8
H index
7
i10 index
195
Citations
Leibniz Universität Hannover | 8 H index 7 i10 index 195 Citations RESEARCH PRODUCTION: 18 Articles 12 Papers 1 Chapters EDITOR: Books edited RESEARCH ACTIVITY:
MORE DETAILS IN: ABOUT THIS REPORT:
|
Works with: Authors registered in RePEc who have co-authored more than one work in the last five years with Stefan Helber. | Is cited by: | Cites to: |
| Journals with more than one article published | # docs |
|---|---|
| European Journal of Operational Research | 4 |
| Annals of Operations Research | 3 |
| Energies | 3 |
| IISE Transactions | 2 |
| Working Papers Series with more than one paper published | # docs |
|---|---|
| Hannover Economic Papers (HEP) / Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät | 12 |
| Year | Title of citing document |
|---|---|
| 2024 | Joint planning of dynamic wireless charging lanes and power delivery infrastructure for heavy-duty drayage trucks. (2024). Ye, Zuzhao ; Wei, Ran ; Yu, Nanpeng ; Bragin, Mikhail A. In: Applied Energy. RePEc:eee:appene:v:375:y:2024:i:c:s0306261924014120. Full description at Econpapers || Download paper |
| 2024 | Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources. (2024). van der Beek, T ; Aardal, K ; van Essen, J T ; Pruyn, J ; Souravlias, D. In: European Journal of Operational Research. RePEc:eee:ejores:v:313:y:2024:i:1:p:92-111. Full description at Econpapers || Download paper |
| 2024 | An expandable machine learning-optimization framework to sequential decision-making. (2024). Buyuktahtakin, Esra ; Yilmaz, Dogacan. In: European Journal of Operational Research. RePEc:eee:ejores:v:314:y:2024:i:1:p:280-296. Full description at Econpapers || Download paper |
| 2024 | Sharing in construction projects — On determining optimal container assignments for the on-site accommodation of trades. (2024). Dienstknecht, Michael ; Briskorn, Dirk. In: European Journal of Operational Research. RePEc:eee:ejores:v:315:y:2024:i:1:p:324-337. Full description at Econpapers || Download paper |
| 2024 | A genetic algorithm for the Resource-Constrained Project Scheduling Problem with Alternative Subgraphs using a boolean satisfiability solver. (2024). Servranckx, Tom ; Vanhoucke, Mario ; Coelho, Jose. In: European Journal of Operational Research. RePEc:eee:ejores:v:316:y:2024:i:3:p:815-827. Full description at Econpapers || Download paper |
| 2025 | Exact solution methods for the Resource Constrained Project Scheduling Problem with a flexible Project Structure. (2025). van Essen, J T ; van der Beek, T ; Aardal, K ; Pruyn, J. In: European Journal of Operational Research. RePEc:eee:ejores:v:322:y:2025:i:1:p:56-69. Full description at Econpapers || Download paper |
| 2025 | A simulation–optimization approach for capacitated lot-sizing in a multi-level pharmaceutical tablets manufacturing process. (2025). Simonis, Michael ; Nickel, Stefan. In: European Journal of Operational Research. RePEc:eee:ejores:v:324:y:2025:i:1:p:49-61. Full description at Econpapers || Download paper |
| 2024 | Optimal deployment of dynamic wireless charging facilities for electric bus route considering stochastic travel times. (2024). Bie, Yiming ; Hao, Mingjie ; Yang, Menglin ; Wang, Linhong ; Ji, Jinhua. In: Energy. RePEc:eee:energy:v:289:y:2024:i:c:s036054422303267x. Full description at Econpapers || Download paper |
| 2024 | Modular vehicles can reduce greenhouse gas emissions for departure flight baggage transportation. (2024). Chen, Zhiwei ; Shi, Xiaowei ; Li, Xiaopeng ; Qu, Xiaobo. In: Journal of Air Transport Management. RePEc:eee:jaitra:v:119:y:2024:i:c:s096969972400098x. Full description at Econpapers || Download paper |
| 2024 | Managing flexibility in stochastic multi-level lot sizing problem with service level constraints. (2024). Adulyasak, Yossiri ; Jans, Raf ; Sereshti, Narges. In: Omega. RePEc:eee:jomega:v:122:y:2024:i:c:s0305048323001214. Full description at Econpapers || Download paper |
| 2025 | An integrated approach for lot-sizing and storage assignment. (2025). Paquette, Julie ; Jans, Raf ; Xu, Chi ; Melega, Gislaine Mara. In: Omega. RePEc:eee:jomega:v:131:y:2025:i:c:s0305048324001488. Full description at Econpapers || Download paper |
| 2025 | Boarding strategies accounting for properties of the blended wing body aircraft. (2025). Jia, Xiaolu ; Dong, Yuming ; Nishinari, Katsuhiro ; Yanagisawa, Daichi. In: Physica A: Statistical Mechanics and its Applications. RePEc:eee:phsmap:v:658:y:2025:i:c:s0378437124008082. Full description at Econpapers || Download paper |
| 2024 | Integration and substitution in hybrid manufacturing and refurbishing systems. (2024). Boutarfa, Y ; Aouam, T ; Brahimi, N ; Senoussi, A. In: International Journal of Production Economics. RePEc:eee:proeco:v:274:y:2024:i:c:s0925527324001658. Full description at Econpapers || Download paper |
| 2025 | Efficient Rollout Algorithms for Resource-Constrained Project Scheduling with a Flexible Project Structure and Uncertain Activity Durations. (2025). Chen, Qingxin ; Wang, Xiaoming ; Yu, Chunlai. In: Mathematics. RePEc:gam:jmathe:v:13:y:2025:i:9:p:1395-:d:1641757. Full description at Econpapers || Download paper |
| 2024 | Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution. (2024). Boutarfa, Youcef ; Aouam, Tarik ; Brahimi, Nadjib ; Senoussi, Ahmed. In: Sustainability. RePEc:gam:jsusta:v:16:y:2024:i:17:p:7353-:d:1464636. Full description at Econpapers || Download paper |
| 2024 | Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution. (2024). Aouam, Tarik ; Brahimi, Nadjib ; Boutarfa, Youcef ; Senoussi, Ahmed. In: Post-Print. RePEc:hal:journl:hal-05030212. Full description at Econpapers || Download paper |
| 2024 | An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem. (2024). Naeni, Leila Moslemi ; Gu, Hanyu ; Salehipour, Amir ; Etminaniesfahani, Alireza. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05775-8. Full description at Econpapers || Download paper |
| 2024 | Resource overload problems with tardiness penalty: structural properties and solution approaches. (2024). Wohlert, Lena Sophie ; Zimmermann, Jurgen. In: Annals of Operations Research. RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05789-2. Full description at Econpapers || Download paper |
| 2025 | A fix and optimize method based approximate dynamic programming approach for the strategic fleet sizing and delivery planning problem. (2025). Ertogral, Kadir ; Aghazadeh, Duygu. In: Central European Journal of Operations Research. RePEc:spr:cejnor:v:33:y:2025:i:1:d:10.1007_s10100-024-00911-6. Full description at Econpapers || Download paper |
| 2024 | Evaluation of stochastic flow lines with provisioning of auxiliary material. (2024). Helber, Stefan ; Sudbeck, Insa ; Kellenbrink, Carolin. In: OR Spectrum: Quantitative Approaches in Management. RePEc:spr:orspec:v:46:y:2024:i:3:d:10.1007_s00291-023-00737-9. Full description at Econpapers || Download paper |
| 2024 | Multi-period descriptive sampling for scenario generation applied to the stochastic capacitated lot-sizing problem. (2024). Heinrichs, Nikolai ; Stadtler, Hartmut. In: OR Spectrum: Quantitative Approaches in Management. RePEc:spr:orspec:v:46:y:2024:i:3:d:10.1007_s00291-023-00743-x. Full description at Econpapers || Download paper |
| Year | Title | Type | Cited |
|---|
| Year | Title | Type | Cited |
|---|---|---|---|
| 1998 | Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 5 |
| 2015 | Scheduling resource-constrained projects with a flexible project structure In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 12 |
| 2013 | Scheduling resource-constrained projects with a flexible project structure.(2013) In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] This paper has nother version. Agregated cites: 12 | paper | |
| 2022 | Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 1 |
| 1994 | A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures In: European Journal of Operational Research. [Full Text][Citation analysis] | article | 28 |
| 2010 | A fix-and-optimize approach for the multi-level capacitated lot sizing problem In: International Journal of Production Economics. [Full Text][Citation analysis] | article | 59 |
| 2008 | A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problems.(2008) In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] This paper has nother version. Agregated cites: 59 | paper | |
| 2018 | Location Planning for Dynamic Wireless Charging Systems for Electric Airport Passenger Buses In: Energies. [Full Text][Citation analysis] | article | 11 |
| 2018 | A Generic Approach to Analyze the Impact of a Future Aircraft Design on the Boarding Process In: Energies. [Full Text][Citation analysis] | article | 2 |
| 2022 | Designing Dynamic Inductive Charging Infrastructures for Airport Aprons with Multiple Vehicle Types In: Energies. [Full Text][Citation analysis] | article | 1 |
| 2007 | Profit-oriented shift scheduling of inbound contact centers with skills-based routing, impatient customers, and retrials In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 10 |
| 2008 | Using linear programming to analyze and optimize stochastic flow lines In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 8 |
| 2011 | Using linear programming to analyze and optimize stochastic flow lines.(2011) In: Annals of Operations Research. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 8 | article | |
| 2008 | Solving a Multi-Level Capacitated Lot Sizing Problem with Multi-Period Setup Carry-Over via a Fix-and-Optimize Heuristic In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 12 |
| 2009 | Setting inventory levels of CONWIP flow lines via linear programming In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 0 |
| 2010 | Decision support for rehabilitation hospital scheduling In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 4 |
| 2011 | Dynamic capacitated lot sizing with random demand and dynamic safety stocks In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 12 |
| 2013 | Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 2 |
| 2014 | A hierarchical facility layout planning approach for large and complex hospitals In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 6 |
| 2016 | A hierarchical facility layout planning approach for large and complex hospitals.(2016) In: Flexible Services and Manufacturing Journal. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 6 | article | |
| 2014 | Quality- and profit-oriented scheduling of flexible resource-constrained projects In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 0 |
| 2017 | Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints In: Hannover Economic Papers (HEP). [Full Text][Citation analysis] | paper | 2 |
| 2018 | Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints.(2018) In: Business Research. [Full Text][Citation analysis] This paper has nother version. Agregated cites: 2 | article | |
| 2016 | Quality- and profit-oriented scheduling of resource-constrained projects with flexible project structure via a genetic algorithm In: European Journal of Industrial Engineering. [Full Text][Citation analysis] | article | 1 |
| 2004 | A New Decomposition Approach for Non-Cyclic Continuous Material Flow Lines with a Merging Flow of Material In: Annals of Operations Research. [Full Text][Citation analysis] | article | 4 |
| 2000 | Approximate analysis of unreliable transfer lines with splits in the flow of material In: Annals of Operations Research. [Full Text][Citation analysis] | article | 1 |
| 2020 | Simultaneous structuring and scheduling of multiple projects with flexible project structures In: Journal of Business Economics. [Full Text][Citation analysis] | article | 0 |
| 2019 | Quantitative approaches in production management In: OR Spectrum: Quantitative Approaches in Management. [Full Text][Citation analysis] | article | 1 |
| 2006 | Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity In: Springer Books. [Citation analysis] | chapter | 4 |
| 2018 | Contributions to stochastic models of manufacturing and service operations In: IISE Transactions. [Full Text][Citation analysis] | article | 0 |
| 2018 | Flexible versus robust lot-scheduling subject to random production yield and deterministic dynamic demand In: IISE Transactions. [Full Text][Citation analysis] | article | 0 |
CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated December, 22 2025. Contact: CitEc Team