP: An Official Journal of the Spanish Society of Statistics and Operations Research. RePEc:spr:topjnl:v:31:y:2023:i:1:d:10.1007_s11750-022-00633-5. Full description at Econpapers || Download paper |
Year | Title | Type | Cited |
---|---|---|---|
2003 | Progress payments in project scheduling problems In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 6 |
2005 | New computational results for the discrete time/cost trade-off problem with time-switch constraints In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 7 |
2003 | NEW COMPUTATIONAL RESULTS FOR THE DISCRETE TIME/COST TRADE-OFF PROBLEM WITH TIME-SWITCH CONSTRAINTS.(2003) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 7 | paper | |
2006 | A hybrid scatter search/electromagnetism meta-heuristic for project scheduling In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 20 |
2004 | A Hybrid Scatter Search / Electromagnetism Meta-Heuristic for Project Scheduling.(2004) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 20 | paper | |
2008 | An evaluation of the adequacy of project network generators with systematically sampled networks In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 14 |
2009 | On the characterization and generation of nurse scheduling problem instances In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 9 |
2010 | A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 33 |
2010 | A hybrid scatter search heuristic for personalized crew rostering in the airline industry In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 21 |
2007 | A Hybrid Scatter Search Heuristic for Personalized Crew Rostering in the Airline Industry.(2007) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 21 | paper | |
2011 | Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 18 |
2009 | Multi-mode resource constrained pro ject scheduling using RCPSP and SAT solvers.(2009) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 18 | paper | |
2011 | A hybrid single and dual population search procedure for the job shop scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
2010 | A hybrid single and dual population search procedure for the job shop scheduling problem.(2010) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 5 | paper | |
2014 | An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 25 |
2011 | An Experimental Investigation of Metaheuristics for the Multi-Mode Resource-Constrained Project Scheduling Problem on New Dataset Instances.(2011) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 25 | paper | |
2016 | An approach using SAT solvers for the RCPSP with logical constraints In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 6 |
2017 | Capital- and resource-constrained project scheduling with net present value optimization In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 9 |
2017 | A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 4 |
2017 | A parallel multi-objective scatter search for optimising incentive contract design in projects In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
2017 | A buffer control method for top-down project control In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 0 |
2018 | A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 4 |
2018 | Maximising the weighted number of activity execution modes in project planning In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2019 | A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 12 |
2019 | The impact of applying effort to reduce activity variability on the project time and cost performance In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 2 |
2019 | Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
2020 | Project schedule performance under general mode implementation disruptions In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 0 |
2020 | A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2020 | The impact of a limited budget on the corrective action taking process In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2021 | Using Schedule Risk Analysis with resource constraints for project control In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 2 |
2021 | A new algorithm for resource-constrained project scheduling with breadth and depth of skills In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 2 |
2021 | Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 4 |
2022 | The bilevel optimisation of a multi-agent project scheduling and staffing problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 0 |
2022 | Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2022 | New summary measures and datasets for the multi-project scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 2 |
2023 | A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 0 |
2023 | A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 2 |
2023 | Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
2010 | Using activity sensitivity and network topology information to monitor project time performance In: Omega. [Full Text][Citation analysis] | article | 13 |
2011 | On the dynamic use of project performance and schedule risk information during projecttracking In: Omega. [Full Text][Citation analysis] | article | 17 |
2013 | An integrated nurse staffing and scheduling analysis for longer-term nursing staff allocation problems In: Omega. [Full Text][Citation analysis] | article | 29 |
2013 | Reconstructing nurse schedules: Computational insights in the problem size parameters In: Omega. [Full Text][Citation analysis] | article | 5 |
2014 | Setting tolerance limits for statistical project control using earned value management In: Omega. [Full Text][Citation analysis] | article | 6 |
2016 | On the use of multivariate regression methods for longest path calculations from earned value management observations In: Omega. [Full Text][Citation analysis] | article | 1 |
2017 | Optimised scheduling for weather sensitive offshore construction projects In: Omega. [Full Text][Citation analysis] | article | 10 |
2007 | Work Continuity Optimization for the Westerscheldetunnel Project in the Netherlands In: Review of Business and Economic Literature. [Full Text][Citation analysis] | article | 0 |
2010 | Introducing Optimization Techniques to Students: An Exam Case Distribution Model In: INFORMS Transactions on Education. [Full Text][Citation analysis] | article | 4 |
2001 | On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints In: Management Science. [Full Text][Citation analysis] | article | 24 |
2008 | Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors In: Management Science. [Full Text][Citation analysis] | article | 10 |
2007 | A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem In: Operations Research. [Full Text][Citation analysis] | article | 21 |
2013 | Analyzing the nursing organizational structure and process from a scheduling perspective In: Health Care Management Science. [Full Text][Citation analysis] | article | 3 |
2009 | Analyzing the Nursing Organizational Structure and Process from a Scheduling Perspective.(2009) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 3 | paper | |
2002 | Discrete time/cost trade-offs in project scheduling with time-switch constraints In: Journal of the Operational Research Society. [Full Text][Citation analysis] | article | 3 |
2007 | A simulation and evaluation of earned value metrics to forecast the project duration In: Journal of the Operational Research Society. [Full Text][Citation analysis] | article | 29 |
2005 | A simulation and evaluation of earned value metrics to forecast the project duration.(2005) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 29 | paper | |
2009 | The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach In: Journal of the Operational Research Society. [Full Text][Citation analysis] | article | 4 |
2008 | The Impact of Incorporating Nurse-Specific Characteristics in a Cyclical Scheduling Approach.(2008) In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 4 | paper | |
2002 | OPTIMAL DUE DATE ASSIGNMENT IN PROJECT SCHEDULING In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 3 |
2004 | AN ELECTROMAGNETISM META-HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2004 | WORK CONTINUITY CONSTRAINTS IN PROJECT SCHEDULING In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 3 |
2004 | WORK CONTINUITY IN A REAL-LIFE SCHEDULE: THE WESTERSCHELDE TUNNEL In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2004 | ON THE MORPHOLOGICAL STRUCTURE OF A NETWORK In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2005 | A DECOMPOSITION-BASED HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 14 |
2005 | A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2005 | A Comparison of Different Project Duration Forecasting Methods using Earned Value Metrics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 22 |
2005 | THE DISCRETE TIME/COST TRADE-OFF PROBLEM UNDER VARIOUS ASSUMPTIONS EXACT AND HEURISTIC PROCEDURES In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 20 |
2005 | An Electromagnetic Meta-Heuristic for the Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 25 |
2005 | A simulation analysis of interactions between errors in costing system design In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 24 |
2005 | Characterisation and Generation of Nurse Scheduling Problem Instances In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2005 | New Computational Results for the Nurse Scheduling Problem: A Scatter Search Algorithm In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 3 |
2006 | An efficient hybrid search algorithm for various optimization problems In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2006 | A Comparison and Hybridization of Crossover Operators for the Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 7 |
2008 | Comparison and hybridization of crossover operators for the nurse scheduling problem.(2008) In: Annals of Operations Research. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 7 | article | |
2006 | The impact of various activity assumptions on the lead-time and resource utilization of resource-constrained projects In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 6 |
2006 | Meta-heuristic resource-constrained project scheduling:solution space restrictions and neighbourhood extensions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2006 | Pre-emptive resource-constrained project scheduling with setup times In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2006 | A scatter search procedure for maximizing the net present value of a project under renewable resource constraints In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2006 | A finite capacity production scheduling procedure for a Belgian steel company In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2007 | A genetic algorithm to investigate the trade-off between project lead time and net present value In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2007 | An electromagnetic time/cost trade-off optimization in project scheduling In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2008 | A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 2 |
2008 | Branching Strategies in a Branch-and-Price Approach for a Multiple Objective Nurse Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 6 |
2008 | Integrating the Nurse Staffing Decision and the Shift Scheduling Decision: Case Study and Policy Analysis In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2008 | The effect of project schedule adherence and rework on the duration forecast accuracy of earned value metrics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2008 | Automatic Personalized Crew Rostering at Brussels Airlines In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2008 | Improved project time performance using activity sensitivity and network topology information In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2009 | An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 2 |
2009 | A Genetic Algorithm for the Nurse Rerostering Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2009 | Reconstructing Nurse Schedules: Managerial Insights and Policy Decisions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2009 | Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 2 |
2009 | Introducing optimisation techniques to students: an exam case distribution model In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2009 | A Genetic Algorithm for the Single Machine Maximum Lateness Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2010 | Introducing Learning Effects in Resource-constrained Project Scheduling In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2010 | Comparing the accuracy of ABC and time-driven ABC in complex and dynamic environments: a simulation analysis In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2010 | A hybrid job shop procedure for a Belgian manufacturing company producing industrial wheels and castors in rubber In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2010 | A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | An Invasive Weed Optimization Algorithm for the Resource Availability Cost Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | A hybrid electromagnetism-like/tabu search procedure for the single machine scheduling problem with a maximum lateness objective In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | On the design of custom packs: Grouping of medical disposable items for surgical procedures In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | Truncated branch-and-bound guided meta-heuristics for the unrelated parallel machine scheduling problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | An Artificial Immune System based approach for solving the Nurse Re-rostering Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | Days on and days off scheduling of pilots under a variable workload In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | Solution representation, diversity and space reduction: A computational experiment with meta-heuristics In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 0 |
2011 | An Artificial Immune System Algorithm for the Resource Availability Cost Problem In: Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium. [Full Text][Citation analysis] | paper | 1 |
2001 | An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem In: Annals of Operations Research. [Full Text][Citation analysis] | article | 7 |
2017 | A resource type analysis of the integrated project scheduling and personnel staffing problem In: Annals of Operations Research. [Full Text][Citation analysis] | article | 1 |
2020 | Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs In: Annals of Operations Research. [Full Text][Citation analysis] | article | 0 |
2015 | Heuristic Methods for the Resource Availability Cost Problem In: International Handbooks on Information Systems. [Citation analysis] | chapter | 2 |
2015 | The Multi-Mode Resource-Constrained Project Scheduling Problem In: International Handbooks on Information Systems. [Citation analysis] | chapter | 1 |
2015 | Generalized Discrete Time-Cost Tradeoff Problems In: International Handbooks on Information Systems. [Citation analysis] | chapter | 0 |
2009 | The EVM Fundamentals In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | Beyond the EVM Fundamentals In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | A Case Study In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | A Simulation Study In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | Time Sensitivity In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | Top-down or Bottom-up Project Tracking In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | ProTrack: A Software Tutorial In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2009 | Conclusions In: International Series in Operations Research & Management Science. [Citation analysis] | chapter | 0 |
2014 | Conclusions.(2014) In: Management for Professionals. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Conclusions.(2012) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | Conclusions.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2009 | Measuring Time In: International Series in Operations Research and Management Science. [Citation analysis] | book | 0 |
2022 | Multimode time-cost-robustness trade-off project scheduling problem under uncertainty In: Journal of Combinatorial Optimization. [Full Text][Citation analysis] | article | 0 |
2020 | Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling In: Journal of Scheduling. [Full Text][Citation analysis] | article | 6 |
2014 | Project Data In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Earned Value Management In: Management for Professionals. [Citation analysis] | chapter | 5 |
2012 | Earned Value Management.(2012) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 5 | chapter | |
2013 | Earned Value Management.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 5 | chapter | |
2014 | Earned Schedule In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Schedule Adherence In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Forecasting In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Schedule Risk In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Schedule Control In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | ProTrack In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | P2 Engine In: Management for Professionals. [Citation analysis] | chapter | 0 |
2014 | Integrated Project Management and Control In: Management for Professionals. [Citation analysis] | book | 3 |
2017 | A metaheuristic solution approach for the time-constrained project scheduling problem In: OR Spectrum: Quantitative Approaches in Management. [Full Text][Citation analysis] | article | 3 |
2018 | The Data-Driven Project Manager In: Springer Books. [Citation analysis] | book | 1 |
2016 | Integrated Project Management Sourcebook In: Springer Books. [Citation analysis] | book | 1 |
2012 | Project Management with Dynamic Scheduling In: Springer Books. [Citation analysis] | book | 11 |
2013 | Project Management with Dynamic Scheduling.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 11 | book | |
2012 | Introduction In: Springer Books. [Citation analysis] | chapter | 0 |
2012 | Critical Chain/Buffer Management In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Critical Chain/Buffer Management.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The Mutum-Paraná II Bridge Project (B) In: Springer Books. [Citation analysis] | chapter | 0 |
2012 | The Mutum-Paraná II Bridge Project (C).(2012) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The Mutum-Paraná II Bridge Project (A).(2012) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | The Mutum-Paraná II Bridge Project (B).(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | The Mutum-Paraná II Bridge Project (C).(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | The Mutum-Paraná II Bridge Project (A).(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Advanced Topics In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Advanced Topics.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Dynamic Scheduling with ProTrack In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Dynamic Scheduling with ProTrack.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The PERT/CPM Technique In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | The PERT/CPM Technique.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The Critical Path Method In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | The Critical Path Method.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The VMW Project In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | The VMW Project.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Schedule Risk Analysis In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Schedule Risk Analysis.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Resource-Constrained Project Scheduling In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Resource-Constrained Project Scheduling.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | Resource-Constrained Scheduling Extensions In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | Resource-Constrained Scheduling Extensions.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2012 | The Westerschelde Tunnel Project In: Springer Books. [Citation analysis] | chapter | 0 |
2013 | The Westerschelde Tunnel Project.(2013) In: Springer Books. [Citation analysis] This paper has nother version. Agregated cites: 0 | chapter | |
2013 | Introduction In: Springer Books. [Citation analysis] | chapter | 0 |
2015 | Decomposition-based heuristics for the integrated physician rostering and surgery scheduling problem In: Health Systems. [Full Text][Citation analysis] | article | 0 |
2015 | Operating theatre modelling: integrating social measures In: Journal of Simulation. [Full Text][Citation analysis] | article | 0 |
2015 | On the design of custom packs: grouping of medical disposable items for surgeries In: International Journal of Production Research. [Full Text][Citation analysis] | article | 2 |
2015 | A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows In: International Journal of Production Research. [Full Text][Citation analysis] | article | 4 |
2016 | A scatter search for the extended resource renting problem In: International Journal of Production Research. [Full Text][Citation analysis] | article | 1 |
2022 | Various extensions in resource-constrained project scheduling with alternative subgraphs In: International Journal of Production Research. [Full Text][Citation analysis] | article | 0 |